• Title/Summary/Keyword: 교각기초

Search Result 150, Processing Time 0.03 seconds

Riprap Scour Countermeasures around Nonuniform Bridge Piers (불균일단면교각 주위의 사석 세굴 보호공)

  • Yun, Tae-Hun;Park, Gi-Du
    • Journal of Korea Water Resources Association
    • /
    • v.33 no.4
    • /
    • pp.385-392
    • /
    • 2000
  • An experimental investigation was conducted to determine the effect of a nonuniform pier on the stability of riprap placed around bridge piers. A nonuniform pier is one of which the cross-sectional dimension varies over the length of the pier and comprises a cylinder of diameter bp placed on a larger diameter of foundation bf. and the stability of riprap are significantly influenced by the height of foundation z. The critical height of foundation is defined as the height of foundation which has the same critical velocity to that of uniform pier without foundation, and it was found to be zc=0.8bf. For z

  • PDF

Scour Countermeasure using Additional Facility in front of Bridge Pier (교각일체형 세굴방지구조물에 의한 교각세굴 방지)

  • Kim, Ung Yong;Ahn, Sang Jin;Yoon, Seok Hwan
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2004.05b
    • /
    • pp.424-428
    • /
    • 2004
  • 본 연구는 장기하상변동, 단면축소세굴, 국부세굴로 일반적으로 분류되는 세굴형태 중 국부세굴의 방지를 위하여 교자 전면에서 발생하는 하강류를 차단함으로써 교각 및 교각기초를 세굴로부터 보호하여 세굴심을 감소시키기 위한 실험적 인구로서, 동시에 경제성을 확보하는 것을 목적으로 한다. 교각의 기초부의 전면에 유수방향과 대응되도록 세굴방지구조물을 설치하여 세굴방지구조물의 상부 끝단에 하강류를 방지하기 위하여 차단각을 주었고 세굴방지구조물의 폭은 교자의 폭을 고려하여 설계하였다. 이러한 세굴방지구조물은 기초에 하강류 차단 방지시설을 설치하여 세굴심의 방지효과가 약 $20\~40\%$로 나타났으며 기존의 교자기초에 설치하던 매트 및 사석보호공에 비해 경제적 시공이 가능하며, 지속적인 효과를 볼 수 있었다.

  • PDF

Analysis of Natural Frequency Change of Foundation Scour Imitation Pier Using FEM (유한요소해석을 이용한 기초세굴모의 교각의 고유진동수 변화분석)

  • Chang, Sung-Hee;Park, Byung-Cheol;Lim, Jong-Hyuk
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.183-186
    • /
    • 2010
  • 교각에서의 기초세굴 단계 및 상부구조물의 영향에 따른 진동특성을 파악하기 위해 교각 시험체를 이용하여 충격진동실험과 Midas FEA ver.2.0를 이용한 유한요소해석을 수행하였다. 기초세굴 모의는 교각시험체 기초 주위의 지반을 단계별로 굴착하였으며, 상부구조물의 영향은 철근콘크리트 블록을 제작하여 교각 시험체 위에 재하하였다. 충격진동실험과 수치해석결과, 강성이 작아지거나 질량이 커질수록 1차 모드 고유진동수도 작아지는 등 유사한 경향을 나타내었다. 대체적으로 충격진동실험으로 구한 1차모드 고유진동수는 수치해석으로 구한 값보다 작은 경향을 나타내었으며, 이는 지반의 강성변화를 수치해석 모델에서 연속적으로 반영하지 못하는 한계로 인해 발생한 오차로 판단된다. 따라서 1차 모드 고유진동수의 변화를 이용한 교각 세굴 건전성 평가를 위한 유한요소해석을 위해서는 지반물성을 보다 잘 모의할 수 있는 기법의 개발이 필요하였다.

  • PDF

A Study on the Stability of Foundation for Piers of WoljungGyo Bridge Built in Ancient Silla (신라시대 교량 월정교 교각기초의 복원안정성 연구)

  • Lee, Kwang-Wu;Hong, Gigwon;You, Seung-Kyong
    • Journal of the Korean Geosynthetics Society
    • /
    • v.18 no.4
    • /
    • pp.273-286
    • /
    • 2019
  • A derelict bridge called WoljungGyo was restored in Gyeongju, the capital city of ancient Silla. WoljungGyo was originally built in 760AD, and later rebuilt in 1280AD during the Goryeo Kingdom. The bridge lasted in working condition for at least 520 years. The bridge was uncovered to the remains of both abutments and four piers, with only one or two steps remaining. One of the foundation for piers showed evidence of partial settlement. The cause of the partial settlement is important for the successful restoration of the bridge so that an extensive investigation was carried out, which includes layer stratification by boring, 2-D stiffness profiling by surface-wave tests, and large scaled-plate load test for evaluating capacity. In addition to the field studies in the Woljunggyo bridge, 3-D finite element analysis was also conducted. Based on the results of the site investigation and the numerical analysis, it was concluded that the further ground improvement to build the piers was not necessary so that the gravels were placed and leveled underneath the existing pier stones to compensate partial settlement before the restoration.

Performance of Precast Composite Piers for Fast Construction (급속시공형 프리캐스트 합성교각의 성능)

  • Shim, Chang-Su;Chung, Young-Soo;Yoon, Jae-Young;Park, Ji-Ho
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.221-224
    • /
    • 2008
  • Recently various types of prefabricated pier has been developed. In this paper, prefabricated composite columns with core steel elements embedded in concrete were proposed, which has no prestressing. Based on the previous research on composite columns with low steel ratio, the column were designed. A simple bolt connection detail between a footing and a pier element were also suggested. In order to investigate the seismic performance of the composite columns, several tests on concrete encased composite columns, which are prefabricated, were performed. Quasi-static tests were carried out and their performance was evaluated and compared with the results from the tests on CIP composite piers. In the case of precast piers, the end part of the pier needs to be carefully reinforced and related recommendations on details were derived.

  • PDF

Integrity Assessment of Spread Footing Pier for Scour Using Natural Frequency (고유진동수를 이용한 확대기초 교각의 세굴 건전성 평가)

  • Park, Byung-Cheol;Oh, Keum-Ho;Park, Seung-Bum
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.5 no.2 s.17
    • /
    • pp.29-35
    • /
    • 2005
  • In Korea more than ninety bridges are collapsed every year by flood, which causes the scour of pier foundation. Researches on the quantitative assessment method to assess the integrity of bridge against scour have not been organized systematically in the bridge design practice and maintenance area. In this study, dynamic characteristics assessment experiments are carried out as an emergency inspection method to assess the integrity of the pier foundation for scour after a flood. According to the dynamic characteristics assessment experiment, which simulates foundation scour of the spread footing pier, foundation scour can be evaluated by the first mode natural frequency of the pier.

Precast Segmental PSC Bridge Columns with Precast Concrete Footings : I. Development and Verification of System (조립식 기초부를 갖는 프리캐스트 세그먼트 PSC 교각 : I. 시스템 개발 및 검증)

  • Kim, Tae-Hoon;Park, Se-Jin;Kim, Young-Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.4A
    • /
    • pp.395-405
    • /
    • 2009
  • The purpose of this study was to investigate the performance of precast segmental PSC bridge columns with precast concrete footings. The proposed system can reduce work at a construction site and makes construction periods shorter. The precast concrete footings is intended to support precast segmental PSC bridge columns and provides an alternative to current cast-inplace systems, particularly for areas where reduced construction time is desired. Shortened construction time, in turn, leads to important safety and economic advantages when traffic disruption or rerouting is necessary. A model of precast segmental PSC bridge columns was tested under a constant axial load and a cyclically reversed horizontal load. In the companion paper, the experimental and analytical study for the performance assessment of precast segmental PSC bridge columns with precast concrete footings is performed.

Comparison of Modeling Methods of a Pile Foundation in Seismic Analysis of Bridge Piers (교각의 내진설계를 위한 말뚝기초의 모델링 기법 비교)

  • 김나엽;김성렬;전덕찬;김명모
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.6 no.6
    • /
    • pp.25-32
    • /
    • 2002
  • In the seismic designing of bridges, the pile foundation of bridge piers generally have been modeled to have a fixed end for its convenience and conservative designing. The fixed-end assumption, however, produces very conservative results in terms of the pier forces. Therefore, many other design methods are evolved to consider the flexibility of the pile foundation. In this study, the response spectrum analysis was performed for a bridge pier having a pile foundation. The shear force, moment, and displacement, which occurred at the pier column under an earthquake loading, were compared to analyze the effects of the modeling method, soil condition and the input earthquake response spectrum. In most cases, the fixed-end model gives larger design forces than flexible foundation models. However, when a long period earthquake is applied to the bridge pier on a soft clay foundation, it is found that the flexible foundation models give larger design forces than the fixed-end model. In the end, the reliability of several flexible foundation models was verified by comparing their results with those of a numerical analysis that considers the soil-structure interaction phenomenon in a rigorous manner.

Behavior of the Foundation of Concrete Filled Steel Tubular Pier (CFT 교각 기초부의 거동특성)

  • Lee, Ha-Lim;Kim, Hee-Ju;Hwang, Won-Sup
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.24 no.5
    • /
    • pp.491-498
    • /
    • 2011
  • In this paper, extensive structural behavior and effects of design parameters of steel column-base plate connections under axial and lateral loads were investigated to improve structural details of CFT(Concrete Filled Steel Tube) pier foundation using commercial FE analysis program, ABAQUS. For this study, design criteria of pier foundation was analyzed and numerical study based on the experiment of previous study was conducted to verify analysis methods. The failure behavior and stress distribution of pier foundation were analyzed using the verified analysis method. Various design parameters(base plate, deformed bar, stiffness and sizes of column) were investigated to analyze effects of each design parameters in entire structure.

An Experimental Study on Seismic Performance of Precast Segmental PSC Bridge Piers with Precast Footings (프리캐스트 기초부를 갖는 조립식 PSC 교각의 내진성능에 관한 실험적 연구)

  • Kim, Tae-Hoon;Park, Se-Jin;Kim, Young-Jin
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2009.05a
    • /
    • pp.451-452
    • /
    • 2009
  • The purpose of this study was to investigate the seismic performance of precast segmental PSC bridge piers with precast footings. A model of precast segmental PSC bridge piers with precast footings was tested under a constant axial load and a cyclically reversed horizontal load.

  • PDF