• Title/Summary/Keyword: 관리 기간

Search Result 3,974, Processing Time 0.028 seconds

A study on the construction of records management criteria (기록관리기준 조사 및 작성에 관한 연구)

  • Lee, Mi-young
    • The Korean Journal of Archival Studies
    • /
    • no.15
    • /
    • pp.185-218
    • /
    • 2007
  • With the reform of records management law, the organization should manage a new criteria scheme of record management based on business task and process. The new criteria scheme includes business explanation, preservation period, cause of setting up preservation period and opening information, access authority, keeping records or not. In the past, there were also some regulations and criteria but, records management criteria should be managed systematically and rationally than past in electronic environment. In this study, some previous cases about records management criteria constructing and operating were introduced first. And various characters about records management criteria were reviewed after that, process sample and methodology were proposed for construction of each criteria. If the records management criteria were constructed properly according to goals and objectives of records management and the results were managed through electronic system, the consistency of records management will be kept well and value changes of business and records will be reflected dynamically.

Analysis of the Hydrological Characteristics of the Chantancheon Catchment 2018 (2018년 차탄천 유역의 수문학적 특성 분석)

  • Kim, Dong Phil
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2019.05a
    • /
    • pp.344-348
    • /
    • 2019
  • 우리나라는 전 국토의 70%가 산지이고 하천경사가 다른 나라에 비해 상대적으로 급하여 홍수 관리에 매우 불리한 조건을 가지고 있으며, 특히 홍수기간의 집중호우 및 돌발홍수는 인명과 재산의 막대한 피해를 입히고 있다. 최근은 기후변화로 인하여 극심한 홍수, 가뭄 등 재해의 발생빈도가 증가하는 추세로 기후변화의 영향을 최소화할 수 있는 수재해 방재관리가 필요한 상황이다. 중 대하천의 경우에는 비교적 수재해 방재관리가 잘 이루어지고 있으나, 소하천(일부 중하천 포함)의 경우에는 취약한 구조를 보이고 있다. 특히 홍수기간(7월~9월)의 인명과 재산의 피해는 주로 소하천 위주로 발생하고 있으며, 사전 사후의 체계적인 대응이 이루어지지 못하고 있다. 수재해 방재관리를 위해서는 일차적으로 수문자료의 획득에 있으며, 그 이후 해당유역에 적합한 수재해 대응을 위한 체계적인 방법론과 방재시스템 개발 운영이 수반되어야 안전한 방재관리를 할 수 있다. 따라서 수재해 방재관리 체계를 구축하기 위해서는 중 소규모 유역 단위를 대상으로 지속적이고 신뢰성 있는 자료의 획득과 축적이 중요하므로 중 소규모 유역 단위의 대표성 있는 시험유역의 운영은 매우 의미가 있다고 볼 수 있다. 본 논문에서는 한국건설기술연구원에서 운영하는 차탄천 시험유역(유역면적 $190.64km^2$, 유로경사 0.96%, 경기도 연천군 소재)의 신뢰성 높은 2018년 관측자료를 이용하여 강우특성, 유출특성, 증발산량 등 수문특성을 분석하였으며, 과거 관측결과와 비교하였다. 강우특성 분석으로는 호우사상 분리, 주요 호우사상 분석, 지속기간별 최대강우량, 시간분포 등이 있다. 2018년은 2017년보다 최대 강우지속기간은 적게, 평균 강우지속기간은 크게, 최대 강우강도는 크게, 평균 강우강도는 적게 나타나는 호우의 특징을 보이고 있다. 2018년 지속기간별 최대강우량의 경우 지속기간 1시간까지는 2017년과 유사한 패턴을 보이나 그 이후는 많은 강우량을 보인다. 2018년의 하천유출률은 총강우량 대비 43.3%(장진교, 유역출구)와 70.3% (보막교, 중간소유역)로 2017년의 장진교(53.1%)와 보막교(60.4%)와는 차이를 보인다. 강우-유출특성 분석결과 연간 총강우량의 증가로 산지가 발달한 보막교는 9.9%의 증가가 있었지만 장진교는 오히려 9.8%의 감소가 있었다. 동일한 유역에서의 하천유출량의 차이는 2개 유역간 강우량 차이(96.1mm)와 토지이용(중 하류부농경지 발달)의 차이에 기인한다고 볼 수 있다. 그리고 2018년의 증발산량은 총강우량 대비 장진교(유역출구)는 32.3%로 2017년 장진교의 38.4%보다는 감소한 값을 보이나 2018년의 증발산량은 424.8mm, 2017년은 427.4mm로 양적의 차이는 거의 없는 것으로 분석되었다. 이와 같이 산정된 수문자료는 수재해 방재와 유역의 물순환 과정 규명을 위한 기초자료로 매우 유용하게 활용되므로 지속적인 시험유역의 운영은 매우 필요하다.

  • PDF

A Study on the Development of Case Management Program for Arthralgia in Customized Visiting Health Care (맞춤형 방문건강관리사업에서의 관절통증 사례관리 프로그램 개발 연구)

  • Lee, Moo-Sik
    • Proceedings of the KAIS Fall Conference
    • /
    • 2009.12a
    • /
    • pp.474-478
    • /
    • 2009
  • 본 연구는 2008년 맞춤형 방문건강관리사업에 사용되고 있는 관절통증을 중심으로 한 사례관리를 수정 보안하여 우리나라 실정에 맞는 관절통증 사례관리 프로그램을 개발, 제안하며, 맞춤형 방문건강 관리사업의 활성화와 완성도를 높이는데 있다. 연구방법으로는 2007년 전국 12주 관절통증 사례관리 결과자료 분석하고, 전국 253개 보건소의 맞춤형 방문건강관리사업 인력에 대한 자료 분석과 전국 보건소 전문가 자문회의와 토론 결과를 통해 설문지를 수정 보완하여 2008년도 충청남도 관절통증 12주 사례관리를 실시하였다. 자료분석은 SPSS 12.0 통계 프로그램을 이용하여, p-value가 0.05 미만과 0.01미만인 경우를 통계적으로 유의한 것으로 판정하였으며, 전국자료는 빈도분석, wilcoxon 부호순위 검정과 McNemar's 검정을 실시하였으며, 12주의 관절통증 사례관리의 연구기간동안 수집된 자료를 1주와 8주간, 1주와 12주간, 8주와 12주간을 paired t-test 검정과 McNemar's 검정을 실시하여 유의성 평가를 실시하였다. 연구결과는 다음과 같다. 12주 기간 동안 사전 사례관리 방문간호사의 교육을 통한 사례관리 서비스의 강도의 조절 및 매주로 서비스의 횟수를 조절하여 사례관리를 실시한 결과 총 109개 항목에서 1주와 8주간에 유의한 항목은 TG(mg/dl)를 비롯한 51개 항목, 1주와 12주간에는 콜레스테롤(mg/dl)을 비롯한 53개 항목, 8주와 12주간에는 지난 48시간동안 관절통증 점수를 비롯한 3개 항목으로 유의한 차이를 볼 수 있었으며, 1주와 8주간은 유의하나 1주와 12주간은 유의하지 않게 나타나는 항목은 TG(mg/dl)를 비롯한 3개 항목, 1주와 8주간은 유의하지 않다가 1주와 12주간은 유의하게 나타나는 항목은 콜레스테롤(mg/dl)를 비롯한 6개 항목, 1주, 8주, 12주간의 모든 기간에서 유의한 항목은 지난 48 시간동안 관절통증 점수를 비롯한 3개 항목으로 조사되었다. 결론적으로 현재 우리나라에서 추진되고 있는 맞춤형 방문건강관리 사업의 사업지침에 대한 보완을 위해 관절통증사례관리 프로그램에 있어 중재 서비스 또는 프로그램의 기간은 12주간에서 8주간으로 조정 되어야 하며, 추가가 필요한 항목으로는 교육, 자기역량 강화, 운동처방, 물리치료, 약물치료, 대체요법, 식이, 영양, 생활지도 등이며, 어골도 분석을 위한 기본 틀 및 주요 구성요소를 제시 및 기여 요인 및 결정요인을 위한 논리적 모형 제시가 필요하며, 개선목표를 위한 유지증진 및 관리능력, 지기 관리 수행도 개선과 대상자별 맞춤형 사례관리를 위한 표준화된 행동 체크리스트 제작 보급 및 사례별 운동, 물리치료 지도 방법 계획 수립에 대한 인력 충원이 필요하다.

  • PDF

Development of a standard operation of agricultural reservoir (농업용저수지 운영표준안 개발)

  • Lee, Kwang-Ya;Kim, Hae-Do;Joo, Jin-Hun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.118-118
    • /
    • 2011
  • 농림수산식품부에서 추진중인 "농업용저수지 둑높이기사업"의 기본 목표는 이 치수측면에서 농업지역 관개용수의 공급과 함께 하류하천 지역용수의 공급이고, 더불어 재해측면에서 취약한 농업용저수지를 보강하는 것이다. 하드웨어적으로는 수자원의 확보를 위해 저수지의 둑을 높이는 방법을 선택한 반면에 소프트웨워적인 물관리 운영의 측면은 운영기법이 정립되어 있지 못하다. 특히, 사업후 용수공급대상이 달라지는 만큼 기존 공급시스템 및 관리방식으로는 효과적인 공급이 될 수 없기 때문에 새로운 체계의 시스템이 필요하고, 확보된 수자원의 배분 관리에 따른 각종 민원 및 사회적 갈등 방지를 위한 기준 검토 및 대책 마련이 시급하다. 또한, 최근 부각된 기후변화에 대비할 수 있는 이 치수측면의 운영기준의 마련이 필요하다. 따라서 본 연구에서는 농업용 저수지 둑높이기사업을 통해 재개발되고 있는 농업용저수지에 대한 물관리 운영 표준안을 개발하고자 한다. 농업용저수지의 수문학적 특성은 비교적 소규모이고, 하천의 최상류에 위치해 있으며, 유역의 형태별로 유출특성이 지역에 따라 매우상이하다는 것이다. 또한 농업용저수지의 용수공급은 기존에는 관개용 목적의 농업용수공급만을 목적으로 건설되었기 때문에 홍수조절능력이 없으며 지역의 기상에 따라 관개기와 비관개기 그리고 갈수기와 홍수기로 구분하여 저수지를 관리하고 있는 특징이 있다. 농업용저수지의 저수율관리와 방류량 결정이 운영방안의 핵심사항으로 지금까지는 논농업 기간의 용수공급과 홍수기 재해대비를 위한 저수율 조정에 초점이 맞추어져 왔다. 또한 기존 물관리는 특정기간에 집중적으로 방류하고 이앙기가 끝나면 대부분 장마가 시작되어 크게 한발의 영향을 받지 않았으며, 농업용저수지의 공급량 결정도 논농업의 작부체계와 기상조건을 고려한 필요수량 계산으로 이루어졌기 때문에 물관리가 비교적 간단하였다. 하지만 둑높이기사업 후 기존 농업용수를 공급함과 동시에 하천유지용수를 연중 공급해야 하기 때문에 경험적 물관리로는 갈수기간 동안의 물관리 및 홍수기 동안의 저수율 조정 문제를 해결할 수 없다. 따라서 기왕의 경험적 용수공급에서 탈피하고 가이드라인에 의한 방류가 이루어져야 용수목적별 공급이 원활하게 이루어질 수 있으며, 이를 위해서는 물수지 분석 등 기술적으로 분석해야하는 과정을 종합하여 관리자가 쉽게 운영할 수 있도록 의사지원체계가 구축되어야 한다.

  • PDF

A Study on Improving Records Management Standard Tables for Local Governments: Focused on the Construction and Architecture (지방자치단체 기록관리기준표의 개선방안에 관한 연구 - 건설건축분야를 중심으로 -)

  • Lee, Hui-Jun;Chung, Yeon-Kyoung
    • Journal of the Korean BIBLIA Society for library and Information Science
    • /
    • v.27 no.1
    • /
    • pp.5-25
    • /
    • 2016
  • This study attempts to suggest an improvement plan of the currently prescribed record classification standard table as the guidance to select and assess the public records of local governments. For this purpose, this study utilized the methodologies of literature review, survey, and experts' assessments. It investigated the current situation on unit tasks and preservation periods targeting major functions of 'construction and architecture' in the record management standard table in the 9 provinces, and it also deduced the characteristics and problems of unit task and preservation period by comparing and analyzing the unit task and preservation period utilized in more than 3 provinces. Based on the results from the analysis on the current situation and comparison, this study deduced the new unit tasks and preservation periods. And the evaluation targeting practitioners and expertise was conducted, and then the revised design plan was finally presented 4 medium- function items, 18 small - function items operated in more than 4 provinces, 47 unit task items, which led to the total 69 items. This study can be utilized as a guidance for establishing the record management standard table based on the uniqueness and originality of public record of local governments and the task function and organization of institutions in the future.

A Study on Estimation Model of Construction Duration for Public Construction (공공건설공사 공사기간 산정모델에 관한 연구)

  • Kim, Byeong-Soo;Chun, Jin-Ku
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.142-151
    • /
    • 2005
  • On public constructions, that the first planed projects delay than the scheduled completion day occurrence frequently because gap between the scheduled construction durations and the actual construction durations. These facts connect with not only problems of the construction during as the construction delay but also brought about the distribution costs increase as the failure of facility use plan and the people discomfort weight, failure of the production and the supply using facility then tremendous loss of each part etc. For reduce these loss, it must improve accuracy of the scheduled construction duration estimating when it order. This study try contribute to a successful manage of public project and reduce the construction duration extension frequent of the construction during, and then ensure the suitable construction duration by present the estimation model of the scheduled construction duration that include the construction duration correct element using as an index on the scheduled construction duration estimation.

A System of Software Asset Management in Company using the Network (네트워크를 이용한 사내 소프트웨어 자산관리 시스템)

  • Lee, Young-Gyo;Park, Jin-Kyu
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2013.01a
    • /
    • pp.31-32
    • /
    • 2013
  • 기업에서 사용하고 있는 업무 및 개발용 컴퓨터상에 비인가 불법 소프트웨어를 무단히 설치하여 불법적으로 사용하는 것은 컴퓨터에서 발생하는 각종 오류의 원인이 되고 있으며 또한 해당 소프트웨어에 대한 저작권 침해를 발생시킨다. 따라서 본 논문에서는 네트워크를 통해 사내 여러 PC에서 설치 및 운영되는 소프트웨어들을 관리해주는 사내 소프트웨어 자산관리 시스템을 제안한다. 본 시스템에서는 사내 중앙 서버에 데이터베이스를 두어 보유하고 있는 각종 소프트웨어에 대한 라이센스를 관리한다. 사내 각 PC에서는 소프트웨어들에 대한 사용시 서버에게 사용허가 요청을 하게 되며 서버는 라이센스 수 초과여부, 컴퓨터 동시 사용 대수 제한, 사용 기간 제한 등의 설정확인을 통해 사용허가 요청에 응답하게 된다. 이러한 사용허가는 각 소프트웨어의 설치시뿐만 아니라 사용시에도 이루어져서 라이센스 유효기간의 경과 및 정책변경에 따라 신속하게 반영, 관리되어질 수 있다.

  • PDF

Development Term Index for effective ITIL Change Management (효율적인 ITIL 변경관리 프로세스를 위한 개발기간 지표)

  • Ma, Soo-Jung;Kim, Jin-Hyung
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2006.11a
    • /
    • pp.499-502
    • /
    • 2006
  • 기업의 IT 환경이 시스템 중심에서 비즈니스 중심으로 바뀌어감에 따라 IT 서비스 관리 프로세스 구축에 대한 가이드를 제공하는 Information Technology Infrastructure Library(ITIL) 모델이 나왔다. ITIL 적용이 가장 큰 목적은 IT 업무 프로세스 개선을 통한 서비스 품질 개선과 서비스 비용 절감이다. 변경관리 IT 환경의 모든 사고 및 변경에 관해 효율적이고 신속한 처리를 위한 표준화된 방법과 절차를 사용하는 ITIL 의 Service Support 의 한 영역이다. 그러나 기존 모델에는 우선순위, 업무범위등 처리절차에 대해 선진사례가 나와있는 반면 일정에 대한 신뢰성이 없다는 문제점이 있다. 따라서 본 논문에서 프로젝트 관리에서의 일정관리 개념을 도입하고 Goal Question Metrics(GQM) 기법을 사용하여 일정관리의 신뢰성을 부여할 수 있는 개발기간 지표를 제안한다. 또한 이러한 지표의 타당성 검증을 위해 S 사의 데이터를 비교 분석한다. 결과적으로 제안하는 지표를 통하여 조직운영의 효율성과 비즈니스에 초점을 맞춘 IT 서비스를 제공할 수 있다.

  • PDF

Sales Forecasting for Inventory Control on Seasonal fashion product (계절유행상품 재고관리를 위한 판매예측)

  • 안봉근
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2002.05a
    • /
    • pp.953-959
    • /
    • 2002
  • 계절유행상품의 수요는 연중 성수기가 길지 않고 매년 유행과 제품디자인 변화가심한 경향이 있어 수요예측에 과거의 판매정보의 유용성이 크지 않다. 성수기 초반의 수요가 연간 수요결정에 매우 중요하며 후반부수요가 급격히 감소하는 특성이 있다. 반면 이월상품의 잔존가치가 매우 낮지만 매출마진이 높아 수요예측의 정확도에 따라 수익률이 큰 영향을 받는다. 이러한 이유로 기존의 수요예측방법을 계절상품에 적용하기에 무리가 따르며 예측오차의 비용이 매우 커서 계절상품 관리에 이용할 수 없다. 본 연구에서 성수기를 하위기간으로 구분하여 시즌 초반부 수요발생시점을 측정하여 초반부 기간별수요량을 구하고 이를 근거로 기간 누적수요비율을 quantile regression에 의거 추정하여 기간별 수요량과 전제 수요량을 예측하는 방법을 제시하고 모의자료를 사용하여 이 모형의 우수성을 평가하였다.

  • PDF

Foreign Exchange Risk Exposure and Risk Premium in Korean Stock Market (한국주식시장에서 환율위험노출과 환율위험 프리미엄 측정)

  • Yu, Il-Seong
    • The Korean Journal of Financial Management
    • /
    • v.17 no.2
    • /
    • pp.229-256
    • /
    • 2000
  • 주식시장에서 환율위험프리미엄의 존재유무는 기업의 투자 및 자본조달, 외환헤징재무활동, 개인의 투자전략 등에 중요한 영향을 미치게 된다. 본 연구에서는 차익거래모형을 이용하여 우리나라 주식시장에서 환율위험노출을 측정하고, 그 환율위험이 시장에서 보상되는 위험인가를 검정한다. 전체 표본기간은 1980년부터 1998년까지이며, 외환자유화와 자본시장 개방이 본격적으로 이루어진 1992년 이전과 이후를 하위기간으로 구분하여 분석하였다. 표본하위기간의 설정, 다각적인 환율위험요인 측정, 다양한 모형설정과 복수의 통계추정방법의 적용 등을 통하여 환율위험 프리미엄의 유무에 관련된 신뢰성있는 결론을 도출하고자 하였다. 1980년대 표본전기 하위기간에는 주식시장에서 통계적으로 유의한 환율위험노출을 확인하기 어려웠으나, 외환자유화와 자산시장개방이 본격화된 표본 후기 하위기간에는 뚜렷한 환율위험 의 존재를 확인할 수 있었다. 후기 하위기간을 대상으로 시장위험과 실효환율위험만을 포함한 차익거래모형을 적용하였을 때에 통계적으로 유의한 환율위험 프리미엄이 확인되었다. 그러나 달러환율과 엔화환율위험을 별개의 환율위험으로 설정한 경우 각 환율위험에 개별적으로나 결합적으로 통계적으로 유의한 위험프리미엄을 발견하지 못하였다. 더구나, 실효환율위험에 추가하여 산업생산위험, 인플레이션위험, 기업부도위험 등의 기본적 경제요인 위험을 함께 통제변수로서 포함하여 차익거래모형을 적용하였을 때에도 환율위험 프리미엄은 존재하지 않았다.

  • PDF