• Title/Summary/Keyword: 관리프로세스 비효율

Search Result 152, Processing Time 0.031 seconds

An Empirical Study on the Leadership for Successful Knowledge Management Systems Development (성공적인 지식관련시스템 구축을 위한 리더십에 관한 연구)

  • Lee, Byung-Ku;Lee, Kyung-Hwan;Kim, Jong-Weon
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.11 no.5
    • /
    • pp.86-97
    • /
    • 2006
  • Many organizations are operating knowledge management(KM) for their competitive advantage in dynamically changeable markets. To support KM successfully, they are considerably investing in knowledge management systems(KMS) development. By using KMS, organizations can lead to the improvement of their employees' knowledge level and the removal of inefficient tasks, consequently resulting in their competitive edge. On the basis of the power process perspective, this study investigates the CEO leadership and its organization's performance for successful development of KMS.

  • PDF

A Cooperative Swimlane Workflow Modeling System Architecture (실시간 협업 지원 협동 스윔레인 워크플로우 모델링 시스템 아키텍처)

  • 이정훈;오동근;한승혁;김형목;원재강;김민홍;김광훈
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2003.04a
    • /
    • pp.563-565
    • /
    • 2003
  • 기업 업무의 절차와 규모가 복잡해지고 증가함에 따라 한 사람이 기업의 모든 업무 프로세스를 모델링하고 관리하는 것이 어려워지고 있다. 기존의 Workflow 모델링 방식은 프로세스 정의를 한 명(또는 소수)의 디자이너가 맡아 왔다. 그러나 스윔레인 같은 롤 기반의 프로세스 모델링은 각 롤에 해당하는 디자이너 그룹이 프로세스를 정의하기 때문에 모델링 작업을 단순화 시킬 수 있다. 본 논문에서는 워크플로우 모델링 방식과 다른 역할 기반의 스윔레인 모델링을 바탕으로 그룹웨어기술을 접목 시켜 기업의 업무 프로세스를 보다 효율적으로 정의할 수 있는 실시간 협업 지원 협동 스윔레인 워크플로우 모델링 시스템 아키텍처를 제시한다. 이벤트 방식의 화면 처리는 네트워크 트래픽 및 오버 헤드를 감소 시킬 수 있다. 또한 분리된 어플리케이션이 비동기적으로 신뢰성 있게 통신할 수 있도록 메시징 시스템을 도입하고, 협업간 투명성(Transparency)을 보장하는 가상 협업 서버 구조를 살펴 볼 것이다. 이러한 것들은 향후 분산환경으로의 발판을 이를 수 있다.

  • PDF

An Efficient Intrusion Detection System By Process State Monitoring (프로세스 상태 모니터링을 통한 효율적인 침입탐지시스템)

  • 남중구;임재걸
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2001.10a
    • /
    • pp.664-666
    • /
    • 2001
  • 침입탐지의 종류를 탐지 방법 측면에서 구분해보면 크게 이상탐지와 오용탐지로 나뉘어진다. 침입탐지의 주된 목적은 탐지오류를 줄이고 정확한 침입을 판가름하는데 있다. 그러나 기존의 이상탐지와 오용탐지 기법은 그 방법론상에 이미 판단오류 가능성을 내포하고 있다. 이상탐지는 정상적인 사용에 대한 템플릿을 기초로 하므로 불규칙적인 사용에 대처할 수 없고, 오용탐지는 침입 시나리오라는 템플릿에 기초하므로 알려지지 않은 침입에 무방비 상태인 문제가 있다. 침입의 주요 목적은 관리자의 권한을 얻는 것이며 그 상태에서 쉘을 얻은 후 원하는 바를 행하는 데 있을 것이다. 그러므로 그 상태를 얻으려는 프로세스와 추이와 결과를 모니터링하여 대처하면 호스트기반 침입의 근본적인 해결책이 될 수 있다. 그러므로 본 연구에서는 프로세스의 상태를 모니터링함으로써 컴퓨터시스템의 침입을 탐지하는 새로운 기술에 대해 제안하고 설명한다. 프로세스의 상태는 일반상태, 특권상태 관리자상태 등으로 구분되며, 시스템에 의해 부여된 실사용자ID, 유효ID, 실그룹ID, 유효그룹ID를 점검함으로써 이루어진다. 본 연구에서 모니터링에는 BSM을 사용하며, 호스트기반에서 사용한 프로세스의 상태 모니터링에 의한 침입탐지시스템 구현한다.

  • PDF

An Efficient Management Scheme for Page Cache in Linux (리눅스 페이지 캐시에 대한 효율적인 관리 기법)

  • 이명진;차현욱;이수인;이은규;김명철
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2000.10c
    • /
    • pp.97-99
    • /
    • 2000
  • 운영체제의 성능을 향상시키기 위해서는 효율적인 메모리 관리가 필수적이다. 시스템에서는 존재하는 크기의 메모리보다 더 큰 크기의 메모리 공간을 요구하는 경우가 빈번히 발생한다. 이 문제를 극복하기 위해서 운영체제에서는 가상 메모리(virtual memory)를 사용한다. 리눅스 가상 메모리 지원 방식에는 요구 페이징(demand paging), 스왑핑(swapping), 공유 가상 메모리(shared virtual memory)가 있다. 이런 방식을 효율적으로 지원하기 위해서 리눅스는 캐시를 사용한다. 본 논문에서는 페이지 해시 리스트에서 페이지를 찾는 알고리즘을 수정하여 새로운 페이지 캐시 관리 기법을 제안한다. 이 방법은 탐색한 페이지를 해시 리스트의 헤드(head)로 옮김으로써 다음 탐색 때 그 페이지를 찾는데 필요한 탐색 회수를 줄일 수 있다는 장점을 갖는다. 또한 다른 프로세스에 의해서 동시에 많이 참조되는 페이지들은 탐색시간이 줄어들게 된다. 시뮬레이션 프로그램을 통해 본 논문에서 제안한 수정된 페이지 캐시 관리 기법을 이용하면, 기존의 방법에 비해서 페이지를 찾는데 필요한 탐색 회수와 탐색 시간의 측면에서 성능이 향상됨을 보인다.

  • PDF

A Study on EA Management Based On EA Artifact's Characteristics (아키텍처 산출물 특성에 기반한 EA 관리체계 수립방안)

  • Ma, Jae-Yong;Kim, Tae-Hyung;Kwon, Min-Seok;Yoo, Min-Hyuk
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2009.05a
    • /
    • pp.277-280
    • /
    • 2009
  • ITA법 제정 이후 많은 공공기관들이 ITA/EA 도입 및 구축을 추진하고 있으나, 명시적인 성과를 보여주는 경우는 많지 않은 것으로 조사되고 있다. 특히, 공공기관 EA 성숙도 수준 평가 결과 EA 도입에 비하여 관리 및 활용 영역의 수준이 낮게 나타나고 있다. 본고는 EA의 활용성을 저해하는 제 원인 중 EA 관리체계의 부실에 주목하였다. EA 도입과 함께 EA관리 체계가 수립됨에도 불구하고 EA 관리 및 활용 수준이 낮은 이유는 첫 번째로, EA관리 조직 설계 시에 EA 산출물의 작성 주체 및 협업 방안이 구체화되지 않은 상태로 관리 조직 및 역할이 수립되는 경향을 지적할 수 있다. 두번째로 EA 관리체계 설계 시에 각 EA 산출물의 특성이 고려되지 않은 획일적 관리 프로세스의 설계로 인하여 관리체계가 오작동하는 문제를 지적할 수 있다. 본 연구에서는 이러한 문제의식을 근간으로 개별 산출물에 대하여 요구되는 정확성과 정합성 수준에 따라 범정부 EA 산출물들을 구성도/정의서(Diagram/Description)형, 모델(Model)형, 정보자동생성(Auto Description)형, 설계서(Description)형, 서지정보(Metadata)형으로 유형화하고, 각각의 산출물 유형에 따른 조직의 역할과 협업 방안, 관리 프로세스를 제시하였다. 본 연구를 통해 향후 EA 관리체계 수립 및 조정 시에 산출물 유형별로 작성 주체 및 관리 조직간 요구되는 역할과 관리절차를 명확히 함으로써 효율적인 EA 산출물 관리가 이루어지도록 하고, 이를 통해 궁극적으로 EA 활용도 증진 및 EA의 근원적 목적 달성이 가능할 것으로 기대한다.

  • PDF

Development of Mobile-Based Process and System for Pipe Management of Construction Using NFC(Near Field Communication) and Augmented Reality Technology (NFC(Near Field Communication)와 증강현실 기술을 활용한 모바일 기반 플랜트 배관공사관리 프로세스 체계 구축)

  • Moon, Daeyoon;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.122-131
    • /
    • 2014
  • As plant market grows up, client demands to increase quality, technology and to reduce construction period. Due to the vast scale of the construction site and complexity of process, plant project can have some problems of communication among the project participants, the duplication of work, errors and rework. As a result those cause more costs, delay the construction schedule and reduce productivity and quality. Therefore, real-time communication between participants and real-time sharing of information such as material, equipment and construction are required in plant project site. This research aims to propose process and develop system using NFC(Near Field Communication) technology and augmented reality technology with mobile device for plant construction site. Administrators and operators are able to work efficiently using proposed process and system which create an environment designed to share and deliver information such as material, construction information.

The Study for Integrated Strategy and Successful Building of SCM (SCM의 통합전략과 성공적 구축에 관한 연구)

  • 김경우
    • Journal of the Korea Society of Computer and Information
    • /
    • v.8 no.4
    • /
    • pp.176-185
    • /
    • 2003
  • The SCM is on the effective treatment solution that has process schedule, material supplying, inventory management for perfect product these days. The SCM is innovative process activity to attain effective whole. It depends on the structure of approach because supplying network is consist of organization, budgeting, responsibility and authority. The major objective of the thesis was to propose the integration model and structure method technique of the SCM. Thus, to implement strategy model, firstly, it is determined repairs and non-effectiveness of supplying network. secondly, to set up future vision and goal, it is considered success factor of supplying net. thirdly, no gaps introduce between present and future of supplying net fourthly as above-mentioned consequence, Alternative is to set up integration and implementing model according to enterprise administration strategy .

  • PDF

The Improvements in Reasoning System of OntoFrame$^{(R)}$ (OntoFrame$^{(R)}$의 추론 시스템 개선)

  • Kim, Pyung;Lee, Seung-Woo;Sung, Won-Kyung
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2007.06c
    • /
    • pp.293-298
    • /
    • 2007
  • 연구자의 R&D 전주기 과정을 지원하기 위해 KISTI에서 2006년 개발된 OntoFrame$^{(R)}$은 과학기술 온톨로지와 DBMS 기반 추론 시스템을 적용하여 추론 서비스를 제공하였다. 2007년 개발중인 OntoFrame$^{(R)}$의 추론 시스템은 대량의 인스턴스를 대상으로 빠른 추론 성능을 제공하기 위해서 저장 구조 변경 및 추론 프로세스 변경을 통해 추론 시스템의 성능을 개선하는데 중점을 두고 있다. 본 연구에서는 추론 시스템의 개선을 위해서 RDF 트리플의 데이터 구조 및 테이블 구조 변경, EMPV(Expanded Multiple Properties View) 개발 및 도입, 추론 서비스와 추론 시스템의 프로세스 변경, 저장 구조 관리기의 개발 연구를 수행하였다. 데이터 구조 및 테이블 구조 변경을 통해서 저장 공간의 오버헤드를 개선하였고, EMPV의 도입을 통해서 트리플 저장 구조의 비효율적인 자료 접근 방식을 개선하였으며, 프로세스 개선을 통해 추론에 소용되는 시간을 단축하였다. 또한 관리기 도입을 통해서 사용자 편의성 및 추론 시스템의 관리 기능을 제공하였다.

  • PDF

Decision Making Process for Alternative Selection of Proper Design Change in Construction Project (적정 설계변경안 선정을 위한 의시결정 지원 프로세스)

  • Lee, Jong-Sik;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.74-82
    • /
    • 2010
  • A government agency has been announced to increase 23,663 hundred million wons by cost of design change which occurred in the pre-construction and construction phase. As design change is a phenomenon to occur by means of a characteristic of the building design that standardization is difficult, even if it is said that a perfect design is done in design phase, design change is prevented, and it is going to decrease, and there is a limit. Because there are some causes in all of the construction project, it is change order of client, relative system, unfit design and field condition, etc. In this study, we are suggested logic and basic model of the decision making support process model that it should selecting the optimal alternative through complex and quantitative analyzed: that is cost, performance and constructability as respect Owner or CMr is executing project under the CM delivery system construction project which it occurred design change.

Modular Building Construction Process Development by Benchmarking International Best Practices (선진 사례 벤치마킹을 통한 국내 모듈러 건축 시공 프로세스 제안)

  • Shin, HyunKyu;Ahn, YongHan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.6
    • /
    • pp.3-12
    • /
    • 2016
  • The purpose of this study is to provide a domestic applicable modular building construction process by benchmarking international best practices. In this study, we derive the risk factors that may occur in performing a modular construction projects and the modular construction management factors through case analysis. In order to effectively respond to risks in performing a modular building projects, we propose the modular building construction process which is separated by a transportation, lifting, assembly steps based on the unit module construction sequence. It is the key to providing management information and guidelines for the design, production, construction participants by reflecting the information for each step in the process. This study would prevent a potential hazard which may occur in the construction process. Consequently, It could result in saving the entire cost of modular construction project as shortening the project schedule and could improve workability of modular construction.