• Title/Summary/Keyword: 공정.공사비 통합관리시스템

Search Result 17, Processing Time 0.037 seconds

A Study on the Efficiency of Earned Value Management System for Practical Application (공정${\cdot}$공사비 통합관리시스템의 실무적용 효율화 방안)

  • Lee Woo-Sik;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.500-503
    • /
    • 2003
  • Considering that our construction market is recognizing the necessity of EVMS(Earned Value Management System) and that the EVMS will be applied to the construction projects with large scale. the suggested methodologies to link WBS(Work Breakdown Structure) with EVMS results and the developed web-based EVMS can be a tentative system for practical application.

  • PDF

An Integrated Cost and Schedule Control Process Model Using Earned Value Management System (EVMS를 활용한 공정-공사비 통합관리 프로세스모델)

  • Baek Seung-ho;Kim kyung-rai;Lee Yu-Seb;Lee yong-gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.89-97
    • /
    • 2000
  • This research has been Initiated to provide an effective management tool for budget control of the public projects using EVMS. Barriers to implementing the tool for the domestic public projects are identified : no PMB (Performance Measurement Baseline) for budget control, management by BOQ(bill of quantity), no systematic planning and control. To eliminate these barriers, an integrated cost and schedule management process model using EVMS is proposed. This model is composed of six sub processes : organizing, scheduling, budget allocating, establishing PMB, managerial analysis, change incorporation.

  • PDF

Development of Earned Value Management System by Using Visualization Index and WBS Map (시각화 지표 및 좌표식 정보분류체계에 의한 공정.공사비 통합관리시스템 개발)

  • Lee, Woo-Sik;Kang, Leen-Seok;Park, Seo-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.26-35
    • /
    • 2009
  • Work breakdown structure (WBS) can be used as an information center in earned value management system (EVMS) for the construction project. Because EVMS results, such as schedule variance and cost variance, are analyzed for the selected WBS code, the role of WBS code is important in EVMS. This study suggests a methodology for organizing WBS map with a quadrant. It can represent the project organization collectively by work level in a coordinate system. And the study developed an EVMS tool based on the WBS map and this tool can visualize various attribute indexes of EVMS by color symbols. Those methodologies can be used for improving practical application of EVMS.

Development of Activity and WBS for Integrated Cost and Schedule Control Process in Bridge Works (공정$\cdot$공사비 통합관리를 위한 Activity 및 WBS 구축 방안 -교량공사 예시)

  • Kim Jung-Ki;Lee Young-Dae;Kim Soo-Yong;Park Hyeo;Kim Sung-Hwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.406-409
    • /
    • 2001
  • This study refers to development of WBS(Work Breakdown Structure) and Activity sample for integrated cost and schedule control system of sample bridge work in the field. The conclusions from this study may be summarized as following 1. It showed that the level of detail to network's activities depend upon schedule's intended purpose. 2. It is more effective 'activity to cost package model' than 'activity to resource model', for integrated cost and schedule control reflect the characteristics of domestic construction industry.

  • PDF

The Establishment of an Activity-Based EVM - PMIS Integration Model (액티비티 기반의 EVM - PMIS 통합모델 구축)

  • Na, Kwang-Tae;Kang, Byeung-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.199-212
    • /
    • 2010
  • To establish an infrastructure for technology and information in the domestic construction industry, several construction regulations pertaining to construction information have been institutionalized. However, there are major problems with the domestic information classification system, earned value management (EVM) and project management information system (PMIS). In particular, the functions of the current PMIS have consisted of a builder-oriented system, and as EVM is not applied to PMIS, the functions of reporting, analysis and forecast for owners are lacking. Moreover, owners cannot confirm information on construction schedule and cost in real time due to the differences between the EVM and PMIS operation systems. The purpose of this study is to provide a framework that is capable of operating PMIS efficiently under an e-business environment, by providing a proposal on how to establish a work breakdown structure (WBS) and an EVM - PMIS integration model, so that PMIS may provide the function of EVM, and stakeholders may have all information in common. At the core of EVM - PMIS integration is the idea that EVM and PMIS have the same operation system, in order to be an activity-based system. The principle of the integration is data integration, in which the information field of an activity is connected with the field of a relational database table consisting of sub-modules for the schedule and cost management function of PMIS using a relational database management system. Therefore, the planned value (PV), cost value (CV), actual cost (AC), schedule variance (SV), schedule performance index (SPI), cost variance (CV) and cost performance index (CPI) of an activity are connected with the field of the relational database table for the schedule and cost sub-modules of PMIS.

A Study on developing WBS based QDBS(Quantity Database System) for the schedule and the cost data integration for road construction project (도로공사의 공정 및 공사비 연계활용을 위한 디지털 수량산출정보시스템(QDBS) 개발 연구)

  • Yun, Seok-Heon;Kim, Seong-Sig
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.119-127
    • /
    • 2007
  • Cost and Schedule is the most important information, and how efficiently manage this information is the key issue for Construction Project Management. Domestically, systematic scheduling method such as CPM network is not only used widely but integration of time and cost information also is. In order to effectively integrate and use the time and cost information, it is suggested that WBS(Work Breakdown Structure) based QDB(Quantity Database) should be generated from the design phase and, WBS and QDB related system tool should be supported. It could be helpful to relate and integrate other construction project information.

A Case on the Applying QDB based Schedule·Cost Data Management for Road Construction (디지털 수량산출정보 기반 도로분야 공정·공사비 정보 관리 시범적용 사례)

  • Moon, Jin Seok;Yoon, Hoi Soo;Han, Choong Han;Kim, Seong Jin
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2012.04a
    • /
    • pp.1428-1429
    • /
    • 2012
  • 건설분야 수량산출정보의 연계 및 교환을 위한 디지털 수량산출정보 교환표준과 지방국토관리청의 도로관리관점에 따라 구성된 작업분류체계를 바탕으로 도로분야 수량산출정보를 지원도구를 통해 생성한다. 건설사는 지원도구에서 작성한 도로공사 수량산출정보를 건설사업관리시스템에 등록함으로써 공정 공사비 관리에 활용하고 있다. 본 연구는 공정 공사비의 통합관리를 통해 실질적인 사업관리가 가능하도록 10개 도로건설공사 시범사업을 선정하여 문제점과 개선방안을 도출하였다.

Module Suggestion to Develop an Integration System of Schedule and Change Control (공정 및 변경관리 통합시스템 개발을 위한 모듈 제안에 관한 연구)

  • So Young-Sung;Oh Seung-Jun;Kim Young-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.393-396
    • /
    • 2002
  • Purpose of this study is to suggest some modules to integrate schedule and change control. The study has been performed through the process of literature review, effect comparison of being not integrated and integrated of the schedule and change control, and finally suggest new integrated modules. The results of this study are as follows: 1) Suggestion of a Predicted Change Information Control Module: This nodule can be used to assess the impact of changes in advance and to prepare counteraction. 2) Suggestion of a Change Information Control Module: This module is used to update current schedule for the realized changes. 3) Suggestion of a Revision History Maintenance Module: This module is used to record schedule and cost revision history and to analyze the overall change trend.

  • PDF

A Study on the Connection Model for Attribute Code of Earned Value Management System (정보화된 EVMS 구축을 위한 속성코드 연계모형 구성 연구)

  • Lee, Woo-Sik;Kang, Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.362-365
    • /
    • 2004
  • This study suggests an attribute code system for earned value management system (EVMS). The attribute code system can be used for integrating various EYM data from construction schedule and cost. If the suggested attribute code is used in EVM, sorting and typical classifying of EVM data is possible in the computerized system. Those functions are an effective management tool for construction manager comparing with other EVM tools.

  • PDF

A Study on Project Information Integrated Management Measures Using Life Cycle Information in Road Construction Projects (도로건설사업의 생애주기별 정보를 이용한 건설사업정보 통합관리방안 연구)

  • Kim, Seong-Jin;Kim, Bum-Soo;Kim, Tae-Hak;Kim, Nam-Gon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.11
    • /
    • pp.208-216
    • /
    • 2019
  • Construction projects generate a massive amount of diverse information. It takes at least five years to more than 10 years to complete, so it is important to manage the information on a project's history, including processes and costs. Furthermore, it is necessary to determine if construction projects have been carried out according to the planned goals, and to convert a construction information management system (CALS) into a virtuous cycle. It is easy to ensure integrated information management in private construction projects because constructors can take care of the whole process (from planning to completion), whereas it is difficult for public construction projects because various agencies are involved in the projects. A CALS manages the project information of public road construction, but that information is managed according to CALS subsystems, resulting in disconnected information among the subsystems, and making it impossible to monitor integrated information. Thus, this study proposes integrated information management measures to ensure comprehensive management of the information generated during the construction life cycle. To that end, a CALS is improved by standardizing and integrating the system database, integrating the individually managed user information, and connecting the system with the Dbrain tool, which collectively builds artificial intelligence, to ensure information management based on the project budget.