• Title/Summary/Keyword: 공유수면 매립

Search Result 33, Processing Time 0.031 seconds

Estimation for Reclamation of Public Waters Demand Using Time-series Analysis (시계열 분석을 통한 공유수면 매립 수요 예측)

  • Shin, Chul-Oh;Choi, Eun Chul;Yoon, Sung-Soon
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.27 no.7
    • /
    • pp.918-923
    • /
    • 2021
  • The Korean government is developing a 10-year master plan pertaining to the Public Waters Management and Reclamation Act. However, it was observed that implementation of the reclamation project through frequent changes would occupy a significant proportion. Thus, questions are being raised about the effectiveness of the master plan. In view of this, the need for a trend analysis on long-term reclamation demand is growing. Accordingly, in this study, a trend analysis of reclamation demand was carried out using the annual reclamation performance data. The results of the analysis indicate that the demand for reclamation of public waters continued to decline, and the trend has been particularly evident since the 1990s, when it was converted into a reclamation master plan. In addition, the total demand for reclamation during 2021-2030 was calculated to be at a maximum of 13.8 km2 and minimum of 1.7 km2.

Analysis of the Long-term Settlement Behavior Due to the Additional Embankment on the Waste Lime Landfill in Public Waters Reclaimed Land (공유수면 매립지내 폐석회 매립시설의 추가성토에 따른 장기침하 거동 분석)

  • Kang, Jeong Ku;Yi, Yeun Jeung
    • Journal of the Korean Geosynthetics Society
    • /
    • v.21 no.2
    • /
    • pp.1-9
    • /
    • 2022
  • Recently, the reclamation of public waters has been on a downward trend due to environmental problems, but there is a limitation to evaluating environmental characteristics index uniformly. In this study, the stability of settlement behavior on public waters reclaimed land was analyzed using the experimental test. From the primary consolidation influence factors, the characteristics of the waste lime was similar that of clay in process of consolidation. Assuming that the waste lime landfill is the layer reinforced with thin geosynthetic reinforcement, the settlement was predicted by calculating the amount of increase using the Westergaard method. As a result of predicting settlement with degree of consolidation, it was found that the increase in stress was reduced by 40% when the surface layer of the soft ground was reinforce with geotextiles compared to the case where it was not reinforced. In addition, the consolidation behavior characteristics of clay and waste lime were compared using the correlation between the plasticity index and internal friction angle of waste lime. Since the waste lime in the public process of consolidation, it was predicted that long-term settlement will increase further.

항로표지 설치를 위한 공유수면 점.사용협의에 관한 연구

  • Park, Gwon-Il;Choe, Su-Bong;Kim, Gang-On
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2012.10a
    • /
    • pp.313-316
    • /
    • 2012
  • 각 지방청에서 통항선박의 안전을 위하여 추진하고 있는 항로표지시설(등표, 등부표) 설치 시 해당 공유수면에 대한 점 사용 협의 여부에 대한 명확한 해석이 필요하고, 또한 공유수면에 항로표지시설을 설치할 경우 공유수면 점 사용협의의 필요성과 관련된 항로표지법 및 공유수면 관리 및 매립에 관한 법령을 검토한 결과를 알리고자함.

  • PDF

고파랑에 수리학적으로 유리한 복합구조 방파호안

  • Go, Gwang-O;Bae, Jeong-Ho;Park, Gu-Yong
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2007.12a
    • /
    • pp.170-172
    • /
    • 2007
  • 미포만 공유수면 매립공사는 방파호안 854.5m를 축조하고 부지 $100,514.3m^{2}$를 매립하여 현대중공업(주)의 조선용 블록 제작장 및 적치장을 조성하는 사업이다. 2004년 2월 해양 수산부 설계자문을 실시하고, 2004년 5월 실시계획 인가를 득하여 사업을 추진하여 오던 중, 최근의 이상파랑 및 태풍 내습 (2005년 8월, 태풍 나비)등으로 인하여 피해가 발행하는 동 사업시행자인 현대중공업(주)에서 사업계획의 일부 변경(공구분할)올 요청하여 1공구(미포만 북방파제 보강)공사만을 2005년 8월말로 완료하였다. 미포만 공유수면(II-Block) 매립공사(2공사)는 파량 내습시 피해발생 사전예방 및 상향된 심해설계파 등에 안전한 구조물 축조로 배후매립부지의 안전성을 확보할 수 있도록 호안의 마루높이를 상향하고 케이슨 및 피복재 중량을 증대하여 설계 및 시공할 수 있도록 하였다.

  • PDF

Settlement Analysis for the Dredged Material Landfill Calculation (준설토 매립량 산정을 위한 침하 분석)

  • Lee, Eun-Han;Park, Jeong-Jun;Kang, Jeong-Gu
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2015.11a
    • /
    • pp.162-165
    • /
    • 2015
  • 본 연구는 ${\bigcirc}{\bigcirc}$ 공구 공유수면 매립공사 수행 중에 매립토량의 부족이 발생함에 따라 이를 대상으로 원인을 분석하고자 수행하였다. 매립지의 토량부족 원인을 파악하기 위해 설계 및 계측자료를 수집하여 시공 현황을 파악하고 지반조사를 통해 해안지역과 매립지반의 시료를 채취하여 성상분석과 원지반에 대한 공학적 특성을 비교 검토하였다. 특히. 현장 시추조사에 의한 경계면 분석과 토질 종류를 점성토, 사질토, 부유토로 구분하고 침하량 공식에 따라 발생량을 산출하였다. 구역의 구분은 설계 시와 동일한 조건에서 침하량을 계산하였고 설계 시 지반고가 침식과 퇴적으로 인해 일부 변경되어 설계시 지반고와 착공시 지반고를 구분하여 기재하고 각각의 침하량을 비교하였다.

  • PDF

Numerical Model을 이용한 항만 설계 기법

  • 이환범
    • Proceedings of the Korean Society of Coastal and Ocean Engineers Conference
    • /
    • 1992.08a
    • /
    • pp.54-57
    • /
    • 1992
  • 최근 국토이용의 다양화로서 해면을 이용하는 여러가지 해상설비나 해안 방재 대책공법의 일환으로서 구조물 등이 해안선 근방에 많이 건설되고 있고 임해공업의 발달로 공유수면의 매립이 활발히 진행되고 있다.(중략)

  • PDF

Estimation of Historical Shorelines on a Coastal Reclaimed Land (I): The Use of Aerial Photographs (해안 매립지에서 과거 해안선의 산정 (I): 항공사진의 이용)

  • Kim, Baeck-Oon;Lee, Chang-Kyung
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.21 no.5
    • /
    • pp.371-379
    • /
    • 2009
  • In this paper, we discussed methods and problems for estimating historical shorelines on a reclaimed land. Since many of coastal lands are unregistered in Korea, reclamation of public waters could cause complicated land ownership dispute. Unlike cadastral boundaries, historical shorelines can be represented by those of various locations due to lack of legal definition of shoreline as well as characteristics of shoreline changes, which directly influence on the calculation of coastal and submerged land areas. Through a case study for Anjeong industrial complex, a systematic method of investigating historical shorelines was suggested to resolve the problems. For a rocky coast where shoreline changes are not likely to occur, a shoreline based on tidal datum was retrieved using aerial photographs taken before the construction of reclamation. Compared with ground survey data, the shoreline was accurate, indicating that the digital photogrammetry was reliable.

Evaluation on Field Application of Controlled Low-Strength Materials Made of Coal Ash in Reclamation Site (석탄회를 활용한 저강도고유동화재의 공유수면매립현장에 대한 적용성 평가)

  • Kong, Jin-Young;Jung, Hyuk-Sang;Cho, Sam-Deok;Kim, Ju-Hyong;Hyun, Jae-Hyuk;Chun, Byung-Sik
    • Journal of the Korean Geotechnical Society
    • /
    • v.28 no.12
    • /
    • pp.27-39
    • /
    • 2012
  • This paper presented the strength and environmental characteristics of reclaimed-ground filled with controlled low-strength materials (CLSM) made of coal ash, small amounts of cement, and water in a reclamation site and evaluated the possibility of the use of coal ash on reclamation materials for beneficial use. Three-month period of SPT, CPT, environmental effects evaluation etc. were conducted. N values and cone resistances in ground filled with CLSM were greater than or similar to those in dredging sand. In case of land filled with coal ash except cement these values were lower than those in dredging sand. The results of soil and seawater pollution were lower than test criteria without high pH. Also the values of PH test were measured between pH 5.0~9.0, the criteria of industrial water in the Law for the Underground Water of Korea.

Improvement of The Scope of Business Subject to Consultation on Utilization of Sea Areas for Developments According to the Fishing Village and Fishery Harbors Act (어촌·어항법에 따른 개발사업의 해역이용협의 대상사업의 범위 설정 개선방안)

  • Tac, Dae-Ho;Lee, Dae-In;Kim, Gui-Young
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.19 no.3
    • /
    • pp.211-217
    • /
    • 2016
  • In case of the Sea Areas Utilization Consultation about fishery harbor facilities there has been problems excepting a mooring facility and having the same scope of business subject with harbor, while those scale are different. In this study, we analyzed the 17 cases of the statements for Sea Areas Utilization Consultation according to the development projects of fishery harbors for 2013-2014 and suggested the improvement way to go. First, it is needed to reassess the scope of business subject about fishery harbor because the environmental effects about the development projects for the fishery harbor are not considered separately by facilities, development project for the fishery harbor. Therefore, the reassessment about them are needed surely. Second, the adjustment of the range about fishery harbor facilities on the Sea Area Utilization Consultation is needed because in case of most small fishery ports, the sizes of those facilities are less than the boundary area ($50,000m^2$). Last, consultation subjects shall be more clear in order to protect confusions-related with applying for the Consultation on Utilization of Sea Areas. A new rule for clarifying consultation on business subjects is needed in order to reduce the unclarity and the confusions from being occurred by difference between 'occupancy or use permit of public waters' and 'exclusion of application' and business subjects according to the Public Waters Management and Reclamation Act and the Marine Environment Management Act, respectively.