Preventive Occupational Health and Safety Expense Estimation Method based on Fatality Statistics and Progress Model (중대재해발생률 및 진도관리모델을 고려한 공사진척도별 적정 안전보건관리비 산정기법)

  • Yi, Kyoo-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.2
    • /
    • pp.191-197
    • /
    • 2017
  • The safety nature of construction industry differs from that of manufacturing sector. For instance, accident risk level dramatically varies at each phase of construction process. Korean Occupational and Health Safety Act has been regulated OHS expense and it contributed reducing accident risk and enhancing safety culture for many years. However, although current regulation guides to use OHS expense proportionate to construction progress, it still allows late use of the expense. This study was conducted for the purpose of presenting methods of estimating a step-by-step OHS expense rate required at each construction phase. In order to do provide proper OHS expense schedule, it analysed accident risk of each construction phase by sorting out 1439 cases of construction site fatality reports, and proposed a method of generating appropriate OHS expense scheme according to its construction work progress characteristics. Both linear and sigmoidal S-curve model were used for the analysis, and the latter generally requires earlier use of OHS expense. By comparing the estimated OHS expense use schedule with current criteria, more than 27%p early use of OHS expense is required for the prevention of accident.

A Study on the Methology of u-City Construction Audit (u-City감리기준 개선에 관한 연구)

  • Choe, Sang-Hyun
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2009.11a
    • /
    • pp.202-206
    • /
    • 2009
  • u-City사업은 완성까지 5년 이상이 소요되는 대형 장기사업으로, 정보시스템 개발 및 정보통신공사가 동시에 이루어지는 복합공종 사업이다. 이러한 대규모 사업을 차질없이 수행하기 위해 u-City사업에는 감리도 동시에 수행된다. 그러나 u-City감리는 아직 단일화된 감리기준이 없어 정보시스템 감리기준 및 정보통신공사감리 업무수행지침이 각각 적용되고 있으며, 이로 인해 감리 현장에서는 통일된 일정계획 수립이 어렵고, 업무 분장이 불명확하여 감리대상 일부가 누락되는 경우도 발생한다. 본 논문에서는 정보시스템 감리기준 및 정보통신공사감리 업무수행지침으로 이원화된 감리기준으로 인해 발생되는 문제점들을 살펴보고 이의 개선방향을 제시하였다.

  • PDF

SPM 설치에 따른 해상교통 안전대책에 관한 연구

  • Yun, Gwi-Ho
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2013.06a
    • /
    • pp.539-541
    • /
    • 2013
  • 울산 신항 남항지구에 설치되는 SPM은 설치 위치와 공사의 특성상 제4항로 전면을 일정 기간 잠식함과 더불어 상당히 광범위한 공사구간이 요구됨으로써 제4항로 통항 선박 및 공사구간을 통항하는 선박들의 통항 안전 및 작업선들의 작업 안전에 대한 대책 마련이 필요한 바 이 연구에서는 제4항로의 임시항로 설정과 임시항로의 통항안전성 평가가 더불어 통항 선박 및 작업선의 해상교통 안전대책을 수립하였다.

  • PDF

해외건설공사 수행절차(3)

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.8 s.217
    • /
    • pp.64-67
    • /
    • 2008
  • 해외공사는 주로 해외지점망, 외국설계회사, 발주자 또는 기존 현장을 통해 입수한 공사정보(공사비 및 공사개요, 재원, 발주자, 설계회사, 입찰일정 등)를 토대로 입찰참여 여부를 결정하며, 입찰 자격심사(PQ : Pre-qualification)를 거쳐, 입찰서를 발급받아 견적서를 작성하고 입찰에 임하게 된다. 입찰, 수주활동을 하는 동안 주요사항을 국토해양부 및 해외건설협회에 단계별로 소정의 양식에 의거 보고한다. 주요보고사항 $\Delta$ 수주활동상황보고(입찰예정일 10일 전까지) $\Delta$ 계약체결결과보고(계약체결 15일 이내) $\Delta$ 시공상황보고(매분기 종료후 30일 이내) $\Delta$ 공사내용변경보고(변경 15일 이내) $\Delta$ 준공보고(준공증명서 발급 15일 이내)

  • PDF

A Study on the Improvement of Construction Progress Measurement Based on Earned Value Concept (EV기반 RC 공사 진도율산정 개선방안)

  • Choi Tae-Young;Jung Hye-Won;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.307-310
    • /
    • 2003
  • Construction projects include risks due to uncertain factors, so it's important to repeatedly evaluate the performance of on-going work in all aspects of the projects. But construction projects are usually managed focusing on the results of projects. Moreover, cost and schedule are managed separately even though the efficiency of integrated management is very high. Recently many researches about cost and schedule integration methods are in progress according to the increasing of interest and EVMS (Earned Value Management System). Though researchers comment and propose many methods, it's hard to find example to apply it to the real project. So, the purpose of this study is to improve a method of construction Progress measurement Based on Earned value Concept by integration of cost and schedule management. It investigates the previous studies, interviews and performs a case study.

  • PDF

Predicting Construction Project Cost using Sensitivity Analysis in Stochastic Project Scheduling Simulation (SPSS) (확률 통계적 일정 시뮬레이선 - 민감도 분석을 이용한 최종 공사비 예측)

  • Lee Dong-Eun;Park Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.80-90
    • /
    • 2005
  • Activity durations retain probabilistic and stochastic natures due to diverse factors causing the delay or acceleration of activity completion. These natures make the final project duration to be a random variable. These factors are the major source of financial risk. Extending the Stochastic Project Scheduling Simulation system (SPSS) developed in previous research; this research presents a method to estimate how the final project duration behaves when activity durations change randomly. The final project cost is estimated by considering the fluctuation of indirect cost, which occurs due to the delay or acceleration of activity completion, along with direct cost assigned to an activity. The final project cost is estimated by considering how indirect cost behaves when activity duration change. The method quantifies the amount of contingency to cover the expected delay of project delivery. It is based on the quantitative analysis to obtain the descriptive statistics from the simulation outputs (final project durations). Existing deterministic scheduling method apply an arbitrary figures to the amount of delay contingency with uncertainty. However, the stochastic method developed in this research allows computing the amount of delay contingency with certainty and certain degree of confidence. An example project is used to illustrate the quantitative analysis method using simulation. When the statistical location and shape of probability distribution functions defining activity durations change, how the final project duration and cost behave are ascertained using automated sensitivity analysis method

A Study on the Improvement of the Compensation Calculation Standard for Dust Damage in Construction Sites (공사장 먼지피해 배상액 산정기준 개선방안 연구)

  • Kim, Jin-Ho
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2022.10a
    • /
    • pp.239-240
    • /
    • 2022
  • 공사장에서 발생하고 있는 먼지는 현장 근로자뿐만 아니라 인근 주민들의 건강에 치명적인 영향을 미치고 있다. 공사장 인근 주민들이 환경분쟁조정위원회에 먼지피해에 대한 피해배상을 청구하고 있지만 공사장 먼지피해 수인한도 초과여부를 확인하기 위한 측정, 예측, 평가가 어려워 먼지피해에 대한 보상이 제대로 이루어지지 않고 있다. 공사장 먼지관리의 법적기준이며 먼지 저감에 대한 구체적인 방법을 제시하고 있는"비산먼지 억제조치기준"의 준수 등을 점수로 평가하여 일정 점수 이하인 경우 피해배상액을 차등 적용하는 방안을 제안한다. 본 안이 제도화된다면 건설사는 먼지피해 배상액 지출을 줄이기 위해 현재보다 한층 더 먼지 저감 노력을 강화할 것이기에 먼지 발생을 획기적으로 줄일 수 있어서 현장 근로자 및 인근 주민들의 먼지피해를 최소화할 수 있으며, 먼지로 인한 환경, 보건 법규위반예방과 쾌적한 작업환경으로 노동 생산성 확보와 먼지로 인한 피해 배상액 지급 등 손실을 줄일 수 있을 것이라고 생각한다.

  • PDF

BIM based Integration Method of Cost and Schedule Information (BIM기반 비용.일정 통합관리 방안에 관한 연구)

  • Jung, Do-Young;Baek, Yuong-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.321-325
    • /
    • 2008
  • 3D and BIM technology are presumed to be used more and more in the construction industry. The scope of this paper arose from a general wondering of how the constructor in general can benefit from the use of 3D models. Presented herewith is the first application of BIM in Korea to a actual bridge construction site located in Cheongpoong in Chooncheongbook-Do. This paper tries to integrate design, cost and schedule under location-based conditions with industry-specific solution for 3D modeling. 292 activities constitute the cable-stayed bridge of 442m long with a main span of 327m long. Integration of 3D model, cost and schedule is shown by comparing the measurements of works at a specific time by use of 2 different construction sequencing scenarios and cost breakdown structures.

  • PDF