대규모 지하공사의 비용.일정 리스크 관리

  • 서종원 (한양대학교 건설환경공학과) ;
  • 김정환 (한양대학교 건설환경공학과)
  • Published : 2009.07.30

Abstract

Keywords

References

  1. Choi, H., H. Cho, et al. (2004). 'Risk assessment methodology for underground construction projects.' ASCE Journal of Construction Engineering and Management 130: 258~272 https://doi.org/10.1061/(ASCE)0733-9364(2004)130:2(258)
  2. Einstein, H. H. (2004). 'Decision aids for tunneling - Update.'Design of Structures 2004, 199-207 https://doi.org/10.3141/1892-21
  3. Min, S. Y., T. K. Kim, et al. (2008). 'Design and construction of a road tunnel in Korea including application of the Decision Aids for Tunneling - A case study.'Tunnelling and Underground Space Technology 23(2): 91~102 https://doi.org/10.1016/j.tust.2007.01.003
  4. Seo, J. and H. Choi (2008). 'Risk-Based Safety Impact Assessment Methodology for Underground Construction Projects in Korea.'ASCE Journal of Construction Engineering and Management 134:72~81 https://doi.org/10.1061/(ASCE)0733-9364(2008)134:1(72)
  5. Washington D.O.T. (2008). Risk Management Plan (RMP) User's Guide, (www.wsdot.wa.gov/publications)