A Study on the Prediction Model of Total Construction Period according to the Type of Machine Learning Regression (머신러닝 회귀분석 유형에 따른 총 공사기간 예측 모델에 관한 연구)

  • Kang, Yun-Ho;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.361-362
    • /
    • 2023
  • In construction work, there is often a difference between the estimated construction period and the actual construction period. Accordingly, the project may be delayed from the scheduled date, leading to huge losses due to problems such as increased costs during construction. In this way, it is important to calculate the appropriate construction period at the project planning stage in construction work. To solve this problem, we would like to study a model that will increase the accuracy of the scheduled construction period at the project planning stage. This study compared and analyzed linear regression, Lasso regression, Ridge regression among the types of regression analysis to select an appropriate construction period prediction model to secure an appropriate construction period at the project planning stage to reduce problems during construction.

  • PDF

A Study on the Optimal Concession Contract Decision Model between Port Authority and Terminal Operators (항만공사와 터미널운영사간 최적임대계약 결정에 관한 모형)

  • Ashurov, Abdulaziz;Kim, Jae-Bong
    • Journal of Korea Port Economic Association
    • /
    • v.35 no.3
    • /
    • pp.1-18
    • /
    • 2019
  • The competition between port authorities (PAs) and terminal operating companies (TOCs) in providing port logistics services has gained importance. The PAs enter into leasing contracts with TOCs in various ways. This study aims to model a contract method that maximizes the joint profit between a PA and a TOC. Particularly, this study aims to model the equilibrium by comparing four types of contract schemes in the non-coordination, cooperation, Cournot, and collusion models. The results of the analysis show that the two-part tariff scheme generates a higher joint profit than the fixed and fee contracts. It is understood that risk- and profit-sharing between the PAs and TOCs helps the latter to maximize the throughput and the joint profit. These results are expected to provide an important theoretical basis for decision-making about port rent and freight between the PAs and TOCs.

확률회귀모형을 이용한 고속도로의 사고요인 분석

  • Lee, Gi-Yeong;Lee, Yong-Taek
    • 도로교통
    • /
    • s.94
    • /
    • pp.51-64
    • /
    • 2003
  • 본 연구는 사고요인과 사고모형의 문헌고찰을 통해 고속도로를 주행하는 버스와 화물차의 사고모형을 개발하고 그 적용방안에 대해 고찰하고자 수행되었다. 고속도로 사고 중 대형차로 인한 차량당 사고율은 승용차보다 월등히 높아 사고의 심각성을 나타내고 있으며, 따라서 이에 대한 별도의 검토가 필요한 시점에 와 있다. 특히 본 연구에 활용된 자료는 비집계된 사상자수로 구간자료를 집합화함으로써 발생하는 문제점을 해소할 수 있다. 모형의 분석기법으로 국내의 경우, 대부분 단순회귀식으로 사고모형을 개발, 적용하여 왔으나 사고수와 사상자수의 특성상 이산적 확률변수로 해석하여 포아송분포와 음이항분포로 적용하는 것이 바람직하다. 따라서 본 연구에서는 버스와 화물차의 사고유형별로 적합한 사고 모형을 개발하여 이로 인한 인사사고 요인에 대한 영향을 분석하고 그 적용방안을 제시하였다. 이러한 연구는 도로설계, 운영, 교통법규, 교통행정 등의 분야에서 거시적인 정책적 방향성을 제시하리라 판단된다. 특히 본 연구는 고속도로 운영주체인 한국도로공사의 고속도로사고조서를 바탕으로 사고유형별 사고모형을 개발, 적용한 것으로 고속도로의 안정성 향상을 위한 제반 정책 수립에 기초자료로 활용될 것으로 기대된다.

  • PDF

Case Study on Landscape Defect Type of Defect Lawsuit in Apartment Building (공동주택 하자소송에서의 조경하자유형 사례분석)

  • Park, Jun-Mo;Seo, Deok-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.263-264
    • /
    • 2016
  • Since 2000s in Korea, apartment building tended to become goods or assets rather than houses. Therefore, conflicts between supplier and consumer were aggravated, and the defect dispute has been increased rapidly. This dispute enlarges to defect lawsuit and it is social and economical matter. The landscape work in apartment building is main work for a resident that appearance and convenient facility which lawn, tree, fountain, chair, playground, and etc. A number of defects surround landscape work are important issue in defect lawsuit, but, a related research is a minority, and a regulation is incomplete. Therefore, this study is basic study for standard of landscape defect type. As case study on defect lawsuit, draw a landscape defect type in apartment building.

  • PDF

Prediction of Deep Excavation-induced Ground Surface Movements Using Artificial Neural Network (인공신경망기법을 이용한 깊은 굴착에 따른 지표변위 예측)

  • 유충식;최병석
    • Journal of the Korean Geotechnical Society
    • /
    • v.20 no.3
    • /
    • pp.53-65
    • /
    • 2004
  • This paper presents the prediction of deep excavation-induced ground surface movements using artificial neural network(ANN) technique, which is of prime importance in the damage assessment of adjacent buildings. A finite element model, which can realistically replicate deep excavation-induced ground movements, was employed to perform a parametric study on deep excavations with emphasis on ground movements. The result of the finite element analysis formed a basis for the Artificial Neural Network(ANN) system development. It was shown that the developed ANN system can be effective for a first-order prediction of ground movements associated with deep-excavation.

Impact Analysis of Road Improvement Project on Rural Development : A Case of Korea (도로개선사업의 지역개발 효과분석)

  • 전경수;조중래
    • Journal of Korean Society of Transportation
    • /
    • v.10 no.3
    • /
    • pp.123-140
    • /
    • 1992
  • 지방도로의 포장 및 확장사업으로 인한 지역개발효과를 분석하였다. 효과발생시 시기적 특성을 기준으로 할 때, 도로개선사업의 지역개발효과는 직접효과, 유발효과 및 간접효과 등 세가지의 유형으로 구분될 수 있다. 이들 각 유형의 효과가 각각 어떻게 발생되는가를 파악하기 위하여 본연구에서는 교통부문, 농업부문, 공업부문, 공공 서비스 부문, 주거부문 및 인문사회부문 등 6개부문에 대한 도로개선 사업의 효과를 분석하였다. 분석은 ADB 5차사업으로서 1983년에 공사를 시작하여 1985년에 사업이 완료된 밀양 및 하동지구를 그 대상으로 하였다. 도로개선사업의 효과가 사업종료 후 어느 시점에서부터 발생되는가를 관찰하기 위하여 효과분석을 위한 자료수집의 시점을 사업전 (1983년), 사업완료 직후(1986년) 그리고 사업완료 5년후(1992) 등 크게 세가지로 구분하였다. 1983년 및 1986년의 자료로는 건설부에서 조사한 자료들을 이용하였으며, 1992년의 자료는 현장조사와 해당군의 통계에서 수집된 자료를 이용하였다. 도로사업으로 인한 순효과를 측정하기 위하여 본 연구에서는 각 대상지역을 사업지구(Project Area)와 대조지구(Control Area) 로 구분하고 이들 각 지구에 대한 시점별 분석들 실시하였다.

  • PDF

Derivation of Key Safety Management Factors by Construction Process through Cross-Tabulation Analysis between Accident Types and Objects (건설공사 공종별 사고유형 및 사고객체 교차분석을 통한 중점안전관리항목 도출)

  • Yoo, Nayeong;Kim, Harim;Lee, Chanwoo;Cho, Hunhee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.127-128
    • /
    • 2022
  • The construction industry has a higher disaster rate than other industries, so safety education and management are highly important. In order to reduce the construction accident rate, it is necessary to study the key safety management factors reflecting the characteristics of the construction industry, where there are differences in processes and manpower input for each process, and a small number of managers. Therefore, in this study, key safety management factors for each Process of construction were derived through cross-analysis between safety accident types and accident occurrence objects through disaster case data. The extracted key safety management factors are expected to provide useful information for safety education and supervision of construction sites.

  • PDF

Formal Estimation Method for Optimal Budget Appropriation of Highway Construction Projects under Long-term Continuation Contracts (장기계속계약제도 하에서 고속도로공사 최적공사비 산출방안 정립에 관한 연구)

  • Koo, Bon-Sang;Yu, Jung-Ho;Park, Jong-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1405-1412
    • /
    • 2015
  • In Korea, public infrastructure projects employ "long term continuation (LTC) contracts," which require budgets to be reevaluated and re-appropriated annually throughout the multi-year life of the project. However, such contracts also make it susceptible to frequently changing government policies, in which budgets required for existing projects are allocated to new projects and thus does not provide a consistent stream of capital to multi-year projects. Each year, the KEC needs to attain government funds for construction of its multiple highway construction sites. Because it is difficult to know the amount that may be actually appropriated to KEC in a given year, it is in turn difficult to anticipate and provide sufficient funds necessary for construction to run smoothly and continuously. The lack of a good logic for appropriation has resulted in projects having a skewed distribution of capital. To get better budget appropriations from the central government, the KEC first needs a systemized approach that rationalizes the annual construction capital optimally required for its individual sites. The goal of this research was to devise a way that allows the KEC to determine and calculate the optimal construction costs that would be required for its individual construction sites on an annual basis. Both the optimal progress rate and the essential work types were assessed through a workshop with 24 professionals (KEC employees and contractors) who had extensive experience in KEC projects and also were currently working in these projects.

A Study on Cause-and-Effect Hierarchy of Profit Factors for the Feasibility Evaluation of Overseas Construction Projects (해외건설공사의 타당성 평가를 위한 수익성 영향인자의 인과관계 계층구조 구축에 관한 연구)

  • Sun Seung-Min;Kim Han-Him;Han Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.373-378
    • /
    • 2003
  • Korea's overseas construction industry has been rather depressed by the weakened profitability as well as the sharp decrease of the market shares due to the lack of international competitiveness and the declined international market following the outbreak of Iraq war. There exist a lot of various risks in performing the overseas construction, and especially EPC projects, which entail complicated process from different parts, also require a sophisticated procurement and management skill. Subsequently, to survive in the competitive international market, we need to establish strategies to select potentially profitable projects at the initial stage of bidding process and to mitigate the high degree of risk exposures through contract negotiation and its adjustment. This research provides the profitability evaluation bases, with which overseas construction participants can forecast and analyze the risk more systematically, by eliciting profit-influencing factors from real overseas construction projects and structuring their cause-and-effect relationships. The profitability causal hierarchy structure describes the profitability factors' hierarchy in details and their interrelationships. It also enables us to find out critical factors directly related to profitability aggravation through a qualitative analysis. Ultimately, with this hierarchy structure as the base, the research will suggest how to develop the quantitative profitability forecasting model.

  • PDF

A Study on the need to strengthen safety and health activities of private construction contractors (건설공사 민간 발주자의 안전보건활동 강화 필요성에 관한 고찰)

  • Keun-Kyu Lee;Min-Je Choi;Guy-Sun Cho
    • Industry Promotion Research
    • /
    • v.9 no.2
    • /
    • pp.69-75
    • /
    • 2024
  • Korea has entered the ranks of advanced countries in terms of economic size and technological competitiveness. However, its industrial accident fatality rate remains among the lowest in OECD countries, and recent incidents such as various building collapses have resulted in numerous deaths of workers or citizens, reminiscent of accidents in developing countries. According to the 2022 Industrial Accident Status Analysis by the Ministry of Employment and Labor, out of the 874 fatalities in work-related accidents in 2022 across all industries, 402 were in the construction industry, accounting for approximately 46% of all fatalities. In particular, the construction industry's fatality rate stands at 1.61, significantly higher than the overall industry fatality rate of 0.43, indicating its severity. Construction ranks highest in terms of fatality rates, with mining at 12.18 and fishing at 1.80. When categorizing construction projects into private and public, private projects show significantly higher figures in terms of contracts, contract amounts, accident numbers, and fatalities compared to public projects. However, unlike public agencies, many private clients lack adequate safety and health activities and lack established safety and health systems. This study aims to raise awareness among private clients about the need to establish safety and health systems and enhance safety and health activities, and to discuss the direction of future development of advanced safety and health practices among private clients.