A methodology for an effective utilization of construction equipment for highway construction projects (도로공사 공정계획을 위한 공정 로직 및 건설장비 효율화 방안)

  • Song, Hojeong;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.26-34
    • /
    • 2014
  • Highway construction is a combination of linear, repetitive, and highly equipment intensive operations. Various types of construction equipment are deployed to ensure undisrupted performance of construction, and thus productivity improvement and cost-saving can be achieved through well-thought-out planning. The selection of construction equipment is dependent upon construction sequence, site conditions, and construction methods. In the process of planning, management should consider various types of construction methods per each type of construction operation. Also, management should map out proper construction equipment operation plan that takes the construction duration and cost measures into consideration. However, limited availability of historic data from the similar types of operations has been a stumbling block to proper construction planning, making the operations performed based upon experience and intuition guided by rules-of-thumb. As a consequence, the planing phase rarely provided an adequate validity in the implementation phase. The researchers developed a process logic for each construction type that management can utilize from early phase of highway construction planning process. Moreover, derived the construction equipment combination optimized for efficiency by using the process simulation technique. The developed method is expected to be useful for the decision-making process that aims to evaluate efficiency of various process plans and to ensure optimal selection of construction equipment for highway construction projects.

Development of Cost Estimating Model Using Quantity Variation Analysis by Influence Variables for the Schematic Design Phase (영향변수에 따른 수량변화 분석을 이용한 기본설계단계의 개산견적 모델 개발)

  • Son, Bo-Sik;Lee, Hyun-Soo;Kim, Sung-Tae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.155-166
    • /
    • 2007
  • The purpose of this research is to develop a conceptual model and prototype that establishes a new approach for building cost estimating in the schematic design phage. This research use the method that analyzes quantity and unit price separately to enhance schematic cost estimating through conducting literature review andi analyzing existing schematic cost estimating methods. In addition, this study proposes tile concept of cost breakdown structure including two more classifications: building element and floor compared to existing one only classified by trade. Thus, a Quantity Based Active Schematic cost Estimating(Q-BASE) model is developed founded on those two concepts. By applying proposed schematic cost estimating model, historical structure cost of residential complex building project is analyzed, and then, based on this analysis, prototype is implemented.

A measure for activating BIM by actual application analysis of integrated utilization process of quantity, process(4D), and construction cost(5D) in view of life-cycle

  • Lee, Jae-Hong;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.25 no.12
    • /
    • pp.1-15
    • /
    • 2020
  • In this paper, we propose a novel method for converting the existing 2D processes in the design and construction phase of civil engineering, to the future BIM-based processes. First, we compare and analyze the actual application processes of the outputs of the existing 2D method and the outputs of the 3D BIM method, for the whole process of BIM design of earthworks and road structures and integrated utilization of quantity, process(4D) and construction cost(5D), in view of life-cycle. The proposed method acquire the outputs of the design phase integrating IFC international common standard file information and CBS/OBS/WBS standard classification scheme information, and acquire the outputs of the construction stage by using an integrated utilization module for quantity, process(4D) and construction cost(5D). Ultimately, we intend to commercialize the step by step technologies for BIM design and construction in civil engineering by using the proposed method.

The Time Management System Development for Effective Human Resource Management of Construction Industry (건설업의 인력운용 효율화를 위한 시간관리 시스템 구축 방안)

  • Kim, Kwang-Soo
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2009.11a
    • /
    • pp.339-348
    • /
    • 2009
  • 건설업은 공사수행을 포함한 대부분의 기업 활동이 인력에 대한 의존도가 높은 산업으로서 원가구성 측면에서도 외주비와 재료비를 제외하고 가장 큰 원가항목이 인건비다. 따라서, 건설업의 인력관리 강화는 효율적인 인력 운용과 원가관리를 위해서도 가장 중요한 관리항목이다. 본 연구에서는 건설업에서 체계적인 인력 및 시간관리를 통해 인력운용의 효율을 높일 수 있고, 업무시간 실적 정보에 의해 업무에 대한 성과관리의 정확성을 높일 수 있는 제도운영 및 시간관리 시스템 (TMS: Time Management System) 구축 방안을 소개하였다. 이러한 시간관리는 높은 수준의 인력 및 업무 관리를 가능하게 하고 업무에 대한 우선순위 결정과 적정 시간 분석으로 관습적이고 비효율적인 업무요소를 파악하여 효율적인 인적자원 관리를 하고자하는 건설사뿐만 아니라 프로젝트 산업 군에 속하는 여러 기업들에게 도움을 줄 것으로 기대한다.

  • PDF

A Development and Evaluation of an Web-based Apartment Buildings Energy Information System (웹 기반의 공동주택 에너지 정보시스템 개발 및 시험평가)

  • Kim, Jong-Yeob;Hwang, Ha-Jin;Lee, Jong-Sung
    • Land and Housing Review
    • /
    • v.3 no.3
    • /
    • pp.249-261
    • /
    • 2012
  • The energy use of building operational stage is about 25% of total energy supply in Korea. The intensification of insulation at the design stage and the efficient instruments were used to reduce energy use of the buildings. These efforts are limited at the energy saving side, the residents voluntarily participation in the energy-conservation is more effective. To achieve this purpose, energy use information program (of the individual users) has been developed to lead the energy users actively participating in the energy-conservation program to share at the web. Also, by investigating the necessity and the will of usage of the program and applying a pilot program, the collectability of valid data and the usability have been evaluated.

BIM System Development for Conceptual Design and Pre-Feasibility Study of Cable-Stayed Bridge (BIM 기반 사장교의 개념설계 및 예가분석 시스템 개발)

  • Chun, Kyoung-Sik;Park, Won-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.10
    • /
    • pp.7204-7210
    • /
    • 2015
  • This paper has developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous cable-bridge with 2-pylons. First of all, we'd analyzed the design information (structural design report, blueprint and quantity) of the existing cable-stayed bridges and derived the design variables of cable-stayed bridges. We developed the BIM wizard that generates a cable-stayed bridge model parametrically based on derived design variables. The principle material quantities of cable-stayed bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. Then, we can estimate the construction cost in relation to its quantities and unit cost of cable-stayed bridge. In a result, we have established the system that the construction cost can be estimated more specific than the conventional method (construction estimates per meter or square meter). We hereby will be able to review various alternatives as soon as possible in bidding process.

A Study on the Bid MIS in Construction by Object-Oriented Methodology (공공건설 입찰관리 정보시스템에 관한 연구 - 객체지향 방법론에 의한 공사실적관리를 중심으로 -)

  • Cheon Bong-Gi;Kim Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.131-138
    • /
    • 2002
  • Traditional bidding process and activities in public construction area has many problems in terms of the clearness and fairness of administration. And, it causes many cost consumption to suppliers. As part of the efforts to solve these problems, some public institutions developed the electronic bidding systems. But these systems have still problems in diverse aspects. Therefore, the purpose of this study is to analyze current bidding systems through literature survey and questionnaire, to compare the result of the analysis with the developed electronic bidding systems and to suggest the improvement for the coming bidding systems.

  • PDF

A Experimental Study on the Field Application of Concrete with $CO_2$ Reduction Materials (탄소 저감형 재료를 활용한 콘크리트의 현장 적용성에 관한 실험적 연구)

  • Jeon, Chanki;Jeon, Joongkyu
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.2
    • /
    • pp.128-136
    • /
    • 2013
  • The current contractor for use in performance compared to the performance study of industrial byproducts. Due to the stagnation of the construction business and the rise of raw materials, the contractor of the cost savings and environmental issues, and present a variety of ways for research actively being. Through special about the compressive strength characteristics of the mixed concrete, carbonation resistance and chloride penetration resistance of this study, previous studies have been a lot of progress, industrial byproducts, fly ash and blast furnace slag concrete structures were applied to evaluate.

A Study on Measures for Structuring Overseas Plant Database Through the Analysis of Awarded Overseas Plant Orders (해외 플랜트 공사 수주실적 분석을 통한 효율적인 해외 플랜트 Data Base 구축 방안에 관한 연구)

  • Kim, Sang-Seok;You, Young-Hun;Cho, Chang-Yeon;Son, Jae-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.234-238
    • /
    • 2007
  • Since the plant industry is a total business, it has great impact on the related industries and generates high value. However, in order to have a competitive engineering skills and capabilities, the plant industry requires long-term investment and a continuous strategic planning at the consortium level or national level. Also, a system needs to be established to share the information of the plant industry's overseas orders awarded and success factors. Thus, this study has conducted a survey and case study of the plant construction in foreign countries. Statistical analysis was performed and a basic data structure was built as a means of improving the future technological capabilities of the plant industry.

  • PDF

A Study on the Development of Work-Crew based Daily-Productivity for Representative B.O.Q Item in Road Project (도로공사 대표공종의 생산성 정보 개발에 대한 연구)

  • Seo, Ji-Hyeong;Park, Hyung-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.42-53
    • /
    • 2011
  • This study is to present a method of compiling consistently accurate construction cost estimates in minimum of time. There are two kind of applications for estimating system based on quantity-per-unit and the daily work-crew. The former system is still applied 45% as a estimating method to construction job site by the second half of 2010. However, it is necessary for quantity-per-unit to complement the defect of standard integrating specification and improve the integrating method to the various construction conditions. The later system is intended to represent a standard or basic core which can be adopted in many type of construction estimating used across the wide variety of construction in advanced countries. In this study daily work-crew based on productivity is applied to the representative B.O.Q Item in road project. These results are compared to productivity of Japan and U.S.A estimated under the similar circumstances.