Cost Estimation Model Framework of Road Construction Project through Quantity of Standard Work (대표물량을 활용한 도로공사 개략공사비 산정모델 프레임워크)

  • Kwak, Soo-Nam;Kim, Du-Yon;Han, Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.607-612
    • /
    • 2007
  • Early cost estimation promote efficient budget plan by comparing alternatives and presenting cost information However it is hard to predict accurate cost because of vague cost standard and lack of available information in the early stage. The precious cost model has limitations in the accuracy because they are simple linear model which uses the unit cost per kilometer. This study presents the framework of early cost estimation for road construction projects to overcome the limitation of previous cost model. This study analyzed domestic and foreign cost model and cost data of previous road construction project to present method of cost model framework.

  • PDF

Development of Construction Cost Estimation Model for Elementary, Middle and High School Facilities (초·중·고등학교 시설물별 추정공사비 산정모델 개발)

  • Jung, Eui-Hyun;Yeom, Dong-Jun;Kim, Jun-Sang;Kim, Young Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.3
    • /
    • pp.69-78
    • /
    • 2021
  • Estimated construction cost is an important index to secure an optimal budget which needs to go into construction projects in the previous of basic design phase. In order for public institutions to calculate the estimated construction cost, the cost per unit area of public buildings is used. However, the current calculation method of the estimated construction cost in public buildings is impossible to reflect the characteristics of many facilities and combinations. The purpose of this study is to develop an estimation model in the previous of basic design phase for the elementary, middle and high school facilities. it is expected that it is possible to estimate the construction cost of the elementary, middle and high schools in a reasonable and reliable manner through the estimation model developed in this study.

Approximate Estimating Model Using the Case Based Reasoning - PSC BEAM Bridge - (사례기반추론을 이용한 개략공사비 산정모델 개발 - PSC BEAM교를 중심으로 -)

  • Kang, Chan-Sung;Lee, Geon-Hee;Kim, Kyoung-Min;Kim, Kyong-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.445-448
    • /
    • 2008
  • This study attempts to estimate approximate cost on construction of PSC BEAM Bridge using Case-Based Reasoning and suggests approximate estimation model at the planning and design stage. This paper suggests phased influence factors on construction cost and approximate estimation model for integrated project cost management.

  • PDF

Development of an Approximate Cost Estimating Model for River Facility Construction at Planning Stage (이.치수형 하천공사 개략공사비 산정모델 개발)

  • Lee, Si-Wook;Lee, Jeong-Yoon;Park, Sung-Hwan;Choi, Jae-Joon;Woo, Sung-Kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.95-103
    • /
    • 2009
  • The case of rivers facilities works, expense the standard unit cost for the quality and a rough public corporation expense estimating of the rivers public corporation which is fixed form with the information available which it follows basic design phase absently and possibility of fluctuation. It exists many difficulties in rough public corporation expense estimating. The rivers public corporation expense rough estimating method of existing produces does not exist the amount of material of representative section of the rivers dike and the rough public corporation expense estimating method which is systematic with the method which multiples the seniority (M). The research sees the rough public corporation expense predictive model from the planning stage which is not basic design to consider the quality of the rivers facility public corporation. From this study, it can prevent the waste of national budget from the general public corporation and is more accurate and public corporation expense production possibly.

Development of Basic Construction Cost Estimation Model for Expansion of Underground Parking Lot Remodeling in Apartment Housing (공동주택 지하주차장 확대 리모델링 개략 공사비 산정 모델 개발)

  • Jeong, Eunbeen;Koo, Choongwan;Kim, Taewan;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.42-52
    • /
    • 2021
  • The cost of remodeling parking lots of apartment houses accounts for about 20 percent of the total cost of remodeling. This means that when the remodeling cost of the underground parking lot is known, it becomes possible to estimate the total construction cost. The standard of estimation referenced when calculating the construction cost is difficult to apply to calculating the remodeling cost. Thus, a construction cost estimation model that reflects the characteristics of remodeling construction is necessary. This study developed a basic construction cost estimation model for expansion remodeling of underground parking lots of apartment houses that calculates the approximate cost of construction by reflecting the characteristics and design elements of remodeling. Based on literature review and consultation with experts, 37 activities of underground parking lot remodeling construction were derived. In order to enable calculation of approximate construction cost before the remodeling design drawing is finalized, the quantity calculation formula and unit price for each activity were presented. Based on expert advice, 13 factors that affect the increase in construction cost and weights of each factor were determined. As a result of applying three cases of remodeling complexes to the basic cost estimation model, the accuracy was confirmed to be 93 percent on average.

Analyzing Data for Development of Structures Cost Estimating Model - Focused on Government Building Project - (건축 구조체 공사비 산정모델 개발을 위한 데이터 분석 - 공공청사를 중심으로 -)

  • Kim, Soo-Min;Cho, Jae-Ho;Lee, Jong-Sik;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.212-215
    • /
    • 2008
  • When managers predict exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But present of public construction cost estimation and management almost after the construction documents design phase. Therefore, construction cost management in the early stage and schematic design phase to generally use approximate estimating is not correct. Accordingly, this study analyze problem of current cost estimating method and a concrete cost plans make using case information of actual cost to analyze in schematic design phase. Possible to check going on the suitable design, this study conducts the preliminary research for the development of cost estimating model.

  • PDF

법령과 고시 - 표준시장단가(실적공사비) 제도 관련 계약예규 개정

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.297
    • /
    • pp.110-116
    • /
    • 2015
  • 국가 발주 공사는 3월 1일, 지방자치단체 발주 공사는 3월 9일 예정가격을 작성하는 사업부터 표준시장단가 제도가 적용된다. 대한설비건설협회(회장 이상일)를 비롯한 건설관련 유관단체에서는 실적공사비의 불합리한 공사비 산정 기준 및 운영관행에 대해 폐지 건의를 지속적으로 해왔다. 정부는 이같은 건의를 받아들여 지난해 12월 17일 실적공사비 제도개선을 위한 공청회를 개최하고 개선안을 발표했으며, 이번 계약예규 개정을 통해 개선됐다. 이에 따라 실적공사비 제도를 대체하는 새로운 공공공사비 산정 방식인 표준시장단가 제도가 지난 3월 1일부터 시행에 들어감에 따라 기획재정부는 국가계약예규를, 행정자치부는 지방계약예규를 개정해 각각 지난 3월 1일과 3월 5일 공포하고 시행에 들어갔다. 각 개정 계약예규는 실적공사비의 명칭이 표준시장단가로 변경됨에 따라 용어를 수정했고, 실적공사비 제도 적용배제 범위를 신설했다. 또한 적용배제 공사범위는 300억원 미만 공사 중 100억원 미만 공사는 실적공사비(표준시장단가) 적용을 폐지하고, 100억원 이상부터 300억원 미만 공사는 2016년 12월 31일까지 한시적으로 적용하지 않는다. 정부는 100억원~300억원 공사에 대한 '실적공사비 적용 배제제도' 연장 여부를 2016년 하반기에 실적공사비 현실화 수준 등을 평가하여 재검토할 예정이다. 한편, 표준시장단가 제도는 공사비를 산정할 때 현행 계약단가 외에도 시공단가와 입찰단가 등 다양한 시장 거래가격을 반영하는 제도로, 지난 1월 22일 국가정책조정회의를 거쳐 확정된 '공공건설 공사비 적정성 제고방안' 후속조치의 일환으로 공공공사비 예정가격 산출방식의 하나인 실적공사비제도를 개선한 것이다.

  • PDF

Approximate Estimating Model for PSC BEAM Bridge Using Influence Factors (PSC BEAM 교량 공사비 영향요인을 이용한 개략공사비 산정모델 개발)

  • Kang, Chan-Sung;Lim, Won-Seok;Kim, Kyoung-Min;Kim, Kyong-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.585-588
    • /
    • 2007
  • This study attempts to analyze estimating process and the level of information performing literature review and questionnaire and identify phased influence factors on construction cost using phased information of project and suggests framework of approximate estimation model at the planning and design stage. This paper suggests phased influence factors on construction cost and framework of approximate estimation model for integrated project cost management.

  • PDF

A Study on the Construction of Computerized Algorithm for Proper Construction Cost Estimation Method by Historical Data Analysis (실적자료 분석에 의한 적정 공사비 산정방법의 전산화 알고리즘 구축에 관한 연구)

  • Chun Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.192-200
    • /
    • 2003
  • The object of this research is to develop a computerized algorithm of cost estimation method to forecast the total construction cost in the bidding stage by the historical and elemental work cost data. Traditional cost models to prepare Bill of Quantities in the korea construction industry since 1970 are not helpful to forecast the project total cost in the bidding stage because the BOQ is always constant data according to the design factors of a particular project. On the contrary, statistical models can provide cost quicker and more reliable than traditional ones if the collected cost data are sufficient enough to analyze the trends of the variables. The estimation system considers non-deterministic methods which referred to as the 'Monte Carlo simulation. The method interprets cost data to generate a probabilistic distribution for total costs from the deficient elemental experience cost distribution.

A Study on the Construction Cost Index for Calculating Conceptual Estimation : 1970-1999 (개략공사비 산출을 위한 공사비 지수 연구 : 1970-1999)

  • Nam, Song Hyun;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.5
    • /
    • pp.527-534
    • /
    • 2020
  • A significant factor in construction work is cost. At early- and advanced-stage design, costs should be calculated to derive realistic cost estimates according to unit price calculation. Based on these estimates, the economic feasibility of construction work is assessed, and whether to proceed is determined. Through the Korea Institute of Civil Engineering and Building Technology, the construction cost index has been calculated by indirect methods after both the producer price index and construction market labor have been reprocessed to easily adjust the price changes of construction costs in Korea, and the Institute has announced it since 2004. As of January 2000, however, the construction cost index was released, and this has a time constraint on the correction and use of past construction cost data to the present moment. Variables were calculated to compute a rough construction cost that utilized past construction costs through surveys of the producer price index and the construction market labor force consisting of the construction cost index. After significant independent variables among the many variables were selected through correlation analysis, the construction cost index from 1970 to 1999 was calculated and presented through multiple regression analysis. This study therefore has prominent significance in terms of proposing a method of calculating rough construction costs that utilize construction costs that pre-date the 2000s.