• Title/Summary/Keyword: 공사비보상

Search Result 10, Processing Time 0.035 seconds

The study on the depreciated compensation system for residual land (잔여지 감가보상에 관한 연구)

  • Park, Yong-Han
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.8 no.2
    • /
    • pp.307-312
    • /
    • 2013
  • The compensation system for residual land in our country is largely composed of the three sub-systems, that is, the purchasing compensation, depreciated compensation and construction expenses compensation. Among those, the purchasing compensation system mainly has problems in eligibility for compensation of the land, meanwhile, there is almost no problem in construction expenses compensation system. This study aims to examine the current depreciated compensation system for the residual land and its accompanying problems, and also review and compare those systems in USA and Japan with that of our country, and thereby discover the ways for the alternative solution for the compensation system in the viewpoint of policy.

Method of Transparency Guarantee for Compensation Budget expenditure using Connection of Construction CALS and dBrain (건설CALS와 국가재정정보시스템 연계를 통한 보상비 집행의 투명성 확보 방안)

  • Seo, Myoung-Bae;Kim, Nam-Gon
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2011.04a
    • /
    • pp.1608-1609
    • /
    • 2011
  • 국토해양부에서는 건설사업의 생산성을 향상시키고 건설사업의 효율성을 제고하기 위해 건설기술관리법 제15조의 2에 따라 건설공사지원통합정보체계의 구성.운영에 관한 법률을 마련하고 1998년부터 건설사업정보화(Continuous Acquisition Life-Cycle Support : CALS)를 추진중에 있다. 건설사업정보화의 일환으로 건설공사비의 상당부분을 차지하고 개인의 소유권과 관계되어 있어 민원 소지가 많은 보상자료를 관리하기 위해 용지보상시스템이 기 개발되어 운영중에 있으나 보상비 지출의 핵심과정인 지급단계가 국가재정정보시스템과 별도로 운영중에 있어 체계적인 보상자료 관리 및 보상비 지급의 이력관리가 제대로 이루어지 지고 있지 않다. 이는 곧 부적절한 보상비 집행으로 인한 국고예산 낭비의 소지가 있고 보상비 집행에 대한 대민 신뢰도 저하로 인해 다수의 소송으로 이어질수 있다. 이에 기존의 보상비 집행업무 프로세스 개선 및 건설CALS 용지보상시스템과 디지털예산회계시스템의 연계를 통해 보상비 집행의 투명성을 확보하고 민원인들에게 대민행정에 대한 신뢰도를 높일 수 있는 방안을 제시하고자 한다.

A Study on the GIS Methodologies to Appraise the Parcel Prices and to Estimate the Compensation Expenditures according to Road Expansions. (GIS를 활용한 개별 공시지가 산정 및 도로개설에 따른 토지보상비 산정 방법론)

  • 구자훈;김성희
    • Spatial Information Research
    • /
    • v.7 no.1
    • /
    • pp.49-61
    • /
    • 1999
  • The purpose of this study is to find out the methodologies, using GIS techniques, to appraise the parcel prices and to estimate the compensation expenditures according to road expansions. This study consists of 2 parts. The first pare is to find out the ways for appraisal of patrol prices in certain area by the publicly announced land prices. The second part is to estimate the differences of compensation expenditures according to road expansion methods. The conclusions are as follows. First, to appraise the target parcel prices, a comparison to the publicly announced land prices should be used. For this, 19 items of land characteristics of existing land information should be analyzed and compared using GIS techniques. Second, the compensation expenditure could be easily estimated using GIS techniques too. In this process, if necessary, we have to apply the minimum parcel size in Building Codes.

  • PDF

Comparative Analysis of a Boundary Discordant of Land at Construction Work Survey (건설공사의 용지경계 불부합에 관한 비교분석)

  • Han, Soung-Man;Park, Tai-Sik
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2010.04a
    • /
    • pp.327-332
    • /
    • 2010
  • 용지경계의 불부합은 공사 현장의 용지 보상 때마다 발생되는 커다란 문제점으로 대두대고 있으며 이로 인한 공사비증액, 재설계, 공사지연등 많은 국가적 예산을 소모하고 있는 실정이다. 이에 금번 연구에서는 "광명시대로 3-15호선 외 2개도로 개설공사"에 대하여 용지 불부합에 대하여 그 원인을 분석 하였다. 그 결과 연속지적도와 지형의 불일치로 인하여 공사용지보상선이 3m-4m 좌측으로 편측되어 있음을 알 수 있었으며 이로 인한 추가 용지보상과 재설계가 불가피 하게 되었다. 향후 연속지적도의 좌표체계의 정확도 개선 및 수정 그리고 지형 지적도의 일치하는 작업이 시급한 것으로 나타났다.

  • PDF

Developing an Optimized Scheduling Process Model for Controlling the Noise in Construction Field (건설현장 소음제한을 고려한 최적 스케줄링 프로세스 모델 개발)

  • Lee, Seung-Hak;Son, Jea-Ho;Lee, Seung-Hyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.467-476
    • /
    • 2014
  • According to the expanding of construction machinery works, the number of civil complaints demanding compensations are increasing continuously from surrounding residents due to the noise from construction fields. However, the noise is usually managed restrictedly during the construction phase rather than prevented in advance. So, the efforts to solve the noise problem are occurring only after complaints have been made. Also, excessive cost and time consuming in order to solve the complaints negatively affects to construction companies. Therefore, the purpose of this study is to develop an optimized scheduling process model for controlling the noise in construction field by considering the planned time, cost, and the number of equipment before construction. In addition, this process model is expected to provide a useful information about the cost comparison between the original planned cost plus compensation and the optimized cost considering noise limitation so that the site managers can manage their projects effectively.

A Study on Business Value for the Creation of a Private Park regarding Long-term Non-executed Urban Parks - Focused on Long-term Non-executed Neighborhood Park in Gwangju Metropolitan City - (장기미집행 도시공원의 민간공원 조성을 위한 사업성 연구 - 광주광역시 장기미집행 근린공원을 중심으로 -)

  • Kim, Ho-Gyeom;Kim, Dong-Chan
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.44 no.5
    • /
    • pp.81-91
    • /
    • 2016
  • The study shows solutions of long-term unexecuted urban park and activation plans to facilitate the business promotion of Private Park Developers. This study conducted a feasibility analysis to determine if the business of a special case is applicable. The result of this study is as follows about three long-term unexecuted urban parks in Gwangju Metropolitan City's City Park. First, the three long-term unexecuted urban parks in Gwangju Metropolitan City's City Park are the forest type Neighborhood Parks. Businesses of a special case's park developing cost(average 0.4%) have a relatively low percentage. It is most affected by Land Compensation(average 33.8%) and building construction expenses(average 59.1%). Second, long-term unexecuted urban parks' Land Compensation and building construction expenses seed capital are excessive. The Bongsan Park balance floor space index is 179 percent; a reasonable profit floor space index is 220 percent. The Mareuk Park balance floor space index is 351 percent; a reasonable profit floor space index is 420 percent. The Jungoe Park balance floor space index is 327 percent; a reasonable profit floor space index is 400 percent. Third, to facilitate the business of special cases in deliberating, Bongsan Park should change its second class general residential area. Jungoe Park must change the quasi-residential area and semi-residential area. Mareuk Park must change the general commercial area. In this way, the feasibility of promoting private park projects will be improved.

Study on Determination of Proper Pillar Width in Road Tunnel Design Stage (도로터널에서 적정한 필라폭 산정에 관한 연구)

  • Yang, Tae-Seon;Kim, Jae-Kyoung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.5
    • /
    • pp.187-194
    • /
    • 2010
  • As the design of the pillar width (PW) of the parallel tunnels in downtown area, in which are located in plains zone with deep alluvium compared with mountain tunnels, is directly related with pre-compensation payment and costs of the underground area, it has to be planned as to keep minimum distance while securing the stability of the parallel tunnels. Although PW of downtown road tunnel in Korea is standardized as 1.5D(D: diameter of the tunnels), PW sometimes has to be reduced within 1.5D to adjust the tunnel lines to the city plan in the cases of the inlet and outlet of the tunnels. In this paper, the design and the analyses of optimum PW of the NATM type road tunnel in the downtown area are introduced. The relationship among the tunnel line planning and underground compensation fee, and ground characteristics are evaluated. In the determination of PW distance, the numerical analyses of underground road tunnels were performed, including the use of the strength decrease method and strength/stress ratio method. In the cases of inlet and outlet part of the tunnels where the stability of the pillars is poor due to contiguous construction of the parallel tunnels, the reinforcement methods are recommended for securing the stability. Numerical verification was performed for the reinforcement proposed.

Technical Proposal based Bidding System Applying the Concept of the Lowest Total Combined Bid Price for Supplying Affordable Housing (최저통합환산가격 개념을 적용한 기술제안 기반 입찰제도)

  • Cho, Gun-Hee;Kang, Seung-Hee;Lee, Jeong-Seok;Sohn, Jeong-Rak;Bang, Jong-Dae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.94-105
    • /
    • 2010
  • Recently, resettlement problems of low income groups in the urban regeneration area have been issued in Korea because they have no capability to purchase (or lease) redeveloped housing (or apartment). There are several approaches for supplying affordable housing and one of these is the bidding system which can reduce construction cost. However, the lowest bidding system has many problems such as dumping and substandard quality. In this context, this study proposed bidding system based on technical proposal applying the concept of the lowest total combined bid price for optimization of bid price, reduction of construction cost and period, and maintenance of suitable quality. This bidding system embraces the best value and cost plus time concept on the basis of an improved lowest price bidding system. It consists of the following components: work unit based, project unit based, and period reducing technical proposals. The proposed bidding system for determining bidders are designed to evaluate the adequacy of each technical proposal in the order of the combined minimum price in an effort to effectively optimize bid prices and reduce the construction periods, as well as to maintain a minimum appropriate quality.

A Case Study on the Calculation of Delay Damages for Contractors according to the Extension of Contract Period (계약기간 연장에 따른 시공자의 손실비용 산정에 관한 사례 연구.)

  • Lee Gi-Han;Kim Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.305-310
    • /
    • 2001
  • The purpose of this study is to calculate delay damages for contractors. The study has been performed by investigation of delay cost occurrence status and the analysis of subway construction cases. The results of this study are as follows: 1. Delay cost( 1day) equivalent to $0.005\%$ of total construction cost by analysis case studies. 2. Including bank interest, dealy cost is analysed as the following; $1.1\~9.2\%$ of total construction cost in part extension period, $3.3\~11.0\%$ of total construction cost in total extension period. 3. In comparison between liquidated damages and delay cost, liquidated damages account for average 20.1 times of delay costs. 4. Acceleration cost will be calculate on the basis of delay cost calculation method. In the result of this method, acceleration cost is equal to delay cost at least or must be large than delay cost

  • PDF

A Study on the Construction for Optimal Network of Metro Transfer System in Yangsan Area (양산지역 도시철도 환승체계 최적노선망 구축에 관한 연구)

  • Choi, Yang Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.1D
    • /
    • pp.27-36
    • /
    • 2010
  • Recently, the management of metro business in large cities has become more difficult because of increased construction and operation costs. The purpose of this paper presents the construction of transfer system to resolve about recent tendency to decrease of metro-users and diminution of use efficiency which are serious problems of Busan metro. To cope with this situation, it is necessary to examine the methods of obtaining returns on development profits of land value rises that occur due to transfer system construction between Busan metro line #1 and line #2 in Yangsan area. Therefore, it was made use of research on metro utilization to presuppose service improvement, as an alternative, in the transfer system construction between metro and metro which might be powerful influence over metro-users. In this research, it was examined the actual situation of rises in land values brought about by the transfer system construction of metro line #1 and line #2 in Yangsan area with application of four (4) methods, and have calculated a basis of the development profits produced by the transfer system construction of metro line. According to the economical efficiency analysis, the total construction cost amount to 4,827.1 billion won of case #1 based on single track, and evaluate economically as B/C to 1.013, NPV to 72.7 billion, IRR to 5.614 percent.