Erection Method for Marine Section of Double Deck Warren Truss in Young Jong Grand Bridge (영종대교 복층 Warren Truss 해상구간 가설공법)

  • Kim Jeong-Woong;Seo Jea-Hwa;Yang Mu-Seok;Yuk Il -Dong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.232-239
    • /
    • 2001
  • Young Jong Grand Bridge is approach traffic road of New Inchon International Airport which covers hub airport function in northeast asia. The total span length of this bridge is $4,420{\cal}m$ and this main bridge type is, the first in the world, Double Deck Self Anchored Suspension Bridge, designed as double deck systems to be arranged by road and railroad. Approach bridges to be connected with main span also are composed double deck steel truss and steel box girder to consider a continuity with this span. Our company erected $1,375{\cal}m$(about 60,000tons) of double deck steel truss bridge type which is composed by 6 traffic lane on upper deck and 4 traffic lane and Double track railroad on lower deck. The original installation method of this bridge was planed to install about 75 meters bridge blocks to use floating crane, after temporary bent was constructed between permanent piers. But this method which had to construct many temporary bents in the sea had the matter that construction periods can become lengthen and construction cost can be risen. To overcome the uncertainty to ensure high qualify of bridge and economic project execution, our company developed new bridge erection method to assure both quality control and economic construction work. The new erection method which was developed by us was one that could transport and install long bridge block, $120{\cal}m$ unit at a time and that temporary bent was not required. We hope that this paper is used as technical data which will erect bridge in the western sea and others marine region.

  • PDF

Satisfaction Level and Performance Evaluation for CM Service in Korea (국내 건설사업관리 업무만족도 및 성과평가)

  • Kim, Won-Tae;Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.108-117
    • /
    • 2013
  • The domestic CM business market has continued to grow, but its size is relatively small yet in comparison with the total size of the domestic construction industry. Evaluation of CM projects was conducted through questionnaire surveys. Both clients and CM firms showed positive satisfaction levels. Nevertheless, the clients' satisfaction levels were relatively low in safety management, cost management, and document and information management. Superior areas of CM tasks were time management and recovery scheduling, quality control and technical instruction, and design value engineering. On the other hand, inferior areas of CM tasks were claim analysis and dispute resolution, cost estimation, and life cycle costing. Both entities have agreed with the positive effects of CM involvement in terms of cost saving, time reduction, quality improvement, and safety incidents prevention to at least 0~5% extent.

Private Procurement for Constructions and Operation of Buman Road in Daegu (도시 인프라 시설을 위한 민자 유치 -대구시 범안로 민자도로의 운영 실태와 대책-)

  • Choi, Byung-Doo
    • Journal of the Korean association of regional geographers
    • /
    • v.13 no.6
    • /
    • pp.674-694
    • /
    • 2007
  • Recently private procurement projects for urban infrastructure have been emphasized and introduced by government(both central and local) as an important method to supplement public budget shortage and to improve creativity and efficiency in its construction and operation, and hence to promote regional development. But these private procurement projects seem to be implemented under the neoliberal condition of urban policy for private capital to extend its sphere of investment and to ensure its opportunity of profit. Such private procurement projects for urban infrastructure have been legislated and widely applied since 1994 in S. Korea, but in recent years they have triggered out a variety of serious problems. In results of this study on the private procurement for construction and operation of Burnan Road in Daegu, it can be pointed out, it has led serious problems such as overestimation of traffic volume in plan, over-appropriation of construction cost and appurtenant business, irYational operation and account of the operating firm, problem in refinancing and change in contents of practical agreement, and over-compensation of minimum operation revenue. Some measures that can be considered as alternatives to resolve those problems and to operate more rationally the Buman Road include those of increasing traffic revenues, of reducing supports of public financing, and withdrawal of (part or whole of) operational right from the private firm.

  • PDF

A study on the Construction of Seokjojeon Hall of Deoksugung Palace and the influx of Western Furniture, on the Daehan Empire (대한제국기 덕수궁 석조전 건립과 서양가구 유입)

  • Kim, Yun-hee
    • Korean Journal of Heritage: History & Science
    • /
    • v.47 no.3
    • /
    • pp.4-23
    • /
    • 2014
  • Seokjojeon Hall is the Neoclassic style building situated in Deoksugung Palace, which was proposed by John McLeavy Brown who was a chief commissioner of the Daehan Empire and designed by John Reginald Hardings in 1897. Construction of the Seokjojeon Hall began in 1900 and completed in 1910 at the total cost of one million won. Decorating and furnishing of the interior was designed by Lovell and all the furniture of Seokjojeon Hall had been purchased from Maple&Co. The Maple&Co was the supplier of luxury furnitures and decorating items for luxurious residentials, hotels, embassies and the palaces and its headquarter was located in London. Ready-made furnitures were purchased as shown in the Maple's catalog. The designs and styles of the west were applied to Seokjojeon Hall. That is one of the aspects showing Daehan Imperial underwent a period of Westernization.

A Study on the Application of the Price Prediction of Construction Materials through the Improvement of Data Refactor Techniques (Data Refactor 기법의 개선을 통한 건설원자재 가격 예측 적용성 연구)

  • Lee, Woo-Yang;Lee, Dong-Eun;Kim, Byung-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.6
    • /
    • pp.66-73
    • /
    • 2023
  • The construction industry suffers losses due to failures in demand forecasting due to price fluctuations in construction raw materials, increased user costs due to project cost changes, and lack of forecasting system. Accordingly, it is necessary to improve the accuracy of construction raw material price forecasting. This study aims to predict the price of construction raw materials and verify applicability through the improvement of the Data Refactor technique. In order to improve the accuracy of price prediction of construction raw materials, the existing data refactor classification of low and high frequency and ARIMAX utilization method was improved to frequency-oriented and ARIMA method utilization, so that short-term (3 months in the future) six items such as construction raw materials lumber and cement were improved. ), mid-term (6 months in the future), and long-term (12 months in the future) price forecasts. As a result of the analysis, the predicted value based on the improved Data Refactor technique reduced the error and expanded the variability. Therefore, it is expected that the budget can be managed effectively by predicting the price of construction raw materials more accurately through the Data Refactor technique proposed in this study.

A Study on Characteristics of Self-weight Consolidation of Bottom Ash Mixed Soil (Bottom Ash 혼합토의 자중압밀 특성 연구)

  • Yoon, Won-Sub;Shin, Seung-Gu;Chae, Young-Su
    • Journal of the Korean Geosynthetics Society
    • /
    • v.14 no.4
    • /
    • pp.59-77
    • /
    • 2015
  • In order to meet the new requirements for landfill materials, this study planned a study to apply mixed soil of mixing bottom ash and coastal dredged soil to the dredged ground. Coal ash generated from thermal power plant is divided into fly ash and bottom ash. In the case of fly ash, many studies have been conducted because small particles causes permeability coefficient to be small during recycling so no problem has been raised in the environmental area but the utilization of bottom ash has been limited because environmental problems have been raised during recycling due to its larger particle size and greater permeability coefficient. According to recently published studies, however, the results of the study that conducted the water analysis of leachate generated in the ground improvement section using bottom ash showed that heavy metal contamination levels were found to be within the reference value and no significant environmental problems were found so utilization of bottom ash is evaluated to increase significantly in the future. This bottom ash has the particle size of sand and only transportation costs need to be considered when providing materials because the majority has been disposed and it is judged as the most suitable material in dredging landfill in the economic aspect because most thermal power plants are located in the coast and transportation costs can be reduced by ship. Also, research on mixed soil that can maximize the effect of the construction period and construction cost savings than dredged soil is determined as needed because the demand for coastal dredging reclamation is increasing such as Saemangeum project etc. Therefore, we studied self-weight consolidation characteristics depending on sample processing and mixing method of mixed soil by carrying out interior self-weight consolidation experiments on mixed soil of mixing bottom ash and Kaolinite according to the new development needs of recent coastal reclaimed ground and these result findings are expected to be used as basic data when applying the large coastal dredged ground in the future.

Design of Truck Escape Ramps (자동차 긴급 피난 차선의 계획 설계)

  • 구본충
    • Journal of the Korean Professional Engineers Association
    • /
    • v.28 no.4
    • /
    • pp.54-75
    • /
    • 1995
  • This synthesis has been prepared from a review of literature on Truck Escape Ramps technology and a survey of current practice by state department of transportation. Their locations have been determined usually from a combination of accident experience and en-gineering judgement, but new tools are emerging that can identify needs and sites without waiting for catastrophic accidents to happen. The Grade Severity Rating Systems holds promise in this regard. Design Procedures for truck excape ramps continue to evolve. Gravel arrester beds are clearly the preferred choice across the country Rounded aggregate, uniformly graded in the approximate size range of 13 to 18mm. Tech-nical publications typically have dassified TER types as paved gravity, sandpile, and ar-rester bed ramps. The design speed for vehicle entry into the ramp in critical to the deter-mination of ramp length. An escape ramp should be designed for a minimum entry speed of 130km/hr, a 145km/hr design being preferred. The ramps should be straight and their angle to the roadway align-ment should be as possible. The grade of truck escape ramps show the adjustment of ramp design to local topography, such as the tradeoff of ramp length against earthwork requirements. A width of 9 to 12m would more safety acommodate two or more outof con-trol vehicles. Reguarding comments on the most effective material, most respondents cited their own specification or referred to single graded, rounded pea gravel. The consensus essentially Is that single graded, well -rounded gravel is the most desirable material for use in arrester beds. The arrester beds should be constructed with a minimum aggregate depth of 30cm. Successful ramps have used depths between 30 and 90cm.

  • PDF

Experimental Study of Flip-Bucket Type Hydraulic Energy Dissipator on Steep slope Channel (긴구배수로 감세공의 Filp Bucket형 이용연구)

  • 김영배
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.13 no.1
    • /
    • pp.2206-2217
    • /
    • 1971
  • Spillway and discharge channel of reservoirs require the Control of Large volume of water under high pressure. The energies at the downstream end of spillway or discharge channel are tremendous. Therefore, Some means of expending the energy of the high-velocity flow is required to prevent scour of the riverbed, minimize erosion, and prevent undermining structures or dam it self. This may be accomplished by Constructing an energy dissipator at the downstream end of spillway or discharge channel disigned to dissipated the excessive energy and establish safe flow Condition in the outlet channel. There are many types of energy dissipators, stilling basins are the most familar energy dissipator. In the stilling basin, most energies are dissipated by hydraulic jump. stilling basins have some length to cover hydraulic jump length. So stilling basins require much concrete works and high construction cost. Flip bucket type energy dissipators require less construction cost. If the streambed is composed of firm rock and it is certain that the scour will not progress upstream to the extent that the safety of the structure might be endangered, flip backet type energy dissipators are the most recommendable one. Following items are tested and studied with bucket radius, $R=7h_2$,(medium of $4h_2{\geqq}R{\geqq}10h_2$). 1. Allowable upstream channel slop of bucket. 2. Adequate bucket lip angle for good performance of flip bucket. Also followings are reviwed. 1. Scour by jet flow. 2. Negative pressure distribution and air movement below nappe flow. From the test and study, following results were obtained. 1. Upstream channel slope of bucket (S=H/L) should be 0.25<H/L<0.75 for good performance of flip bucket. 2. Adequated lip angle $30^{\circ}{\sim}40^{\circ}$ are more reliable than $20^{\circ}{\sim}30^{\circ}$ for the safety of structures.

  • PDF