Formal Estimation Method for Optimal Budget Appropriation of Highway Construction Projects under Long-term Continuation Contracts (장기계속계약제도 하에서 고속도로공사 최적공사비 산출방안 정립에 관한 연구)

  • Koo, Bon-Sang;Yu, Jung-Ho;Park, Jong-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1405-1412
    • /
    • 2015
  • In Korea, public infrastructure projects employ "long term continuation (LTC) contracts," which require budgets to be reevaluated and re-appropriated annually throughout the multi-year life of the project. However, such contracts also make it susceptible to frequently changing government policies, in which budgets required for existing projects are allocated to new projects and thus does not provide a consistent stream of capital to multi-year projects. Each year, the KEC needs to attain government funds for construction of its multiple highway construction sites. Because it is difficult to know the amount that may be actually appropriated to KEC in a given year, it is in turn difficult to anticipate and provide sufficient funds necessary for construction to run smoothly and continuously. The lack of a good logic for appropriation has resulted in projects having a skewed distribution of capital. To get better budget appropriations from the central government, the KEC first needs a systemized approach that rationalizes the annual construction capital optimally required for its individual sites. The goal of this research was to devise a way that allows the KEC to determine and calculate the optimal construction costs that would be required for its individual construction sites on an annual basis. Both the optimal progress rate and the essential work types were assessed through a workshop with 24 professionals (KEC employees and contractors) who had extensive experience in KEC projects and also were currently working in these projects.

Quantification of Schedule Delay Risk of Rain via Text Mining of a Construction Log (공사일지의 텍스트 마이닝을 통한 우천 공기지연 리스크 정량화)

  • Park, Jongho;Cho, Mingeon;Eom, Sae Ho;Park, Sun-Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.1
    • /
    • pp.109-117
    • /
    • 2023
  • Schedule delays present a major risk factor, as they can adversely affect construction projects, such as through increasing construction costs, claims from a client, and/or a decrease in construction quality due to trims to stages to catch up on lost time. Risk management has been conducted according to the importance and priority of schedule delay risk, but quantification of risk on the depth of schedule delay tends to be inadequate due to limitations in data collection. Therefore, this research used the BERT (Bidirectional Encoder Representations from Transformers) language model to convert the contents of aconstruction log, which comprised unstructured data, into WBS (Work Breakdown Structure)-based structured data, and to form a model of classification and quantification of risk. A process was applied to eight highway construction sites, and 75 cases of rain schedule delay risk were obtained from 8 out of 39 detailed work kinds. Through a K-S test, a significant probability distribution was derived for fourkinds of work, and the risk impact was compared. The process presented in this study can be used to derive various schedule delay risks in construction projects and to quantify their depth.

A Study on the need to strengthen safety and health activities of private construction contractors (건설공사 민간 발주자의 안전보건활동 강화 필요성에 관한 고찰)

  • Keun-Kyu Lee;Min-Je Choi;Guy-Sun Cho
    • Industry Promotion Research
    • /
    • v.9 no.2
    • /
    • pp.69-75
    • /
    • 2024
  • Korea has entered the ranks of advanced countries in terms of economic size and technological competitiveness. However, its industrial accident fatality rate remains among the lowest in OECD countries, and recent incidents such as various building collapses have resulted in numerous deaths of workers or citizens, reminiscent of accidents in developing countries. According to the 2022 Industrial Accident Status Analysis by the Ministry of Employment and Labor, out of the 874 fatalities in work-related accidents in 2022 across all industries, 402 were in the construction industry, accounting for approximately 46% of all fatalities. In particular, the construction industry's fatality rate stands at 1.61, significantly higher than the overall industry fatality rate of 0.43, indicating its severity. Construction ranks highest in terms of fatality rates, with mining at 12.18 and fishing at 1.80. When categorizing construction projects into private and public, private projects show significantly higher figures in terms of contracts, contract amounts, accident numbers, and fatalities compared to public projects. However, unlike public agencies, many private clients lack adequate safety and health activities and lack established safety and health systems. This study aims to raise awareness among private clients about the need to establish safety and health systems and enhance safety and health activities, and to discuss the direction of future development of advanced safety and health practices among private clients.

A Study on the Realization of Dust Damage Compensation Calculation for the Prevention of Dust Damage in Construction Site (공사장 먼지피해 예방을 위한 먼지피해 배상액 산정 현실화 방안 연구)

  • Kim, Jinho
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.2
    • /
    • pp.374-385
    • /
    • 2022
  • Purpose: Even if a damage is applied to the dust of the construction site containing the first-class carcinogen, it is dismissed or 5~30% of the amount of noise damage compensation is paid., Because of such loopholes, some construction companies are neglecting the dust management of the construction site, and the damage of the workers and the residents in the construction site continues. Method: The purpose of this study is to examine the problems of the calculation criteria of damage compensation amount of construction site dust, the measurement of dust concentration, the analysis of measurement data (the data of electric signboard measuring device by the mining scattering method), the prediction and evaluation methods such as modeling, and to suggest improvement measures. Result: It is found that it is impossible to calculate the amount of damages from dust damage in the construction site by calculating the current dust damage compensation amount and dust concentration modeling and measurement. Conclusion: It will receive an application for compensation for damage within the site where damage is expected (about 100m in the straight line and the boundary line of the site), and present a method of calculating the amount of compensation that differentially evaluates dust damage to the degree of dust management and compliance with dust-related legal standards.

A Study on Improvement of Occupational Safety and Health Management Cost Accounting Standards (대규모 건설현장 건설업 산업안전보건관리비 계상기준 개선에 관한 연구)

  • Baek, Yuonghyun;Wee, Kyungsu;Baek, Insoo;Kim, Jaejun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.39-46
    • /
    • 2020
  • Occupational Safety and Health Management Cost were introduced in 1988 to prevent human safety accidents occurring in industrial sites. However, the accounting standards of Occupational Safety and Health Management Cost based on five construction types and three construction amounts do not reflect the characteristics of various construction sites. In order to understand this problem, this study analyzed the utilization rate and usage details of Occupational Safety and Health Management Cost of domestic construction companies. As a result, this study identified considerable number of projects surpassed the limits of allowed usage of Occupational Safety and Health Management Cost and analyzed their causes. Based on these findings, this study suggests the necessity and direction of improvement of Occupational Safety and Health Management Cost accounting standards.

Case Study of Cooperative Learning Simulating Turn-Key System in Design Class for Environmental Engineering (턴키 제도를 모사한 환경공학 설계과목의 협동학습 적용사례)

  • Kim, Geon-Ha;Oh, Ju-Won;Lee, Hack-Soo
    • Journal of Engineering Education Research
    • /
    • v.9 no.4
    • /
    • pp.5-9
    • /
    • 2006
  • In this research, a case study for cooperative learning practiced in a design class for environmental engineering was presented. Designing a treatment facility for urban diffuse pollution was a main problem given to the participants. Turn-key system for civil works were simulated throughout class works. Twenty five students were grouped into four virtual companies and assigned own position from chairperson to workers. Each group competed throughout establishing design concept regarding order, expense calculation, process distribution, actual calculation. Best design with lowest bidding won the first place. For evaluating class effectiveness, one student from each group were monitored thorough semester. Participants were improved for their understanding about company establishment, turn-key system management, awareness about personal management, and presentation skills. Tension of the class was effectively elevated as well.

The Research About Suitability of The Cost of Work According to The Alteration of Design Literature (설계도서 변경에 의한 실 공사비의 책정에 관한 연구)

  • Im, Chil-Soon;Lee, Gyu-Chel
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.3
    • /
    • pp.113-120
    • /
    • 2003
  • The purpose of this thesis is to provide an appropriate trade-off information for the conflicting interests caused by the various factors between building owner and contractor during selecting the contractor and performing the construction work, in which the construction was contracted by open bidding from the government or private organizations. In order to propose the legitimate evidence, the differences between the domestic contract sheet of drawing change and the process of drawing change and those of the foreign countries were compared and analysed. The number of construction ordered in Youngdong area in 2001 whose construction expenses are more than 100,000,000 won is 218 items and 147,005,000,000 won in total cost. Among them, the number of 218 items whose total cost amounts to 16,705,000,000 (11.36%) is in case of increase of construction expenses due to the drawing changes, and the number of 48 items whose total cost amounts to 2,009,000,000 won (1.37%) is the case of decrease. In conclusions, the contractor could have more benefits than the building owner in case they submit the detailed estimate sheet without eliminating the increasing expenses of construction. It is shown that the building owner's loss is increasing whenever the labor cost is higher than material cost. Therefore, this thesis proposes a proper standards for the harmonious compromise between the contractor and the building owner for the problems caused by the drawing changes when the contract agreement is occurred.

A Study on Improvement Plans for Safety and Health Technical Support Project on Small Business by Field (소규모 사업장 안전보건 기술지원사업의 분야별개선방안에 대한 연구)

  • Yongro Ahn;Taekeun Oh
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.3
    • /
    • pp.625-632
    • /
    • 2023
  • Due to the recent occupational accidents, the government made efforts such the Severe Accident Punishment Act and roadmap for reducing severe accidents. In particular, more than 80% accidents occur in small businesses, such as those with less than 50 employees and construction sites with a construction cost of less than 100 million, and practical efforts are needed to reduce them. In small businesses, the appointment of a safety managers and safety and health management regulations have been excluded in whole or in part, and technical guidance from an institution specializing in accident prevention is compulsory to supplement them. In this study, the problems of the safety and health technology support project for small workplaces has been identified through a survey and improvement plans were proposed.

기획단계에서의 최적 개산견적산정의 방법론 고찰

  • Kim Chan-Joong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.120-125
    • /
    • 2003
  • The estimated construction costs derived at the Planning stage of a project are utilized as important data determining the feasibility of overall project. Therefore the clients usually expect to have estimations of the construction cost as precise as possible and there has been extensive studies carried out by the cost specialists worldwide to satisfy this client's specific need whereas the local estimators still heavily rely on producing quantities and detail quotations only. This paper is to introduce a case study where elemental/functional area cost analysis is incorporated into a database system for the improved accuracy in cost estimations.

  • PDF

Formulation to Produce Safety Engineers by Project Amount Assigned to Construction Site (건설공사 금액별 안전관리자 선임수 산정식 도출에 관한 연구)

  • Son, Ki-Sang;Gal, Won-Mo;Choi, Jea-Nam
    • Journal of the Korean Society of Safety
    • /
    • v.24 no.3
    • /
    • pp.25-31
    • /
    • 2009
  • Safety engineers should be reasonably assigned to construction sites in order to prevent accidents specially for large-scaled projects. More engineering-oriented safety engineers should be assigned to those large-scaled projects because accident causes are found to be due to more technical aspects rather than general safety problems. more experienced engineers should be assigned to larger scaled projects for covering more technical aspects. This one is analyzed by the existing accident results. This study is to find out some formulae to calculate how many safety engineers should be assigned to construction sites, by amounts, by project kinds, by project scales, by engineer grades. So that construction contractor can assign them to their site economically.