Analysis of the Impact of Construction Planning Tasks on Project Cost and Schedule Success in Residential Projects (공동주택 설비공사 계획업무의 성과지표에 미치는 영향분석)

  • Kim, Dae Young;Lim, Hyoungchul;Kim, Daeyoung;Huh, Youngki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.31-38
    • /
    • 2019
  • The main purpose of this study is to analyze the impact of the cost estimates on the construction work in residential apartment housing facilities. The planning work of facility construction is roughly divided into five main tasks which are further broken down into the following: process plan (P1-P6), construction plan (C1-C5), environmental management plan (E1-E4), quality management plan (Q1-Q5) and the safety management plan (S1-S5). In this study these tasks were classified into 25 detailed planning duties and a statistical analysis was performed on each one to determine its impact on cost. Finally this study derives from major planning tasks for effective cost management through correlation between planning tasks, cost indicators and t-test.

하천기본계획은 사전재해영향성검토협의 대상이 아니며, 하천공사시행계획을 수립하여 시행하는 하천공사는 사전 환경성검토 대상이 아니다

  • Heo, Cheol
    • River and Culture
    • /
    • v.7 no.1
    • /
    • pp.102-105
    • /
    • 2011
  • 다음은 "법제업무운영규정" 제26조 및 "법제업무운영규정 시행규칙" 제22조에 의해 법제처에서 "하천기본계획이 사전재해영향성검토 대상인지?"에 대한 법령 유권해석(안건번호 2009-0335, 2009.11.13)과 "하천공사시행계획을 수립하여 시행하는 하천공사가 사전 환경성검토대상인지?"에 대한 법령 유권해석(안건번호 2009-0376,2009.12.24)의 내용이다.

  • PDF

자가용 전기설비-공사계획 신고수리시 주요 검토 사항

  • 김우인
    • Electric Engineers Magazine
    • /
    • v.187 no.3
    • /
    • pp.28-32
    • /
    • 1998
  • 자가용 전기설비에 대한 공사계획신고 수리업무가 한국전기안전 공사로 위탐됨에 따라 공사계획신고 서식이 대폭 간소화되었음에도 불구하고 기존 구청에 하던 관례대로 복잡한 서식으로 작성, 신고하거나 일부 도면 작성이 미흡한 사항에 대해 회원 여러분들이 알기 쉽고 편리하게 활용할 수 있도록 1,000kW 미만의 수용설비와 500kW 미만의 발전설비에 대한 공사계획신고서를 중심으로 주요 검토사항에 대한 내용을 게재한다.

  • PDF

A study of a plan for better construction process of pre-construction phase in general contractor (종합건설회사내 Pre-construction 단계에서의 업무흐름개선에 관한연구)

  • Park Jang-Seob;Song Jong-Seok;Shin Soo-Am;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.481-484
    • /
    • 2003
  • Recently, the importance of Pre-construction is gradually increasing in construction business. In addition to increasing greatness, Pre-construction affect to success or failure of projects. However, current domestic construction business doesn't constitute exact concepts and systems, and there are a lot of problems such as disorganize management of construction because most of Pre-construction depends on supervisors' experiences. Therefore, according as doing this study, We are going to analyze the tendency of Pre-construction step and bring up designed operation systems between departments in construction company. So we can expect to develop efficiency by excluding unnecessary operation and formulating more improved operation process.

  • PDF

Identifying Construction Engineering Tasks at the Design Phase for Enhancing Constructability in High-rise Building Construction - Focused on Temporary Work - (고층 건축공사의 시공성 향상을 위한 설계단계의 시공엔지니어링 업무 도출 - 가설공사를 중심으로 -)

  • Lee, Jin-Woong;Cho, Kyu-Man;Kim, Tae-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.5
    • /
    • pp.453-463
    • /
    • 2017
  • Due to the increase in the size of buildings and scale, the importance of construction engineering that reflects the constructability from the design stage of the project is increasing. Especially, engineering efforts related to facilities, equipment and construction methods for temporary work at the design stage can significantly contribute to improvement of constructability and project performance. The purpose of this study is to derive construction engineering tasks on temporary work at the design phase of the high-rise building projects. 27 preliminary tasks were firstly investigated through literature review and experts' group interview, and the necessity and importance analysis of each tasks were then performed based on questionnaire survey. Most of the tasks related to plans on structural framework and lifting equipment were analyzed as relatively more important ones. Lastly, 21 engineering tasks, which are classified into 5 factors, were proposed through factor analysis. The factors were determined as 1) structural framework, measurement and circulation, 2) lifting equipment and pumping, 3) space zoning, 4) water supply, 5) temporary facility, electric power supply and lighting. The results of this study can be used as basic data for establishing efficient work process of construction engineering on temporary work at the design phase.

전력플랜트 건설의 최신기술동향

  • KOREA ELECTRIC ASSOCIATION KOREA ELECTRIC ASSOCIATION
    • JOURNAL OF ELECTRICAL WORLD
    • /
    • s.310
    • /
    • pp.67-72
    • /
    • 2002
  • 미쓰비시(삼릉)전기 플랜트건설총괄부의 전력플랜트 건설공사는 수력$\cdot$화력플랜트 및 변전설비를 대상으로 하고 있으며, 수차$\cdot$수차발전기$\cdot$가스절연개폐장치(이하 ''GIS''라 한다), 변압기, 배전반 및 관련 제어기기 등의 설치 및 기기간의 배선공사 설계$\cdot$시공을 담당하고 있다. 최근의 전력플랜트를 둘러싼 일본의 시장환경은 신설 플랜트는 감소하고 갱신$\cdot$기기개수(개조, 수선) 공사의 비율이 커지고 있으며, 신설$\cdot$개보수 공사를 불문하고 공사품질의 유지와 공사비 저감을 위한 공법$\cdot$작업의 개선과 설계$\cdot$계획 업무의 합리화를 추진하여 왔다. (1) 기자재 개발에 의한 공법$\cdot$작업 개선 대형수력발전기의 로터조립용 다브테일키 박아놓기(타입)장치, 스테이터코일 분해(갱신)용 코일 엔드절단 및 코일뽑기공구, 터빈발전기 센터링용 유압잭, GIS 설치용 작업용발판을 개발하여 적용함으로써 공법 개선과 작업효율의 향상을 실현하였다. (2) 공사계획 방법의 개선 변전플랜트에서의 공기단축을 목적으로 하는 현지 설치 최적공정 책정방법의 개발$\cdot$적용, 또한 화력플랜트에서의 공사물량의 저감과 설계작업의 효율 향상을 목적으로 하는 케이블 배선 설계$\cdot$계획 방법의 개발 및 적용으로 설계업무의 개선, 공사비 저감을 도모하였다.

  • PDF

Earned Value based Construction Project Control System (EV기반 공사관리시스템 기능의 비교분석 연구)

  • Lee Yoo-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.168-174
    • /
    • 2004
  • Project plan and control is a highly skilled task which is vital for business success, and Project control systems are important for successful project execution. To support construction process management effectively, an integrated cost and schedule control function is required to collect quality data in a timely manner and to provide quality historical data for future planning of new projects. In Korea construction industry, the development and implementation cases of a project control system which to efficiently support construction project planning and controlling processes, have been increased to ensure a project success and the profitability of a construction company. To contribute to improving practical effectiveness of a project control system, the paper reviewed and analyzed the current trends and functional features of current project control systems. And it also described the pending issues and their solutions faced on previous project control systems.

A Study on the Methology of u-City Construction Audit (u-City감리기준 개선에 관한 연구)

  • Choe, Sang-Hyun
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2009.11a
    • /
    • pp.202-206
    • /
    • 2009
  • u-City사업은 완성까지 5년 이상이 소요되는 대형 장기사업으로, 정보시스템 개발 및 정보통신공사가 동시에 이루어지는 복합공종 사업이다. 이러한 대규모 사업을 차질없이 수행하기 위해 u-City사업에는 감리도 동시에 수행된다. 그러나 u-City감리는 아직 단일화된 감리기준이 없어 정보시스템 감리기준 및 정보통신공사감리 업무수행지침이 각각 적용되고 있으며, 이로 인해 감리 현장에서는 통일된 일정계획 수립이 어렵고, 업무 분장이 불명확하여 감리대상 일부가 누락되는 경우도 발생한다. 본 논문에서는 정보시스템 감리기준 및 정보통신공사감리 업무수행지침으로 이원화된 감리기준으로 인해 발생되는 문제점들을 살펴보고 이의 개선방향을 제시하였다.