• Title/Summary/Keyword: 공동주택 관리비

Search Result 140, Processing Time 0.029 seconds

A Study on the Prediction of Initial Sales Rate on Apartment Housing Projects (민간 아파트 사업의 초기계약률 예측에 관한 연구)

  • Lee, Seongsoo;Kim, Leeyoung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.3-11
    • /
    • 2015
  • Apartment developers consider the initial sales rate as an important indicator for their success of apartment development projects. They tried to achieve a secure level of initial sales rate. In spite of its importance, there is little research on the initial sales rate because of the difficulties in gathering proper data for analysis. This study, however, collects the data in initial sales rates in Su-won from various sources such as construction companies, marketing companies, sales companies and so on. By using this rare data, this study analyses the initial contract rate of apartment and estimates the initial contract rate by sales price. The result of this study shows that important of land area ratio, brand, and distance to park. It is expected that the proposed model will be used for apartment developers in sales planning phase.

Economical Analysis of the PV-linked Residential ESS using HOMER in Korea (HOMER를 이용한 PV 연계 가정용 ESS의 경제성 분석)

  • Eum, Ji-Young;Kim, Yong-Ki
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.2
    • /
    • pp.36-42
    • /
    • 2019
  • Europe and North America are paying attention to residential ESS(Energy Storage System) that can manage energy efficiently. The ESS is a system that stores and manages the electric power by charging and discharging the battery. The ESS is generally used in conjunction with photovoltaic systems. The ESS supplies the load of the power generation time and stores the remaining PV power to supply the load at the non-power generation time. However, due to the high price of residential ESS, low electric rates and increasing block rates, there is no market of residential ESS in Korea. This paper reviews the price condition and the capacity for applying PV and residential ESS to household of apartments using HOMER in Korea.

A Feasibility Study on Acquisition System of the Urban Parks under the Special Use Permit - Focused on the Neighbourhood Parks Unexecuted in Long-term in Suwon City - (도시공원에서의 개발행위 특례 적용을 위한 사업수지분석 연구 - 수원시 장기미집행 근린공원을 중심으로 -)

  • Kim, Sung-Yong;Lee, Chang-Soo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.38 no.4
    • /
    • pp.54-63
    • /
    • 2010
  • The recently-introduced Special Use Permit system is an exceptional approval system for private park developers to develop unexecuted urban park sites into urban parks with the implementation of profit-generating businesses within the boundary of preserving the original function of the park under an agreement with local authorities. This thesis studies the application of this system. This is a feasibility study of cases that have contributed to the acceptance of intended park sites by developing some parts of park sites as public housing, focused on unexecuted urban park areas for the long term in Suwon City based on the Special Use Permit, and creating other sites as park area. First, it has been judged that realization of business is possible at 300 percents of the floor area ratio in case of flatland neighborhood park which has high appraised land values. It is judged that realization of business is possible within a 10 percents size of private land at 200 percents of the floor area ratio in case of woodland and waterside neighborhood parks that have low appraised land values on the outskirts of the city. Second, through working expenses combining compensation and money for park construction, a balance of business profit can be understood within about 50 percents of total expenditures. Because the public contribution ratio by the Special Use Permit can be presumed as about 50 percents of total expenditures, it implies that windfall profits by the Special Use Permit can be adequately collected.

A Study on the Development of the Cash-Flow Forecasting Model in Apartment Business factoring tn Housing Payment Collection Pattern and Payment Condition for Construction Expences (분양대금 납부패턴과 공사대금 지급방식 변화를 고려한 공동주택사업의 현금흐름 예측모델 개발에 관한 연구)

  • Kim Soon-Young;Kim Kyoon-Tai;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.353-358
    • /
    • 2001
  • Since the financial crisis broke out, liquidity has become the critical issue in housing construction industry. In order to secure liquidity, it is prerequisite to precisely forecast cash flow. However, construction companies have failed to come up with a systematic process to manage and forecast cash flow. Until now, companies have solely relied on the prediction of profits and losses, which is carried out as they review business feasibility. To obtain more accurate cash flow forecast model, practical pattern of payments should be taken into account. In this theory, basic model that analyzes practical housing payment collection pattern resulting from prepayments and arrears is described. This model is to complement conventional cash flow forecast scheme in the phase of business feasibility review. Analysis result on final losses in cash that occur as a result of prepayment and arrears is considered in this model. Additionally, in the estimation of construction cost in the phase of business feasibility review, real construction prices instead of official prices are applied to enhance accuracy of cash outflow forecast. The proportion of payment made by a bill and changes in payment date caused by rescheduling of a bill are also factored in to estimate cash outflow. This model would contribute to achieving accurate cash flow forecast that better reflect real situation and to enhancing efficiency in capital management by giving a clear picture with regard to the demand and supply timing of capital.

  • PDF

Economic Evaluation of Eco-friendly Demolition Work and Case study in Remodeling Project (친환경 리모델링 철거공사의 경제성 평가 및 사례적용)

  • Kim, Yoon-Duk;Kim, Ki-Hyun;Cha, Hee-Sung;Kim, Kyung-Rai;Shin, Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.45-53
    • /
    • 2010
  • When increasing quantity of construction wastes, how to deal with construction wastes and environmental problems relating to disposal of construction wastes are discussed as social issues, treatment of construction waste and subsidiary issues are raised as important problems. The demolition work produce construction wastes most in construction industry. Various researches on eco-friendly treatment of construction wastes, recycling rates and recycled materials were conducted aspect of sustainability in developed countries, however, domestic remodeling projects were performed demolition work with first-demolition and second-classification method which emphasize productivity focused on efficiency. It caused not only environmental problems, but also economical problems such as increasing disposal cost of construction wastes. Solving these problems, the previous study, suggested the process model of eco-friendly demolition work to recycle materials. This paper applied eco-friendly remodeling process to practical projects and economic feasibility on eco-friendly remodeling process. Moreover these results expect to contribute the revitalization of eco-friendly demolition work in remodeling projects.

A Study on Estimating Normal Project Duration of Apartment Remodeling Project (공동주택 리모델링공사 표준공기 설정에 관한 연구)

  • Yoon, Jongsik;Yu, Ilhan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.12-20
    • /
    • 2017
  • The biggest reason to prefer the remodeling is a relatively short period of time (5~6 years) compared to the reconstruction work that takes 8~9 years. In addition, from the perspective that the period of temporary residence is usually 24 months, the necessity of shortening is greater. Also, since the remodeling construction period is approximately 28~35 months on average, the strategies and efforts are needed to make up for the shortening the remodeling construction period. For these reasons, this paper is to develop an estimating model for normal project duration of apartment remodeling project. This model is reflected in the remodeling properties thorugh difference analysis of the new apartment construction project. Demolition works, reinforcement works, extension works are different, so this paper newly defines these construction work's duration in normal project duraion of remodeling. Case study and experts interviews are used to validate normal project duration. This model can be used to calculate rough construction period each alternatives, and will help a strategic decision making among the stakeholders.

Financial Analysis Model Development by Applying Optimization Method in Residential Officetel (최적화 기법을 활용한 주거용 오피스텔 수지분석 모델 개발)

  • Jang, Jun-Ho;Ha, Sun-Geun;Son, Ki-Young;Son, Seung-Hyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.1
    • /
    • pp.67-76
    • /
    • 2019
  • The domestic construction industry is changing according to its preference for demand and supply along with urbanization and economic development. Accordingly, initial risk assessments is more important than before. In particular, demand for lease-based investment products such as commercial and office buildings has surged as a substitute for financial products due to low interest rates of banks. Therefore, the objective is to suggest a basic study on financial analysis model development by applying optimization method in residential officetel. To achieve the objective, first, the previous studies are investigated. Second, the causal loop diagram is structured based on the collected data. Third, the system dynamics method is used to develop cost-income simulation and optimization model sequentially. Finally, the developed model was verifed through analyzing a case project. In the future, the proposed model can be helpful whether or not conduct execution of an officetel development project to the decision makers.

Fabrication and Constructability of a General-Purpose Manufactured Precast Concrete Double Wall (범용 생산설비를 활용한 PC 더블월 제작 및 시공성에 관한 연구)

  • Park, Soon-Jeon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.4
    • /
    • pp.465-476
    • /
    • 2023
  • This study introduces the development of a precast concrete double-wall, applicable to basement construction in apartment buildings. Unlike traditional precast concrete double walls, the developed double-wall doesn't require specialized manufacturing equipment such as a lathe. The constructability of these advanced technologies was validated through a full-scale mock-up test using the precast concrete double wall. The test specimens were constructed to represent a structural wall with a thickness of 250mm. It was observed that the quality of the in-situ concrete, filled between two single panels of 110mm thickness each, was excellent. The construction efficiency of the developed double-wall system for basement construction in an apartment building was also examined. Expert interviews about installation times of precast concrete elements were conducted to evaluate the speed of the basement floor's installation. The results showed that installation of precast concrete elements, including the proposed double walls, could be completed within 20 to 29 days for a basement in an apartment building. This indicates a three-fold increase in construction efficiency compared to traditional methods relying on in-situ casting.

Management Strategy of Indoor Hazardous Chemicals (실내.외 통합 모델링 및 인체 위해성 평가를 통한 실내 유해화학물질의 관리 전략)

  • Shin, Yong-Seung;Lim, Hye-Sook
    • Journal of Environmental Policy
    • /
    • v.7 no.2
    • /
    • pp.67-90
    • /
    • 2008
  • The purpose of this study is to develop indoor air quality management strategies regarding indoor air pollutants while considering various factors affecting indoor pollutants concentration. The Integrated Indoor Air Quality model(IIAQ) developed by Seoul National University is used for this study. The IIAQ model is a tool that can provide an integrated view to indoor environmental pollution by simulating suggested scenarios. The results of the modeling are used to assess health risk. The concentrations that are used for the risk characterization are weighted concentrations based on the period of time in each place and existing Indoor Air Quality(IAQ) standards. The estimated concentration of toluene and formaldehyde for 10 years through the IIAQ model was 207.3 $ug/m^3$ and 36.4 $ug/m^3$ in indoors, and 55.9 $ug/m^3$ and 8.62 $ug/m^3$ in outdoors. These concentrations are lower than the existing IAQ standards. The estimated carcinogenic risk of formaldehyde is up to 1.05E-03 for the adult male group and exceeds 1E-06 for all receptor groups. This value means that cancer could affect one person out of 1000. The estimated non-carcinogenic risk of toluene was lower than 1, which means that there was no serious non- carcinogenic risk. The result of modeling shows that using low emitting indoor sources is the most effective strategy for both formaldehyde and toluene. This risk assessment suggests that the total exposure levels of existing IAQ standards may cause serious carcinogenic risk. In order to avoid uncontrolled risk, it is suggested that the current IAQ standards should be adjusted by taking into account the total amount of exposure from all exposure pathways from indoor and outdoor sources.

  • PDF

A Study of Establishing the Plan of Lodging for the Workers of Gaesung Industrial Complex (개성공단 근로자 기숙사 건립 계획 연구)

  • Choi, Sang-Hee;Kim, Doo-Hwan;Kim, Sang-Yeon;Choi, Eun-Hee
    • Land and Housing Review
    • /
    • v.6 no.2
    • /
    • pp.67-77
    • /
    • 2015
  • Now that it is the current situation that the smooth supply and demand are necessary for 2nd phase of beginning construction and stable development of Gaesung Industrial Complex, this study was willing to offer the planning criteria and model to establish the lodging for the workers in Gaesung Industrial Complex based on the agreement that both South and North Korea agreed in 2007. Regarding the plan, its standard and the alternative were reviewed considering welfare of workers, economic efficiency, technical validity, possibility of agreement and long-term development. The exclusive area per capita was calculated through Labor Standards Act of Korea and status survey of lodging for the workers provided to border line area between China and North Korea and the economic alternative based on one room for 6 persons with the public restroom was compared with that of development type based on one room for 4 persons with indoor restroom. Especially regarding the proposed site, the area with the optimized position was set by considering gradient, accessibility and convenience of development out of the area of Dongchang-ri where was agreed already and the priority of the proposed site that can keep the existing building site and provide was offered. The necessary period for whole construction was set as approximately 36 months. Regarding construction method, RC Rahmen method was selected as the optimized alternative considering the workmanship of manpower of North Korea and conditions of supply and demand of materials and cluster-type vehicle allocation plan based on 4~6 units considering the efficiency of supplying service facilities and convenient facilities along the simultaneous accommodation of 15,000 people was offered. It was analyzed that total business expenses of approximately 80~100 billion Korean Won would required though there were the difference for each alternative in the charged rental way that the development business owner develops by lending the inter-Korea Cooperation Fund and withdraws the rent by the benefit principle. The possibility of withdrawing the rent was analyzed assuming that the period of withdrawing the investment is 30 years. Especially for the operation management after moving, the establishment of the committee of operating the lodging for the workers of Gaesung Industrial Complex (tentative name) was offered with the dualized governance that the constructor takes charge of operational management, collecting fees and management of infrastructure and human resource management is delegated to North Korea.