• Title/Summary/Keyword: 공동주택건설사업

Search Result 146, Processing Time 0.025 seconds

A Case Study of maintenance cost estimation for military official residence building in BTL project (BTL사업 군관사 건축물의 유지관리비용 산정에 관한 연구)

  • Kwon, Bum-Joon;Kim, Hyun-Kyu;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.851-854
    • /
    • 2008
  • The purpose of this study is to predict the maintenance cost for military official residence building projects which were ordered for five military official residence building. In conducting this study, the adapted research method was to classify initial investment for each construction of the military official residence building and to estimate maintenance cost. This study was analyzed by studying the estimation of maintenance cost in the apartments and present value analysis method. The results of this research are as follows. 1) The initial investments was analyzed that the total construction cost would be 1,683,286 thousand won ; construction(79%), civil(3%), landscaping(2%), MEP(5%), heating and hot water supply system(5%), and water supply and sanitary system(6%) per square meter. 2) Based on the result analyzed above, the maintenance cost of the apartments was analyzed and then estimated the proper maintenance cost by using maintenance cost estimation method and present a value analysis method.

  • PDF

Prediction Model Development of Defect Repair Cost for Apartment House according to Performance Data (실적 자료에 의한 공동주택 하자보수비용 예측모형 개발 방안)

  • Kim, Byung-Ok;Je, Yeong-Deuk;Song, Ho-San;Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.5
    • /
    • pp.459-467
    • /
    • 2011
  • The work of constructing apartment housing involves various fields of industry that are linked to each other, and is based on a design document prepared by multiple technicians and architects. Consequently, design errors, material flaws or faulty construction works can cause defects, which sometimes overlap with each other. Construction companies should repair any defects found in a completed building within a specified period of time, and to do this, should establish a business plan by efficiently predicting the cost of defect repair. As it is very difficult for companies to accurately predict the occurrence of defects, historical performance data is used as a base. For domestic apartment housing units, data on the cost of defect repair is insufficient, so there are hardly any methods that can be used to make precise predictions. Therefore, the intent of this study is to develop a model that can predict the cost of defect repair by supply type and area, based on historical performance data with ten years worth of post-completion.

Comparison Analysis of Environmental Performance between Reconstruction and Remodeling Alternatives for Aged - Focused on CO2 Emissions Analysis - (공동주택 재건축과 리모델링의 친환경성 비교분석 - CO2 배출량 분석을 중심으로 -)

  • Kim, Chibaek;Shin, Dongwoo;Han, Juyeon;Hwang, Youngkyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.87-100
    • /
    • 2014
  • Environmental problems and the shortage of natural resources are currently gathering more attention in Korea and international countries. With these problems, it is reported that most current domestic buildings are emitting approximately 138 million tons of greenhouse gas. According to a recent report from the investigation of Korean housing population, the total number of households is approximately 12.9 millions, and the apartments that were built more than 15 years ago amounted to 3.1 millions. This shows that the rates of old apartment housings are increasing. Therefore, it is necessary to consider the deteriorated facilities and environmental improvement. Also, the construction industry is benefited by improving these housings which may need either remodeling or reconstruction. Environmental friendly buildings are a rising consideration for remodeling and reconstruction projects; it helps to determine many business matters in construction. The main purpose of this research is to improve environmental condition in apartments with comparison analysis between remodeling and reconstruction alternatives. This research is focused on characteristics of remodeling and reconstruction and it sets up the same condition with each level in order to evaluate the value of environmental friendliness and analyze its definition. The result of this research provides a unique emitting rate at a novel framework and this will cause the reduction of $CO_2$. It is analyzed that the remodeling construction can reduce the great amount of $CO_2$. Therefore, it will be a good decision guideline in selecting the most eco-friendly alternative to improve environment for building construction. Although reconstruction is a popular alternative nowadays in Korea, this research can provide a reason why decision makers should put more emphasis on remodeling as an environment-friendly alternative.

Development of Estimation System for Housing Remodeling Cost through Influence Analysis by Design Elements (설계요소별 영향분석을 통한 공동주택 리모델링 공사비개산견적 산출 시스템 개발)

  • Kim, Jun;Cha, Heesung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.6
    • /
    • pp.65-78
    • /
    • 2018
  • In As urban apartment are aging, the necessity of reconstruction or remodeling to extend the life of buildings is increasing. In such a case, a co-housing association is formed to implement decisions on reconstruction or remodeling projects. At this time, the most important thing for the co-housing association is the business feasibility based on the input of the construction cost.In the case of reconstruction, it is possible to estimate the construction cost by using the accumulated construction cost data, and then evaluate the feasibility using the construction cost. However, in case of remodeling, it is difficult to calculate the accurate construction cost because the number of accumulated construction cost data is small. In addition, non-specialist clients often require estimates of various design factors, often negatively impacting the accuracy of estimates and the duration of estimates. Therefore, in this study, proposed method to reflect the opinion of the owner who is a non-expert, as a design element, and a method of calculating the expected construction cost according to the design element, and constructed this system so that it can be easily used by the non-specialist owner. In order to clearly reflect the requirements of the non-specialist owner in the estimates, extracts the design elements from the existing remodeling cases, classify them, and suggest a plan for the client to choose. In order to reflect the design factors to the estimates, the existing apartment house remodeling cases were investigated and the design factors were extracted to have a large effect on the construction cost. Finally, developed system based on MS Excel so that the above contents can be easily used by a non-specialist client. In order to verify the accuracy of the proposed estimate in this study, verified the accuracy of 80% of the results by substituting the case of remodeling quotations and obtained a positive result from the questionnaire survey to examine the ease of use of the non-specialist customer. In this study, propose an estimate estimation method using four cases. If the remodeling cases are accumulated continuously, the expected effect of this study will be higher.

Improving the Performance of a Custom-built Apartment Efficiently (맞춤형 아파트의 효율적인 사업 수행에 관한 연구)

  • Han Song-Yi;Choi Jae-Kyu;Kim Kyung-Sook;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.96-105
    • /
    • 2003
  • Technical improvement and the growth of the Internet environment make the market segmental of the manufacturing industry. These social trends have had an effect on the housing market, and the housing market changed from the supplier-oriented to the consumer-oriented. In recent years the occupants' needs for the apartment is diversified and complicated. But the existing mass housing supply method has many problems. It couldn't satisfy the dwellers' various needs and couldn't reflect overall expected life span either. In order to realize the sustainable building & environment, the research for the open housing system is actively performed. Finally the custom-built apartment which imported the concept of the open housing is constructed. But after running the custom-built apartment, several problems are revealed. Therefore the purpose of this study is to analyze the problems and then suggest the improving methods for a custom-built apartment.

Constitution of Work Process for Apartment Renovation Project in Design Phase (공동주택 리모델링 설계단계에서의 사업수행 프로세스 구축)

  • Kwon, Won;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.167-175
    • /
    • 2007
  • A renovation project of apartment housing is generally divided into four stages: Project inquiry stage, planning and feasibility stage, design stage and construction stage. Currently, procedure and managerial technique for a remodeling project has not been systematically established so that many companies have difficulty in doing their business. In particular, the design stage in participant which a project managers, designers, residents and engineers is more complicate than the other stages in terms of roles and working procedure. The design documents can be found trial and error if it is not well managed. The insufficient design caused by lack of ability to efficiently utilize information obtained during the stage and inappropriate decision-making not only results in diverse problems in the construction stage but also makes people suspect satisfaction and reliability on the remodeling improvements. Therefore the design stage is very significant issue on the renovation project. As the consequence, the design stage of a remodeling project is so important that it should be carefully managed, and composite understanding of the process to be executed. To do this, we provide roles and responsibility of each participant in the design stage and analyze the process where information is utilized in design stage. The information is analyzed in terms of input, tool and output.

Design Guideline Corresponding to Housing Performance Grade Indication System (주택성능등급 표시제도에 대응한 설계 가이드라인)

  • Park, Hyun-Su;Ko, Kwang-Il;Lee, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.396-401
    • /
    • 2006
  • A "Housing Performance Grade Indication System" that is bound to present the grade in housing designs has been executed since January 2006 in order to build sustainable housing and supply high quality housing. Thus, users are able to select their housing based on certain comparisons in housing performances, and providers can be exactly evaluated using precise standards according to the execution of this system. The objective of this study is to propose a guideline in designs according to the grade of housing as a reasonable decision making tool in order to obtain a high grade in housing performance grades under the execution of the "Housing Performance Grade Indication System". In order to perform this goal, this study examines the performance evaluation item and evaluation guidelines in the "Housing Performance Grade Indication System" and analyzes relative systems and guidelines executed in the present time to investigate certain relativeness for this system. The housing performance evaluation item can be classified four different categories according to the characteristics of evaluation guidelines. Then, the system of a design guideline is configured to propose a reasonable design guideline according to the grade of housing performances. It is evident that the design guideline proposed in this paper will support the reasonable decision making to obtain a high grade in housing performances for the designer and constructor in the process of a housing project.

  • PDF

Development of Historical Data Selection Model Using Non-parametric test in Public Sector - focused on Reinforced Concrete Works of Multi-housing Projects - (비모수 검정기반 공공부문 실적단가 선정모델 개발 -공동주택 철근콘크리트 공종을 중심으로-)

  • Lee, Hyun-Ki;Jeon, Jae-Yong;Park, Sung-Chul;Hong, Tae-Hoon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.87-95
    • /
    • 2008
  • The government wants to apply the construction cost estimating method based on historical data published in the first six months of 2004. Construction companies, however, require the proposed cost estimation model, to be improved which makes it difficult to predict a reasonable construction costs. This paper presents an improved historical data selection model after analyzing the problem of previous method throughout comparing contracted unit prices of reinforced concrete works selected by the previous model to market prices. The model which can select more feasible data would assist participates such as general contractors and sub-contractors to earn a proper profits.

A Verification of the Project Manager-Oriented Model for Apartment Construction in the Public Sector (공공 아파트건설의 PMr형 사업관리모델에 대한 실증적 사레검증)

  • Sohn Jeong-Rak;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.191-202
    • /
    • 2004
  • In this study, the project manager-oriented organization model has been verified by analysing it with forming a clear definition of detailed unitary duty entity to develop current non-efficient CM system constituted by functional organization with the decentralized responsibility and apply the model As a result from verification that the model provides valid solutions by comparing it with the existing, the model is better than the existing in cost savings, target profit sales rate, total rate of new on sales. Moreover, various activities in cost savings and cases where improvement is feasible are executed. However, the model caused some problems in organizational operation, project management and in division of duties so this study proposed improving management method

The Study on the System to Estimate the Cost by Using Regression in the Early Stage of the Project (공사 초기단계에서의 회귀분석을 이용한 최종공사비(EAC) 추정 방법)

  • Lee, Youn-Mi;Lee, Man-Hee;Lee, Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.274-277
    • /
    • 2006
  • The EAC(Estimate at Completion) among existing methods, which estimate cost and time effectively, help managers anticipate changeable several results at the point of $15{\sim}30%$ in the project progress. However, this method may cause such some problems as not to consider the periodically changing circumstances caused by construction risks or uncertainties which can affect the cost and time in the project, and to regard collected and accumulated data only as a single value when predicting the results on the progress. Accordingly, it is very difficult to accept the even small range of variability based on the anticipation of EAC. Consequently, the study focuses on the possibility methodology to anticipate time and cost accurately on the way to utilize EVMS(Earned Value Management System), and also suggest the way to perform the right estimation of EAC as considering various risks and uncertainties in construction projects.

  • PDF