• Title/Summary/Keyword: 공기-비용 상관관계

Search Result 12, Processing Time 0.021 seconds

Direction of Selecting the Alternative considered Correlation between Building Systems in Remodeling Design Process (리모델링 설계단계에서 건축시스템 상관관계를 고려한 대안선정 방안)

  • Lee Dong-Jun;Park Chan-Gil;Park Sang-Jun;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.415-418
    • /
    • 2002
  • As Remodeling is proceed in the limited condition that is utilization of existing resource, the selection of remodeling objects and scope are affected by the correlation of building systems. Unexpected problems have occurred in construction phase by lack of the consideration about correlation of building systems; increasing of cost, delaying of schedule etc. Therefore, this research suggests the Building System Correlation Diagram Model and the direction of cost estimation .for selecting alternative reasonably in remodeling design process.

  • PDF

A method of Calculating Optimal Duration and Cost Using Monte Carlo Simulation and Linear Programming (몬테카를로 시뮬레이션과 선형계획법을 이용한 최적의 일정 및 비용 산정방법)

  • Kim Yong-Deuk;Lee Young-Dae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.210-215
    • /
    • 2004
  • In can occur to many problems on progressing step without close scope definition, interrelation definition between activities, resource plan, and schedule plan on planning step. But it have not closely defined performance system on planning step because of many constraints of domestic construction industry. Therefore this paper intends to discuss a method of calculating optimal cost and duration using Linear Programming that solves maximing or minimizing problems among decision making methodology and Monte Carlo Simulation that decreases to probability errors. With outcoms applying Linear programming and Monte Carlo Simulation for calculating optimal cost and duration, follow as : With outcomes applying Monte Carlo Simulation, it could calculate reliable estimator about project duration through removing various constraints. With outcomes applying Linear programming, it could calculate optimal value about project cost through defining various variables and constraints on many activities.

  • PDF

Prediction of Final Construction Cost and Duration by Forecasting the Slopes of Cost and Time for Each Stage (공사 진행단계별 기울기 추정을 통한 최종 공사비 및 공기 예측)

  • Jin, Eui-Jae;Kwak, Soo-Nam;Kim, Du-Yon;Kim, Hyoung-Kwan;Han, Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.137-142
    • /
    • 2006
  • Cost and duration is important factors which directly affect profit therefore must be forecasted correctly to accomplish success of projects. So construction company uses EVMS(Earned Value Management System) to forecast final cost and duration. But previous forecasting model has low accuracy because of its linear forecasting method and can't reflect characteristic of company and project and changes as each progress. This paper presents cost and duration forecasting model using the slope prediction of cost and duration as each progress to reflect the various characteristics of construction industry. EVMS data of 23 road construction projects was used to make up regression analysis equation of slope forecasting model.

  • PDF

Development of Time-Cost Trade-Off model Based on Emergency Construction Work Scenario (돌관공사 시나리오 기반 공기-비용 최적화 모델 개발)

  • Lee, Sihyun;Lee, Seounghyun;Son, Jaeho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.43-51
    • /
    • 2016
  • Recently, the cost of construction projects has escalated due to a significant increase in size and complexity. Many construction projects have failed to meet their originally intended project deadline due to various factors such as weather, labor supply, equipment, procurement, accidents, etc. Consequently, emergency construction work scenario has to be implemented in order to shorten the duration and satisfy the original estimated schedule. However, many critical decisions in emergency scenario rely solely on the experience of a construction manager. Thus, this paper proposes TCTO optimization model to decide the most effective alternative out of various working scenarios which are generated by the combination of work group and work time. The developed TCTO model provides the optimum schedule that satisfies the practical constraints. Future research could involve the integration of resource leveling with the proposed model. This would make the model more versatile.

동북 아시아 천문대 부지 탐사

  • 정현수
    • Bulletin of the Korean Space Science Society
    • /
    • 1993.10a
    • /
    • pp.24-24
    • /
    • 1993
  • 1991년 한국에서 열렸던 밀리미터파 및 적외선천문학에 관한 동북아시아지역 Workshop에서의 합의에 근거하여, 장래의 동북아시아천문대와 동북아시아 지역에 있어서의 당면적인 국제협력관계를 만들어가기 위하여, 중국오지에서의 지상관측을 위한 1차 부지탐사를 1993년 9월에 대만, 일본, 중국, 한국의 4개국 합동으로 추진하였다. 천문학은 본래 지극히 국제적인 과학이며, 따라서 국제협력없이는 앞으로 나아가지 않는다. 그러나, 과거의 여러 사정에 의해 현재 정상적인 협력관계에 놓여있지 않는 대만, 일본, 중국, 한국이 동북아시아 제국 공통의 최신의 관측소를 가지고서는 상호간에 밀접하게 천문학연구를 진행해 나가기 위한 하나의 꿈이 곧 동북아시아천문대라고 할 수 있다. 동북아시아천문대는 이 지역에서의 천문학의 공통적인 활동장소를 만들어나가는 것을 지향하고 있다. 즉, 여러 나라의 연구자들끼리 자연적으로 밀접한 교류를 행해 나가는 가운데, 천문학을 발전시켜나가는 센터를 만들고자 하는 것이다. 그러므로 여기서 계획하고 있는 부지탐사는 이러한 꿈을 실현해 나가기 위한 첫걸음이라고 할 수 있다. 현재 가시광, 적외선, 밀리미터파, 서브밀리미터파를 막론하고, 지상관측에 있어서 요구되는 조건은 모두 같다고 하겠다. 날씨가 좋고, 건조하여 수증기양이 적으며, 공기의 흔들림이 적고, 인간의 활동에 지장이 없을 정도의 높이와 교통편이 좋을 것 등을 들 수 있다. 그러므로 이번 1차부지탐사에서는 연간일조시간이 3000시간 이상에 달하는 후보지에 대한 대기의 종합적인 측정을 행하며, 아울러 가능하다면 적절한 장소에 소형의 적외선 및 서브밀리미터파의 망원경을 두는 공동계획을 구체화한다.ofile occurs along north-south direction there are a few peaks in most line profiles, and these indicate that there not multiple velocity components along the line of sight. Distributions of excitation temperah at and column density which were estimated from the excitation calculations show the existence of a small(IxEpc),hot(Tex> SOK) core which contains two tempegatlue peaks at -15" east and north of MDS. The column density of HCaN is (1-3):n1014cm-2. Column density at distant position from MD5 is larger than that in the (:entral region. We have deduced that this hot-core has a mass of 10sR1 which i:s about an order of magnitude larger those obtained by previous studies.previous studies.업순서들의 상관관계를 고려하여 보다 개선된 해를 구하기 위한 연구가 요구된다. 또한, 준비작업비용을 발생시키는 작업장의 작업순서결정에 대해서도 연구를 행하여, 보완작업비용과 준비비용을 고려한 GMMAL 작업순서문제를 해결하기 위한 연구가 수행되어야

  • PDF

A Study on the Correlation Analysis of Construction Period and Defect Repair Costs of Apartment Housing (공동주택 공사기간 및 하자보수비용의 상관관계 분석 연구)

  • Lee, Young-Jae;Cho, Dong-Hyun;Lee, Mi-Young;Park, Sang-Hun;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.48-49
    • /
    • 2019
  • The number of disputes over defects after completion of construction work in apartment buildings is increasing every year. In this situation, the prediction of reasonable defect repair costs is very important. In this paper, we are going to collect basic data for predicting defect repair costs through the correlation analysis of the construction period and defect repair cost of apartment houses. For this purpose, first of all, the construction period and defect repair cost of apartment houses were analyzed to analyze the construction period for each type of work, the construction period for each project type, and the construction period for each standard calculation. Next, the correlation between defect repair cost and the independent variables of the candidate was conducted. According to the analysis, the ratio of framing air, the ratio of finishing air, and the number of delay days showed strong correlation.

  • PDF

Process Optimization Method Based on Emergency Construction Work Scenario (돌관공사 시나리오 기반 공정관리 최적화 방안)

  • Lee, Si-Hyun;Lee, Seung-hak;Woo, Mi-Sun;Son, Jae-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.117-118
    • /
    • 2015
  • These days buildings have more possibilities to occur construction delay as many variables and risks are inherent in them due to the enlargement and complexity. When a project is delayed, it generates extra working expenses and this causes a dispute between the employer and the constructor. Most construction sites conduct emergency construction work to recover the delay of the project duration. When an emergency construction is carried out in the actual construction site, it's necessary to utilize and distribute the proper working groups based on the procedure of successor and predecessor. Many constructions, however, have been going only with more number of work forces and working time. This study suggests a process management optimization plan with an application of emergency construction scenario by using linear programing.

  • PDF

A study on composition and role of SLA(Service Level Agreement) -based on Incheon Airport (서비스수준협약의 구성요소 및 역할에 관한 연구 -인천공항을 중심으로)

  • Ye, Jeong-Beom;Park, Gwang-Hui
    • 한국항공운항학회:학술대회논문집
    • /
    • 2016.05a
    • /
    • pp.281-286
    • /
    • 2016
  • 국 내외 기업들이 새로운 경영기법으로 도입하고 있는 아웃소싱은 비용절감, 핵심 업무에 대한 집중, 생산성 제고 등의 장점으로 빠르게 확산되고 있다. 인천국제공항 역시 공기업 경영혁신과 내부요인 등으로 인해에 개항과 함께 아웃소싱을 도입하였으며, 2014년 3월 현재에는 43개 분야에 아웃소싱을 도입하여 운영하고 있다. 이처럼 아웃소싱 도입이 확산 되면서 성공적인 아웃소싱 관리에 대해 모색하게 되었고, 인천국제공항 역시 효율적인 관리를 위해 주로 IT 분야에서 적용하고 있는 서비스수준협약(Sercive Level Agreement, SLA)을 전 분야에 걸쳐 도입하게 된다. 인천국제공항은 서비스수준협약을 통해 서비스 수준에 영향을 미치는 복합적인 요인을 효율적으로 관리하고 지속적인 서비스 품질수준을 유지하고자 도입한 것이다. 그러나 대부분의 서비스수준협약이 IT 분야에만 집중되어 있어 아직까지는 비(非) IT 분야의 서비스수준협약 시행은 초기 단계이며 서비스수준협약 측정지표 선정에 관한 연구는 매우 부족한 상태이다. 본 연구에서는 현재 인천공항에서 운영 중인 서비스수준협약을 유사용역 그룹별로 구분하여 구성요소와 역할에 대해 파악하고자 하였으며 서비스수준협약 측정지표가 공항운영 효율성에 어떠한 영향을 미치는지 확인하고자 하였다. 연구결과 서비스수준협약 측정지표의 명확성, 적정성, 업무 통제 가능성은 과업운영의 효율성에 유의미한 것으로 나타났으며, 현재 인천공항에서 운영 중인 서비스수준협약 평가 결과에 대한 인식이 과업 운영의 효율성에도 유의미한 것으로 나타났다. 또한 현행 서비스수준협약 평가 결과에 따라 과업의 문제점이 반영되는지 여부와 과업운영의 효율성 간의 상관관계 분석결과 통계적으로 유의한 것으로 분석되고 있다.

  • PDF

Measurement and Discrimination Method for the Evaluation of Aero-Pulsation Noise Generated by the Turbocharger System (터보차저의 공기맥동음 평가를 위한 측정 및 판별법)

  • Kim, Jae-Heon;Lee, Jong-Kyu
    • The Journal of the Acoustical Society of Korea
    • /
    • v.26 no.7
    • /
    • pp.361-365
    • /
    • 2007
  • Aero-pulsation noise, generally caused by geometric asymmetry of a rotating device, is one of considerable sources of annoyance in passenger cars using the turbocharged diesel engine. Main source of this noise is the compressor wheel in the turbocharger system, and can be reduced by after-treatment devices such as silencers, but which may increase the manufacturing cost. More effective solution is to improve the geometric symmetry over all, or to control the quality of components by sorting out inferior ones. The latter is more simple and reasonable than the former in view of manufacturing. Thus, an appropriate discrimination method should be needed to evaluate aero-pulsation noise level at the production line. In this paper, we introduce the accurate method which can measure the noise level of aero-pulsation and also present its evaluation criteria. Besides verifying the reliability of a measurement system - a rig test system-, we analyze the correlation between the results from rig tests and those from vehicle tests. The gage R&R method is carried out to check the repeatability of measurements over 25 samples. From the result, we propose the standard specification which can discriminate inferior products from superior ones on the basis of aero-pulsation noise level.

Setting up Relationship between Pull-out Resistance of Helical Anchor and Rotational Penetration Torque for Methodology Development (헬리컬 앵커개발 및 적용을 위한 앵커의 회전 관입 토크와 인발저항력과의 상관관계 정립)

  • Kim, Nak-Kyeong;Kim, Young-Uk;Moon, Jun-Ho;Xin, Zhen-Hua;Gu, Kyo-Young
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.3
    • /
    • pp.661-667
    • /
    • 2016
  • This study evaluated the potential of methodology development of the helical type anchor for soft ground applications. The rotational penetration of the helix structure might make construction-steps easy without the soil spitting and reusable rods could reduce the material cost. Removal of the anchors would be simple as a construction, which can be named the removal anchor. The anchoring resistance after construction is strongly related to the number of helixes resulting in a concise design process. The investigation involved a chamber test with soft soils. In the test, a specially designed and fabricated helical anchor and torque-driver were used to obtain the maximum pull-out resistance of the anchor after rotational penetration. As a result of the tests, The rotational torque and pull-out resistance have a proportional relationship with the strength of the prepared soils. Within the range of the study, the torque of the anchor penetrating increased with increasing pull-out resistance.