• Title/Summary/Keyword: 공기지연 리스크

Search Result 18, Processing Time 0.031 seconds

Analysis of Potential Construction Risk Types in Formal Documents Using Text Mining (텍스트 마이닝을 통한 건설공사 공문 잠재적 리스크 유형 분석)

  • Eom, Sae Ho;Cha, Gichun;Park, Sun Kyu;Park, Seunghee;Park, Jongho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.1
    • /
    • pp.91-98
    • /
    • 2023
  • Since risks occurring in construction projects can have a significant impact on schedules and costs, there have been many studies on this topic. However, risk analysis is often limited to only certain construction situations,and experience-dependent decision-making is therefore mainly performed. Data-based analyses have only been partially applied to safety and contract documents. Therefore, in this study, cluster analysis and a Word2Vec algorithm were applied to formal documents that contain important elements for contractors or clients. An initial classification of document content into six types was performed through cluster analysis, and 157 occurrence types were subdivided through application of the Word2Vec algorithm. The derived terms were re-classified into five categories and reviewed as to whether the terms could develop into potential construction risk factors. Identifying potential construction risk factors will be helpful as basic data for process management in the construction industry.

A Study of Risk Management in Major Hospital Construction Projects (효율적인 리스크 관리방안에 관한 연구)

  • Kim Sang-Il;Lee Jae-Sub
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.242-245
    • /
    • 2003
  • Most engineering tasks require collaboration between many users in major hospital Construction Projects that have many risks. Loss of cost and change orders occurred in factors such as information exchange, misunderstandings, advanced Technology in hospital projects. Moreover, changes in context, costs, requirements, deadlines, etc. require negotiation of issues that may modify important project characteristics. Each part of the major hospital construction projects have been rapidly changed technology of equipments. Therefore it is a major challenge to make a high level of communication and to have mutual understanding. The objective of this paper is to reduce risks for the design process and construction process of hospital projects.

  • PDF

TBM risk management system considering predicted ground condition ahead of tunnel face: methodology development and application (막장전방 예측기법에 근거한 TBM 터널의 리스크 관리 시스템 개발 및 현장적용)

  • Chung, Heeyoung;Park, Jeongjun;Lee, Kang-Hyun;Park, Jinho;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.1
    • /
    • pp.1-12
    • /
    • 2016
  • When utilizing a Tunnel Boring Machine (TBM) for tunnelling work, unexpected ground conditions can be encountered that are not predicted in the design stage. These include fractured zones or mixed ground conditions that are likely to reduce the stability of TBM excavation, and result in considerable economic losses such as construction delays or increases in costs. Minimizing these potential risks during tunnel construction is therefore a crucial issue in any mechanized tunneling project. This paper proposed the potential risk events that may occur due to risky ground conditions. A resistivity survey is utilized to predict the risky ground conditions ahead of the tunnel face during construction. The potential risk events are then evaluated based on their occurrence probability and impact. A TBM risk management system that can suggest proper solution methods (measures) for potential risk events is also developed. Multi-Criterion Decision Making (MCDM) is utilized to determine the optimal solution method (optimal measure) to handle risk events. Lastly, an actual construction site, at which there was a risk event during Earth Pressure-Balance (EPB) Shield TBM construction, is analyzed to verify the efficacy of the proposed system.

An Analysis of The Critical Risk Factors in Failure Cases of Lifting Equipment Plans in High-rise Construction Project (초고층 프로젝트 양중 계획의 실패 유형별 핵심 리스크 요인 분석)

  • Kim, Nam-Gyun;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.73-83
    • /
    • 2013
  • Recently, not only around Korea but also other countries shows a pattern of arising high-rise building construction project which was delayed or aborted during global economic crises and recession. Although the market starts to stretch, It is getting competitive to win a contract in high-rise construction project between contractors due to lack of competitive advantage especially to Korea contractors. To get that, Korean contractors needs lifting equipment plan. But currently, they depend on the empirical methods and that cause schedule delay, not controlled cost management problem. Therefore, this research is to improve the accuracy of Lifting plan by analyzing the current issues of Lifting plan system and deducing the types of failures with planning factors, as well as analyzing the impact on schedule and cost control and safety management by each failure mode. Also, by analyzing detail risk factors per Lifting Equipment with FMEA, to infer the critical risk factor on high-rise construction project.

Analysis on Risk Factors of Reactor Containment Building Construction using Analytic Hierarchy Process (계층 분석 방법을 이용한 원자로 격납 건물 시공의 리스크 요인 분석)

  • Shin, Dae-Woong;Shin, Yoonseok;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.4
    • /
    • pp.425-431
    • /
    • 2015
  • Since the construction of Kori 1 was completed in 1978, the construction projects for nuclear power plant are increasingly expanded into domestic and foreign sites. However, some of construction sites of nuclear power plant have the problems of process delay and cost loss due to lack of ability of risk management. The construction of reactor containment building in nuclear power plant is especially dotted with many risk factors because it needs professional skills and large-scale resources due to long duration compared with different construction phase. Therefore, it needs the study that analyzes risk factors expected in construction of reactor containment building and suggests way of stable performance of projects. So, this study assesses risk factors of construction of reactor containment building. For the objectives, this study uses survey for group of minority specialists of 36 experts. The risks of 24 factors is classified by criterions of process, cost, safety, and quality and the results of assessment is analyzed by analytic hierarchy process. As the results, the importance and priority of risk factors classified by each criterion were calculated and the applicability of analytic hierarchy process was identified to analyze risk factors of nuclear power plant construction. These will be baseline data for risk management in construction phase of reactor containment building.

A Study on the Priority Analysis of Work Delay Factors in Steal-frame Work using FMEA (FMEA를 활용한 철골공사 작업지연요인의 중요도에 관한 연구)

  • Lee, Hyun-Chul;Lee, Jae-Hong;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.91-101
    • /
    • 2009
  • The factors of uncertainty such as work delay could cause many problems, for example, increase of construction cost and terms of work, and the deterioration of quality. Because of these, the uncertainty risk is regarded as an important management factor to obtain the success of construction project. So, the systematic management plan about the uncertainty factors is needed because it plays an important role in the completion of entire project. And also analysis of some factors which can cause the work delay can be one way of improving construction project's certainty and making it competitive. In this reason, we have to make an effort to set a priority based on analysis of quantitatively numerical value about work delay factors to manage them effectively. Thus, this study aims to suggest the basic data for the effective management and prevention of work delay in steel-frame work which is progressive actively now, along with increasing of demand of high-rise buildings by analyzing each reasons of work delay factors and also by suggesting important management factors that are coded according to each construction work using FMEA method which could give a data about the importance of work delay factors through quantitatively numerical value.

Probabilistic Earlier GMP Calculation Method for Apartment Using CM at Risk (CM at Risk를 적용한 공동주택의 확률론적 초기 GMP 산정방안)

  • Hyun, Chang-Taek;Go, Gun-Ho;Jin, Zhengxun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.3
    • /
    • pp.295-303
    • /
    • 2018
  • In the DBB delivery system, the design stage and the construction stage are separated. Because of this, design changes frequently occur, and problems such as construction cost overrun, schedule delay, and quality deterioration happen as well. Recently, in the construction industry CM at Risk(CM@R) delivery system, which can systematically solve the above-mentioned problems of DBB delivery system, meet various demands of clients, and overcome the limited cost and period. In the CM@R delivery system, the contractor negotiates for a maximum guaranteed price(GMP) with the client at the design stage, and the CM performer carries out the construction within the GMP. However, uncertainties are inherent in the GMP calculation because the calculation is based on unfinished drawings and documents. In this study, a Probabilistic Earlier GMP Calculation Method by combining a probabilistic tool of Monte Carlo simulation with a case based reasoning is proposed so that the uncertainty in GMP calculation is reflected. After the earlier GMP is calculated, a process to calculate the $2^{nd}$ GMP at the time of around 80 % of detailed deign and to negotiate with the client to fix the final GMP is proposed. The Probabilistic Earlier GMP Calculation Method is verified through the case study. In this study, researchers set the range of GMP through the proposed probabilistic GMP calculation and tried to reduce the risk through negotiation between the client and the CM performer. The proposed method and process would contribute to the successful introduction of CM@R in Korea.

Study on Management Plan of the Financial Supervisory Service According to Increase of Risk of Household Debts (중소형증권사 Project-Financing 우발채무 확대에 따른 금융감독원 관리방안에 관한 연구)

  • Lee, YunHong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.21-33
    • /
    • 2018
  • In 2018, the real estate markets have hardly been transacted according to the government's tight regulations of real estates, and have the high possibility to reach a low hit due to the hike of loan interest rates following the U. S rise of base money rate. The key profits for the large construction companies mainly come from the overseas plant projects and the domestic non-governmental construction projects. They suffered a lot such as the lowering of their credit ratings due to the large losses caused by the frquent design changes and work delay. Even in the domestic non-governmental construction projects, the general business risks are on the rise due to the property marketing moving over to the decreasing phase. The small and medium sized security companies has realized a lot of operaring profits as they participated in the PF market to make up for the losses in the securities trading business. But, now as the housing market is not so good around the nation except Seoul and the financial states of large construction companies are not good enough, they can face the liquidity crisis if there happens the problems in the PF backed securities which they have handled. As Korean economy experienced the crisis in the savings banks before, it is recommended that Financial Supervisory Service proposes the preemptive control method and supervision direction to overcome the crisis.