Proceedings of the Korean Institute Of Construction Engineering and Management
/
2004.11a
/
pp.250-255
/
2004
To analyze delay, Seoul - Daegu line of Korea High Speed Railway was divided into three sections and analyzed independently by the business characteristics. The analysis on the project delay reasons was performed on macro and micro scales. This analytic method was named as 'Macro-Micro Delay Analysis Method (MMDAM)'. The macro scale analysis has three approaches, which are (1) scheduling, (3) structural characteristic, (3) and responsibility of project administrative works. Micro analysis also has three, methodologies which are (1) As Planned Method, (2) As Built method, (3) Modified Time Impact Analysis for analyzing the most influential section which the largest delay occurred. Using elicited project delay reasons from above analysis, the questionnaire was carried out for analyzing the influence of project delay reason. The reasons of the delay were driven from two different aspects (1) structural characteristic and (2) responsibility of the people involved in the project. The reasons that were identified from aforementioned three sections are the factors of the delay of the large-scale government driven projects. Finally, the author suggested the methodology of identifying the project delaying factors. The author also analyzed delay reasons in both the overseas and domestic cases of high rapid railway construction and has elicited some benchmarks for the future projects.
Transactions of the Korean Society of Mechanical Engineers A
/
v.24
no.4
s.175
/
pp.811-823
/
2000
In design and manufacturing airframe structures which are composed of a lot of sub-assemblies and large complex profile shapes it is difficult to reduce so called hardware variations. Accordingly cost increasing factors for manufacturing airframe parts are much more than other machine parts because of the variability of fabricated details and assemlies. To improve cost and quality, accurate assembly methods and DPD techniques are proposed in this paper which are based upon using CAD/CAM techniques, the concept of KC's and the coordinated datum and index throughout the design, tooling, manufacturing and inspection. The proposed methods are applied to produce fuselage frame assemblies and related engineering aspects are described regarding the design of parts and tools in the context of concurrent digital definition. First articles and consequent mass production of frame assemblies shows a great improvement of the process capability ratio from 0.7 by the past processes to 1.0 by the proposed methods in addition to the cost reduction due to the less number of tools, reduced total assembly times and the space compaction needed by massive inventory. The need to achieve better Cpk, however, and future studies to be investigated will be addressed briefly.
Proceedings of the Korea Water Resources Association Conference
/
2020.06a
/
pp.353-353
/
2020
기후변화에 적응하기 위해 많은 나라들이 수자원 관리 전략을 마련하고 있으며, 대체 수자원 활성화 방안에 관심을 기울이고 있다. 본 연구에서는 대체 수자원 활성화 방안 중 빗물 저류지의 용량 결정 방법을 제시하고자 한다. 빗물 저류지의 용량을 결정하기 위해 메타 휴리스틱 방법 중 하나인 입자 군집 최적화(particle swarm optimization; PSO)를 선정하였다. 이는 기존 실제 설계에 사용되고 있는 시행착오법보다 시간을 단축시킬 수 있다. 최적화 모형은 python의 pyswarm package를 이용해 구성하였다. 모형의 입력자료는 저류지 유입량과 목표 공급량, 목표 보장률이고, 목적함수는 빗물 저류지 용량의 최소화이다. 제약조건은 모의된 보장률이 목표 보장률 이상을 달성하는 것이다. 여기서, 보장률은 전체 모의 기간 중 목표 공급량을 공급한 기간의 비율이다. 제시한 방법론의 적용성을 검토하기 위해 실제 저류지가 설계된 인천의 청라지구 1공구를 선정하여 적용하였다. 최적화 모형의 입력 유입량은 SWMM으로 산정된 1995년부터 2004년까지의 유출량이며, 목표 공급량은 실제 설계에 활용된 용수 목적별 요구 수량이다. 여기서 용수 목적별 요구 수량은 대상지역의 노면 청소수, 화장실 세정수, 호수 유지수 등이다. 산정 결과 계산 시간은 약 30초 소요되며, 목표 보장률을 만족하는 저류지 용량이 결정되었다. 본 연구에 제시한 방법은 제약조건이 추가되어도 기존 시행착오법에 비해 간편함을 확인하였다.
Proceedings of the Korea Concrete Institute Conference
/
2008.04a
/
pp.405-408
/
2008
The most effective factors that improve sections and elongate spans of the prestressed concrete girders are shapes of sections and strengths of concretes, and the concrete strength is more influenced to enhance the allowable tensile strength on top and bottom fibers than increasing of flexural strength of girders. In this study, 60 MPa high-strength prestressed concretes were constructed at the Wonsoo Bridge where in the 1st section of expanding constructions of the Nonsan to Junjoo Expressway, the high-strength concrete was placed on the eight- 35 meters simple span IPC girders of four lanes of Nonsan direction. During casting of girder concretes, quality controls were carried out with continuing controls of surface moistures and corrections of the unit water using the air-meter methods right after batching. It was confirmed that compressive strengths of girder concretes ensure the target strength and the heat of hydrations of girder concrete were measured. Though using same materials and constructing methods, there're a wide range of strengths of each girder, so, when high-strength concretes cast in the place hereafter, a countermove should be prepared.
The Journal of Sustainable Design and Educational Environment Research
/
v.18
no.1
/
pp.38-48
/
2019
The purpose of this study is to present a more effective daily checklist than the formal routine check before the experiment to prevent accidents in the university laboratory. To do this, we reconstructed the current daily checklist and previous research data and conducted a second Delphi survey. As a result, there were four general safeties such as arranging the laboratory, three mechanical safeties such as abnormal condition of machine and tool tightening parts, three electric safeties such as prohibition of loading around the electric distribution panel, six chemical safeties such as handling and managing harmful factors, three items of fire safety such as fire extinguisher inspection, five cases of gas safety gas container inspection, one item of biological safety such as the state of hand sterilizer management and one other item, which were provided in the daily checklist as twenty six categories in total. According to the opinions of related experts, it is necessary to have an easy and simplified daily checklist for actual daily checkups.
Proceedings of the Korea Water Resources Association Conference
/
2021.06a
/
pp.478-478
/
2021
전 세계적으로 많은 나라들이 기후변화에 적응하기 위해 수자원 관리 전략을 마련하고 있으며, 수자원의 근간이 되는 빗물의 효율적 사용을 위해 우리나라에서도 빗물이용시설이 많이 도입되고 있다. 본 연구에서는 사용자 편의 환경(graphical user interface; GUI)을 갖춘 빗물이용시설의 용량 결정 프로그램(capacity design aid for rainwater harvesting; CARAH)을 개발하여 관련 연구와 업무에 활용성을 높이고자 하였다. CARAH는 저수지 질량 보존식과 python의 pyswarm package에 탑재된 메타 휴리스틱 방법 중 하나인 입자 군집 최적화(particle swarm optimization; PSO) 기법을 연계하여 빗물이용시설의 최적 용량을 짧은 시간에 결정될 수 있도록 개발되었다. 그리고, C#의 Windows Forms Application을 이용하여 사용자 편의 환경을 구현하였다. CARAH의 입력 자료는 모의 기간, 유입량, 목표공급량, 공급보장률이고, 출력 자료는 공급보장률-저류조용량, 목표공급량-실공급량-미달성량, 저류용량-유입량-실공급량이다. 빗물이용시설 계획에 필요한 여러 입력 자료를 쉽게 입력할 수 있도록 구현하였고, 그래프와 표의 형태로 계산된 결과를 화면에 직접 표출함으로써 사용자가 직관적으로 확인할 수 있도록 하였다. 한편, 입·출력 자료를 포함한 분석 결과는 파일로 관리할 수 있도록 기능을 갖추어 수정 및 보완 등의 반복적 활용이 가능하도록 하였다. 개발된 프로그램의 활용성을 검토하기 위해 실제 저류지가 설계된 인천의 청라지구 1공구를 대상으로 적용하였고, 분석 결과의 적절성을 확인하였다. 본 연구에서 개발된 CARAH는 빗물이용시설의 용량 결정에 관한 효율을 높일 수 있는 프로그램이고, 누구나 쉽고 간편하게 사용할 수 있는 프로그램으로서 향후 활용성이 높을 것으로 판단된다.
Korean Journal of Construction Engineering and Management
/
v.24
no.3
/
pp.12-19
/
2023
In the case of the construction industry, the relationship between process and cost should be appropriately distributed so that the finished product can be delivered at the minimum fee within the construction period. At that time, it should be considered the size of the bridge, the construction method, the environment and production capacity of the factory, and the transport distance. However, due to various reasons that occur during the construction period, problems such as construction delay, construction cost increase, and quality and reliability degradation occur. Therefore, a systematic and scientific construction technique and process management technology are needed to break away from the conventional method. The prefab(Pre-Fabrication) is a representative OSC (Off-Site Construction) method manufactured in a factory and constructed onsite. This study develops a resource and process plan optimization system for the process management of the Nodular girder, a prefab bridge girder. A simulation algorithm develops to automatically test various variables in the personnel equipment mobilization plan to derive the optimal value. And, the algorithm was applied to the Paju-Pocheon Expressway Construction (Section 3) Dohwa 4 Bridge under construction, and the results compare. Based on construction work standard product calculation, actual input manpower, equipment type, and quantity were applied to the Activity Card, and the amount of work by quantity counting, resource planning, and resource requirements was reflected. In the future, we plan to improve the accuracy of the program by applying forecasting techniques including various field data.
In this "Wonju~Jaecheon double-lanes railroad" project, a highway is located at about 13meter above a tunnel. Initially, rock-splitting method was used for the tunnel excavation in order to minimize the possible damage on the highway. The method, however, takes a long time for the tunnel excavation and that may cause other problems like large displacement of tunnel and subsidence of highway ground before the tunnel can be stabilized by supporters. Therefore, the application of electronic blasting method(eDdevII) was recommended to control the blast vibration below 1.0cm/sec as well as to prevent the subsidence of highway ground. The analysis of the influence of tunnel excavation on the highway showed that electric blasting method is permissible for the safe management of the highway. Based on that, the tunnel construction under a highway could be carried out quickly and safely without any damages on the highway.
KSCE Journal of Civil and Environmental Engineering Research
/
v.31
no.4D
/
pp.595-601
/
2011
There is currently applied to the unit cost per a distance (KRW/km) for estimating the conceptual cost of civil work on basic planning stage of high speed railroad. This unit cost is an arithmetic average value based on historical data, which could be in big error. It also is difficult to explain the deficiency comparing the estimated cost derived from next basic design stage. This study provides the conceptual estimation model using by the parametric method and regression analysis. Independent variables are the distance and the geological materials (earth, weathered rock, soft-rock, hard-rock), extracting from the actual data to 36 contracts. The deviation between the unit costs estimated using the developed model and the actual cost data is presented in the range from -0.4% to +31%. This range is acceptable compared the typical range "-30% to + 50%". This model will improve the accuracy of existing method and be expected to contribute to effective total cost management and the economic aspects, reduce the financial expenditure.
The Journal of Korea Institute of Information, Electronics, and Communication Technology
/
v.11
no.1
/
pp.107-113
/
2018
In this paper, we design and implement a contest application that enables artists to participate in contest activities, manpower, and job information using smart-phone, and to share and systematically manage the information. While the competition is very important for the artists, it is not easy for them to search the competition information due to lack of time. Therefore, it is effective to provide them with contest information suitable for their interests and to be more immersed in creative activities by sharing them. The core function is to provide a space where artists can share contests in real time through the contest bulletin board and aims to provide a variety of functions for convenient convenience, such as buying and selling of works by artists and spoon market for purchasing materials and art tools do.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.