A Research on Improvement Scheme for Management Technique of Public Ordering Service Results and Estimation (공공발주용역 실적 및 평가 관리 프로세스 개선에 대한 연구)

  • Lee, Kyu-Sung;Lee, Han-kyu;Kim, Nam-Gon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.238-239
    • /
    • 2013
  • A system to efficiently utilize construction information has been in demand as a result of the changing society where information and knowledge leads to added value. Consequently, the government established a comprehensive information network system for construction industries to manage and utilize construction information which is the currently in use. However, this system is oriented toward management and business performance estimation for engineering and does not integrate a management system for design, construction technology, and construction engineering services. Therefore, this study proposes to develop object technology and management system of construction services and its evaluation to provide such information in real time.

  • PDF

A Study of the List for CM Product Measure Check-List through 4 Way View;Focusing on Owner, CMr, Designer, Constructor (4자관점을 통한 CM의 성과측정 체크리스트 항목에 관한 연구)

  • Ahn, Eun-Jin;Kim, Ju-Hyung;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.509-512
    • /
    • 2007
  • In Domestic, the beginning of CM system was at December 1996 by 'Construction Industry fundamental law'. Today the needs of CM is more and more during 10 years. Although the time of CM's induction and high-quality human resources are insufficiency, various studies and developments's level through theoritical base and academic level is good which are compared by developed countries's. But still now the effort of CM product measure part, especially public sector is not enough. Besides, the existing check-list is for project owner so it needs to make up for balanced view as organized 4way-view of owner, CMr, designer, constructor. On this study, produce the list of check-list and then weight of each list by view of owner, CMr, designer, constructor. The completec check-list will be useful for CM product measure objectively .

  • PDF

하도급대금 어음.대물변제 "뚝" - '09.1.28일부터 '하도급대금 지급확인 제도' 시행 -

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.223
    • /
    • pp.42-46
    • /
    • 2009
  • 최근 건설경기 침체에 따라 하도급 대금을 현금으로 지급하지 않고 불법 장기어음이나 미분양 아파트로 대물변제 등의 불법 하도급대금 지급행위를 근절하기 위해 국토해양부가 지난 1월 28일부터 '하도급대금 지급확인제도' 시행에 들어갔다. 하도급대금 지급확인제도는 원도급자가 하도급자에게 지급한 공사대금 내역과 하도급자가 수령한 하도급 대금을 발주자가 직접 비교 확인하여 하도급 대금의 적정지급 여부를 점검토록 한 것으로, 국토부 산하 지방청(국토관리 해양항만 항공)과 공사 공단에 전담부서를 지정하여 수시로 지급실태를 점검하고, 5개 국토관리청이 관할 구역 내에 공공발주 공사에 대하여 하도급대금 시급 실태를 총괄 관리하는 제도이다. 이 제도의 시행으로 공공공사에서는 불법 하도급대금 지급행위를 원천 차단 하여 불법 부당한 대금지급 관행이 근절될 것으로 기대된다. 이같은 제도를 시행하게 된 것은 그동안 대한설비건설협회(회장 강석대)가 불법 하도급대금 지급 근절을 위해 끊임없이 건의한 결과이다. 협회는 그동안 2차례에 걸친 국토부 차관과의 간담회를 비롯하여, 한나당 및 국토부 등 관련기관에 수차례에 걸쳐 건의했으며, 특히 연말에 이명박 대통령께 직법 건의하는 등 불법 하도급대금의 근절을 위해 많은 노력을 기울였다. 협회의 이러한 건의에 대해 국토부가 일정 부분을 수용함으로써 이 제도가 시행된 것이다.

  • PDF

2008년도 중소기업자간 경쟁제품 대상품목

  • Korea Corrugated Packaging Case Industry Association
    • Corrugated packaging logistics
    • /
    • s.78
    • /
    • pp.111-113
    • /
    • 2008
  • 중소기업진흥 및 제품구매촉진에 관한 법률 제9조의4 및 동법 시행령 제5조의 2의 규정에 따라 공정기관이 제품을 구매함에 있어 "중소기업자간의 제한경쟁 또는 중소기업자 중에서의 지명경쟁 입찰에 의하여 조달계약을 체결하여야 하는 제품"과 동법 제9조의6 및 동법시행령 제5조의5 규정에 따라 "공공기관이 발주하는 공사에 필요한 자재로서 공공기관이 직접구매하여 제공하여야 하는 품목을 다음과 같이 공고합니다.

  • PDF

Satisfaction Level and Performance Evaluation for CM Service in Korea (국내 건설사업관리 업무만족도 및 성과평가)

  • Kim, Won-Tae;Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.108-117
    • /
    • 2013
  • The domestic CM business market has continued to grow, but its size is relatively small yet in comparison with the total size of the domestic construction industry. Evaluation of CM projects was conducted through questionnaire surveys. Both clients and CM firms showed positive satisfaction levels. Nevertheless, the clients' satisfaction levels were relatively low in safety management, cost management, and document and information management. Superior areas of CM tasks were time management and recovery scheduling, quality control and technical instruction, and design value engineering. On the other hand, inferior areas of CM tasks were claim analysis and dispute resolution, cost estimation, and life cycle costing. Both entities have agreed with the positive effects of CM involvement in terms of cost saving, time reduction, quality improvement, and safety incidents prevention to at least 0~5% extent.

A Study on the Proper Methodology for Selecting Domestic Public Sector Construction Management Contracts (국내 공공부문 CM의 평가 및 낙찰자 선정방법 개선안 연구)

  • Lee Yong-Jun;Lee Hak-ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.296-299
    • /
    • 2002
  • Construction Management tends to create a formal procurement resulted from recent legislative procedures system in domestic construction industry. However, the fact that construction Manager(CMr) has been chosen, in practice, under a poor circumstance in selecting and discriminating specialty requires the more optimal procedures. Therefore, in this research, we analyze the existing shortcomings. the various procedures, influence factors, and the criteria to be considered in selecting and evaluating CMr. Also. this study suggests the improved method based on the facts above. To accomplish the construction project successfully, it is one of the advanced schemes to choose an adequate CMr needed to the project through the precision in the formation and application of the procedure as well as the suggested criterion in selecting CM.

  • PDF

Stakeholder's Valuation of Public PMO System Using Laddering (래더링 기법을 이용한 전자정부사업관리 위탁(공공 PMO)제도의 이해관계자 별 가치체계)

  • Back, Hyung-Chung;Park, Chan-Hyuk;Jang, Seong-Yong;Kim, Ja-Hee
    • Journal of the Korea Society for Simulation
    • /
    • v.24 no.4
    • /
    • pp.127-136
    • /
    • 2015
  • The e-government project management consignment system to allow the public PMO has been introduced to resolve the quality management issue and the business risk, pointed out by the reorganized Software Industry Promotion Act. The additional regulation improvements are demanded because the public PMO system cannot settle down due to the different opinions among related parties: owner, operator and PMO. Therefore, to make balanced regulation improvements, the in-depth studies are necessary to analyze the fundamental causes of the disagreement between the related parties. This study analyses the each related party's cognitive structure to perform public PMO successfully and the fundamental reasons that cause the different opinions by applying the cognitive psychological Means-end chain theory, the laddering technique and the HVM, Hierarchical Value Map. In addition, this study analyses the regulations required for the related parties to obtain the expected benefits.

CS9001품질경영·AQUA품질평가 시스템 공청회 개최-한국건설품질협회

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.9 s.206
    • /
    • pp.46-49
    • /
    • 2007
  • 한국건설품질협회가 지난 7월 18일 건설회관에서 CS9001품질경영시스템과 AQUA품질평가시스템 제도 도입을 위한 공청회를 개최하고 국제수준의 품질기준 마련에 들어갔다. 최근 들어 건설시장 개방에 따라 국제수준의 품질기준으로 국내 고객을 보호하고, 기능인력의 품질확보 능력을 배양 시켜 해외와 국내공사의 품질격차를 해소, 국가 경쟁력을 강화하고 하자보수 비용 감소로 건설업체의 질적 향상은 물론, 재무 건전성을 향상시키기 위한 시스템이 요구됨에 따라 한국건설품질협회가 CS9001 및 AQUA품질평가시스템 제도 도입에 들어간 것. 이 시스템이 도입될 경우 발주자는 품질의 공신력 확보, 품질확보 계약적 근거 유지가 가능하고 시공자는 실패비용의 최소화, 협력업체 기능품질 강화 등이 기대된다. CS9001, AQUA시스템의 적용범위는 중급품질관리 대상공사로 총공사비 100억원이상 건축 시설물로 초기에는 주거시설만 우선 적용하고 공공 및 민간공동주택 중 공사비 100억원이상에 적용할 예정이다.CS9001품질경영시스템, AQUA품질평가시스템에 대해 알아본다.

  • PDF

A Study on the Suggestion of Construction Contract Practice in the Public Project through the analysis of Construction Claims (건설클레임 사례분석을 통한 입찰 및 계약제도 개선에 대한 연구)

  • Cho Young-Jun;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.1 s.5
    • /
    • pp.78-87
    • /
    • 2001
  • Recently many construction claims related to the ommission and discrepancy of design document are alleged since 1998 and various dispute resolution methods are appeared. But many contractors alleged claims are not satisfied with the result because of not sufficiently reflecting construction practice. The purpose of this study is to analyze the liability of contract privity from the view point of the contract related law and to analyze the claims and claim factor, and to suggest construction contract practice in the public project. The construction claims related to the design document may be minimized, through (1) the accumulation and retrieval of standard forms by owners' type, (2) the usage of specified specification considering project characteristics, (3) the materialization of detail subsurface design and various contract method in heavy engineering construction.

  • PDF

Cost prediction model of Public Multi-housing Projects in Schematic Design Phase (공공아파트 계획설계단계에서의 공사비 예측모델)

  • Kwon, Ho-Suk;Moon, Hyun-Seok;Lee, Sung-Kyun;Hong, Tae-Hoon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.65-74
    • /
    • 2008
  • Public institutions recognize the importance of cost management from the planning stage but they do not have an organized construction cost estimation and management system. Thus, at the stage of planning a new public construction project and estimating the cost, those in charge of budgeting estimate construction cost based on existing data and experiences, compare construction cost estimated after the basic design stage and the execution design stage with budgets, and then decide whether to continue the project or change the design according to the budgets. Therefore, we would develop the cost prediction model through regression analysis that can predict construction cost in Schematic Design Phase of the Public Multi-Family housing. Accordingly, if public institutions have a construction cost prediction model and management system that can estimate the optimum construction cost, they can make and execute budgets in a more efficient way than they do at present.