• Title/Summary/Keyword: 공공시설 발주자

Search Result 18, Processing Time 0.025 seconds

Role of Public Owner for Delivery of Public Experience Facility Construction Project (공공 체험시설 건설사업 발주를 위한 공공 발주자 역할에 관한 연구)

  • Song, Hyunjang;Lee, Seunghoon;Jin, Zhengxun;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.28-36
    • /
    • 2022
  • Since the establishment of a large-scale public experience facility in Korea, the construction project of public experience facilities has recently changed to a form where local governments or local education offices place delivery alone or agreements. In particular, due to the low frequency of delivery and the nature of delivery organization that do not have specialized organizations specializing in Delivery Framework, the role of enhanced Public Owner is needed. In response, this study investigated the current status and operation status of public experience facility construction projects in Korea and derived problems and directions for improvement of the current role of Public Owner. In addition, the study proposed the improvement of the role of public Owner in public experience facilities, which are composed of the promotion stage and functions reflecting the factors and attribute information of the business characteristics.

A Study on Definition of Owner's Organizational Competency Factors (발주 역량 구성 요소의 정의에 관한 연구)

  • Lee, Si-Wook;Kim, Ok-Ki;Woo, Sung-Kwon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.525-530
    • /
    • 2008
  • Construction industry is based on receiving an order. So, it has a special feature that market and manufacture activity is formed by a user. For this reason, it has a great influence on other industry compare construction industry with other industry. Specially when build public structure as infrastructure, importance of owner is emphasized then private construction because the primary role of owner have a great effect on national finance. Inspite of that, the importance of a faculty and role of an owner and an ordering organ, it is weak that a study about objective and meaningful evaluation of the specially, common standard and ability of public ordering organ as a major user of domestic construction industry. So, this study define the evaluation sphere and an element of an ordering ability for develop an ordering ability evaluation guide which can evaluate objective ability of an ordering organ. Apply its evaluation sphere and element, judge a standard of an owner, thought the judgement, it can judge accurately of short ability and if it can make future oriented strategy, it can elevate the efficiency of an owner organization management.

  • PDF

Survey of Client/Owner Construction Safety Management (발주자 안전관리 실태조사 연구)

  • Moon, Jang-Ok;Ahn, Hong-Seob
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.53-57
    • /
    • 2006
  • 안전관리는 건설사업의 시공과정 중에 발생 가능한 유해, 위험으로부터 인명을 보호하는 것이며, 건설사업의 주제는 발주자로서 발주자 역할의 극대화는 효과적인 건설재해 방지의 관건이다. 건설프로젝트의 발주자, 설계자, 감리자, 시공자, 협력업자 등 다수 참여자의 장기간에 걸친 공동작업으로 이루어지는 건설공사의 특성을 고려할 때, 기존의 건설안전관리체제로는 건설공사에 수반되는 이와 다양한 유형의 사고를 방지하기 위한 근본적인 처방으로는 미흡하며, 건설산업의 총체적인 안전수준의 향상을 통한 시설품의 생애주기 전반에 걸쳐 안전성을 확보할 수 있는 근원적인 안전관리제도의 구축이 요구되고 있다. 실태조사 결과 공공발주자와 민간발주자의 안전의식 및 안전관리실태에는 격차가 크며, 대다수 발주자의 안전관리에 대한 책임의식이 미흡하며, 민간발주자의 경우가 훨씬 열악한 것으로 나타났다. 정부 감독기관의 발주자에 대한 안전책임 부여도 소극적이다. 발주자 안전관리가 미흡한 원인과 이의 촉진 방안에 대한 도출이 필요하다. 발주자에 대한 접근 방법의 홍보를 통한 책임의식의 고취, 발주자를 위한 안전관리매뉴얼 등 안전관리 도구의 제공, 법령을 동한 명확한 책임의 부여, 발주자가 책임을 이행할 수 있는 자질있는 안전전문가의 활용이 긴요한 것으로 사료된다.

  • PDF

이슈 & 이슈 - 시설공사 물품구매 발주 관행 개선

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.269
    • /
    • pp.58-63
    • /
    • 2012
  • 국민권익위원회는 지난 11월 1일 공공기관이 물품구매와 관련한 계약을 할 때 생길 수 있는 불합리한 관행을 개선하기 위해 '물품구매 계약의 합리성 제고 방안'을 마련하여 관계 부처인 기획재정부 및 행정안전부에 제도개선을 권고했다. 권익위는 '국가를 당사자로 하는 계약에 관한 법률 시행령'에 시설공사와 물품구매 등에 대한 정의 규정을 신설하는 등의 발주방식 판단기준을 마련할 것을 권고했다. 또한 시설공사를 물품제조나 구매로 발주하지 못하도록 입찰공고 시에 발주방식 준수의무를 '정부 입찰계약 집행기준'과 '지방자치단체 입찰 및 계약집행 기준'에 포함하는 방안도 제시했다. 아울러 공사나 물품, 용역 등 계약 목적이 겹치거나 혼합될 경우에는 주된 목적으로 발주방식을 결정하도록 하는 내용을 계약법에 신설하는 방안도 권고안에 포함했다. 국민권익위 관계자는 "이번 개선안이 수용되면 물품구매계약 과정에서 발생하는 불합리한 관행 및 제도가 개선되어 물품구매 계약의 합리성이 제고될 것"이라고 밝혔다.

  • PDF

A Study on the Prevention for Differing Site Conditions Claims - Focused on Design-Build Project in Public Sector - (현장여건상이로 인한 클레임의 예방에 관한 연구 -공공부문의 설계$\cdot$시공일괄공사를 중심으로-)

  • Chung Myung-Woo;Lee Hwa-Young;Seo Yong-Chil;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.46-53
    • /
    • 2001
  • Differing Site Conditions('DSC') Claims among construction claims are on the increase as a direct result of the steady construction of Social Overhead Capital Facilities initiated by Government. As DSC claims generally became apparent during the intial stage of the construction project, it is necessary to timely review and study the proposal on the prevention of DSC claims because delayed settlement will incur more substantial damages to all parties concerned. This research is focused on the identification and analysis of the causes for DSC claims as applicable to design-build project in public sector and it presents the possible short term, medium and long term proposals on the improvement of causes related with DSC claims. The major results of this research are summarized as follows: 1. Improvement of contractor's tender practice 2. Contractor's division of responsibility on the site survey 3. Improvement of owner's exculpatory clause 4. Flexibility on the adjustment of contract amount The proposals stated above could be useful in resolving the DSC claims between owner and contractors.

  • PDF

A Study on the Current Status and Improvement of BIM in the Government Owner Perspective - Focus on the KEPCO Na-Ju Head Office Project - (공공시설 발주자 관점에서의 BIM 적용 현황 및 개선방안 연구 - 한국전력공사 나주 신사옥 건립공사 사례를 중심으로 -)

  • Sim, Gu-Sik;Kim, Sung-Man;Ahn, Jae-Hong
    • Journal of KIBIM
    • /
    • v.3 no.2
    • /
    • pp.19-27
    • /
    • 2013
  • The application of the BIM for the KEPCO' new headquarters in Naju involved alternative approaches and accompanied many trials-and-errors as the project adopted new targets and purposes that were not used in Korea before. In particular, for a large BIM-based project, clearly defining the BIM-including the objective, scope and the outcome-is critical for a project owner. For a successful implementation, project owners should improve the utilization of the BIM. Against this background, this research examines the case of the BIM application for the KEPCO' new headquarters in Naju, identifies its effects and problems, and proposes how to improve application of the BIM for public projects. The improvement in the BIM application can be divided into several stages: project order, design development, construction, and post-construction maintenance. In the initial stage, it is important to fully discuss the project planning among participants, and clarify the goal, scope, expected outcomes and role of the BIM. In the design stage, the level of detail (LOD) for the 3D model should be defined in consideration of information use in the stages of estimation and construction. In the construction stage, the scope of project that is managed based on the processing and use of the BIM data should be clearly given and understood. After construction is complete, measures should be sought to use the BIM for maintenance, and corresponding requirements and outcomes should be provided. The analysis is expected to provide basic data for successful implementation of BIM-based public projects, by assisting project owners and involved parties in enhancing work in different stages of a project.

Cost Estimating method for the Public Office building at the early stage (공공건축물의 초기공사비 산정방법 연구)

  • Koo, Won-Yong;Kim, Jung-Gon;Lee, Jun-Seok;Park, Hyeong-Geun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.261-266
    • /
    • 2007
  • In this research, we studied an estimating method in client's sight to estimate the total construction cost which is based on the historical cost data at the early stage of the office buildings as a public phase. It is very difficult to analyze the estimation accurately and logically. When a client estimates a project, he/she has to consider there are many issues at the planning step, according as office buildings become gradually diversified as well as their roles continuously extended. Therefore, those are usually make problems for wasting the budget in accordance with the cost estimation errors. Moreover, many kinds of public construction projects, especially such as school, office, sports complex, and the others, have been invested the private finances defined as BTL(Build Transfer Lease) method that are required to manage the detailed process more strictly from initial planning. In order to make an effective planning, the long-term users amount and the building life cycle at the beginning of project should be considered previously and then it may enable to achieve an appropriate project plan. But actually considering overall variables in a building planning is impossible. Accordingly, suggesting a regression model based on the historical cost data from many similar types of office building to support client's role known as estimating the total cost at the early stage. And then performing the test against the proposed model to research the reasonability as using the historical cost data of Japan office buildings.

  • PDF

법령과고시 - 정부시설공사 계약예규 개정

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.262
    • /
    • pp.48-52
    • /
    • 2012
  • 기획재정부와 행정안전부는 계약 예규를 개정하고 지난 4월 2일부터 시행에 들어갔다. 기획재정부는 이번 계약예규 개정을 통해 등록기간 3년 미만 업체가 공동수급제에 참여할 경우 만점기준을 완화했고, 1억 이상 3억 미만 전문공사의 경우 만점기준이 발주금액에 대한 '3년 실적의 1/2배 이상'에서 '평가면제'로, 3억 이상 50억 미만 전문공사의 경우 '3년 실적의 2배 이상'에서 '1/2배 이상'으로 평가방법을 완화했다. 또한 발주기관에서 공공공사 예정가격을 산정할 경우 반드시 최신 표준품셈을 사용하도록 의무화했으며, 적정 노무비 보장 심사 강화 방안으로, 최저가낙찰제 공사에서 업체가 제출한 노무비가 발주기관에서 산정한 노무비의 80% 미만일 경우 탈락된다. 기획재정부는 이번 개정으로 시공경험이 부족하지만 기술력 등이 우수한 신설 중소 업체가 공공공사에 참여할 수 있는 기회가 늘어날 것으로 기대하고 있으며, 최저가낙찰 시 과다한 노무비 삭감 등으로 인한 건설 근로자 소득감소 및 내국인 건설업 기피 등을 막을 수 있을 것으로 기대하고 있다. 한편 행정안전부는 이번 계약예규 개정을 통해 지방자치단체 입찰 및 계약관련 예규를 현행 11개에서 2개로 통합했고, 지자체가 발주하는 50억원 이상~100억원 미만의 공사의 경우 참가자격 적격심사 항목 중 자산회전율 평가를 삭제했으며, 신용평가 등급을 완화해 지방 중소기업들의 입찰 참가 기회를 확대하기로 했다.

  • PDF

CS9001품질경영·AQUA품질평가 시스템 공청회 개최-한국건설품질협회

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.9 s.206
    • /
    • pp.46-49
    • /
    • 2007
  • 한국건설품질협회가 지난 7월 18일 건설회관에서 CS9001품질경영시스템과 AQUA품질평가시스템 제도 도입을 위한 공청회를 개최하고 국제수준의 품질기준 마련에 들어갔다. 최근 들어 건설시장 개방에 따라 국제수준의 품질기준으로 국내 고객을 보호하고, 기능인력의 품질확보 능력을 배양 시켜 해외와 국내공사의 품질격차를 해소, 국가 경쟁력을 강화하고 하자보수 비용 감소로 건설업체의 질적 향상은 물론, 재무 건전성을 향상시키기 위한 시스템이 요구됨에 따라 한국건설품질협회가 CS9001 및 AQUA품질평가시스템 제도 도입에 들어간 것. 이 시스템이 도입될 경우 발주자는 품질의 공신력 확보, 품질확보 계약적 근거 유지가 가능하고 시공자는 실패비용의 최소화, 협력업체 기능품질 강화 등이 기대된다. CS9001, AQUA시스템의 적용범위는 중급품질관리 대상공사로 총공사비 100억원이상 건축 시설물로 초기에는 주거시설만 우선 적용하고 공공 및 민간공동주택 중 공사비 100억원이상에 적용할 예정이다.CS9001품질경영시스템, AQUA품질평가시스템에 대해 알아본다.

  • PDF

A Study on the Proper Methodology for Selecting Domestic Public Sector Construction Management Contracts (국내 공공부문 CM의 평가 및 낙찰자 선정방법 개선안 연구)

  • Lee Yong-Jun;Lee Hak-ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.296-299
    • /
    • 2002
  • Construction Management tends to create a formal procurement resulted from recent legislative procedures system in domestic construction industry. However, the fact that construction Manager(CMr) has been chosen, in practice, under a poor circumstance in selecting and discriminating specialty requires the more optimal procedures. Therefore, in this research, we analyze the existing shortcomings. the various procedures, influence factors, and the criteria to be considered in selecting and evaluating CMr. Also. this study suggests the improved method based on the facts above. To accomplish the construction project successfully, it is one of the advanced schemes to choose an adequate CMr needed to the project through the precision in the formation and application of the procedure as well as the suggested criterion in selecting CM.

  • PDF