A Study on the Problem Analysis and Improvement Measures of Subcontract Management to Middle or Small Construction Contractors (중소건설사의 협력업체 관리실태에 대한 문제점 및 개선방안에 관한 연구)

  • Lee, Kang-Yong;Kang, Hyun-Wook;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.580-584
    • /
    • 2007
  • The purpose of this study is to analyze managemental problems that were made by cooperator and to offer improvable plan for small and medium construction company. The adapted research method a case study three small and medium contractors and investigate the managemental operation of cooperator and rating standard. Also analyze problem of the rating standard and managemental state of the cooperator and offer improvable plan. The results of this research are as follows. 1)Applying open bid system for supplying low price subcontract for practical rule. 2) Applying rating ratio of subcontract that is followed by receiving status, constructing ability, and selling scale of small and medium construction company for improving working of cooperator.

  • PDF

A Study on the Time Series Analysis of the Actual Unit Cost based on the Bid Prices (시계열을 이용한 실적단가 예측방안에 관한 연구)

  • Park, Won-Young;Seo, Jong-Won;Kang, Sang-Hyeok;Choi, Bong-Joon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.50-57
    • /
    • 2009
  • The Korea Standard of Estimate which has been used as the only basis of Cost estimate of public construction projects is failed to reflect the fluctuation of current construction cost. Therefore, the government decided to gradually introduce historical construction cost into cost estimate of public construction projects from 2004 and to reduce the use of Korean Standard of Estimate. This paper presents a series of process and the methodology for computing Actual Cost and analyzing the fluctuation patterns based on not only previous contract prices which made a successful bid but also all of the other bid prices. Also, this paper mainly handles a device for extracting strategic bid price such as low price bid for assuring reliable data and for predicting the construction cost which is built by Wavelet Analysis of Time series Analysis data and Neural Network. It is anticipated that the effective use of the proposed process for estimating actual unit cost would make the cost estimation more current and reasonable.

Development of a Business Support System by Phase for Delivering Construction Management Contract in the Government Civil Project (공공토목사업 CM 발주를 위한 단계별 업무지원 시스템 구축)

  • Chae, Yeong-Seok;Park, Seo-Young;Moon, Hyoun-Seok;Kim, Seon-Yeong;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.81-92
    • /
    • 2011
  • Recently, the MLTM (Ministry of Land, Transport and Maritime Affairs) has announced CM business guidelines, because it is expected that the CM deliveries are going to be increased for a civil engineering industry with enforcement of the CM at Risk. In this trend, The CM business guideline, which is currently announced, is for the steps after the CM contract. However, the practical business guideline from a planning phase for the CM delivery to a selection phase of a CMr (Construction Manager) is essential for public construction projects including the civil engineering projects that the frequency of the CM deliveries is not sufficient. Therefore, this study established a standardized process model from the planning phase for the CM delivery to the selection phase of the CMr. study configured a business breakdown structure for CM delivery. A prototype system for supporting the CM delivery was also developed, and a practical operability was verified by a case evaluation based on the developed system. Hence, it is expected that this study will be utilized as a supporting system of the CM delivery business for public clients, which have not sufficient cases of the CM delivery.

Satisfaction Level and Performance Evaluation for CM Service in Korea (국내 건설사업관리 업무만족도 및 성과평가)

  • Kim, Won-Tae;Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.108-117
    • /
    • 2013
  • The domestic CM business market has continued to grow, but its size is relatively small yet in comparison with the total size of the domestic construction industry. Evaluation of CM projects was conducted through questionnaire surveys. Both clients and CM firms showed positive satisfaction levels. Nevertheless, the clients' satisfaction levels were relatively low in safety management, cost management, and document and information management. Superior areas of CM tasks were time management and recovery scheduling, quality control and technical instruction, and design value engineering. On the other hand, inferior areas of CM tasks were claim analysis and dispute resolution, cost estimation, and life cycle costing. Both entities have agreed with the positive effects of CM involvement in terms of cost saving, time reduction, quality improvement, and safety incidents prevention to at least 0~5% extent.

Development of Project Delivery System in Public Sector for Modular Building (모듈러 건축물의 특성을 반영한 공공발주 방식의 개발)

  • Nam, Sunghoon;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.49-56
    • /
    • 2016
  • Recent research has been ongoing for modular buildings in the country and interest increases. However, the activation of modular building projects is obstructed in the construction industry. There are many reasons to identity for this obstruction but one issue should be focussed. Modular buildings require to change the existing construction production system to a new construction production system, which is factory production - transportation - erection. However, the existing project delivery system in the public sector could not be adapted for this new construction production system due to the obligation of multi prime contract use, such as electrical, communication, fire fighting contracts by Law. Therefore, modular buildings in the existing project delivery system are separately contracted by multi prime contracts and modular units composed of the buildings are contracted by an architectural prime contractor as a commodity. As results, construction costs are increased, potential quality problems are raised and the existing project delivery system is finally an obstacle not to maximize benefits of the modular buildings. In this paper, we propose a new project delivery system for the modular buildings to adapt then ew construction production system.

A Study on Method Activation of Construction Management through Investigation of Public Owners' Capability level (공공부문의 발주자 역량 수준 조사를 통한 건설사업관리 활성화 방안 연구)

  • Kim, Sun-Sik;Kim, Ju-Hyun;Lee, Yun-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.289-294
    • /
    • 2007
  • It has been 10 years Since December 1996 when CM method was institutionalized by Construction Industry Fundamental law. Even though construction market has been in stagnant of business activities till now, CM in Korea started to be activated by the introduction of CM method i.n public construction. In the end of 2005, the number of CM order's contract is 6.7 times , an amount of CM order's money is 9.2 times more than operation plan of CM system announced in 2001. Therefore, CM market has been dramatically growing. However, it is judged that the shortage of faith in CM project and necessity of CM method are not recognized and study on a owner who affects successful settlement of CM has not been performed. When considering those points, in introduction and practical use of CM, CM is suggested to the field which is necessary for a client through the task performance level research and analysis of a owner who act a important role to activate Construction Management. As result of studying pre-existing papers to i.nvestigate of owner's capability level, the task function of a client is classified into 10 types and a public opinion poll was performed based on the 10 types of function.

  • PDF

A Study of the Employment Condition and Labour Experience of Elementary After-School Care Teachers: A Case of Gwangju Metropolitan City (초등돌봄교사의 고용형태와 노동경험에 관한 연구: 광주광역시 사례를 중심으로)

  • Kim, Hyun Mi;Shin, Julia Jiwon
    • 한국사회정책
    • /
    • v.23 no.2
    • /
    • pp.141-172
    • /
    • 2016
  • This study examines the employment conditions and labour experience of elementary after-school care teachers in South Korea. Based on the empirical data collected through in-depth interviews with after-school care teachers in Gwangju Metropolitan City, the study considers multifaceted problems faced by after-school care teachers in their workplace. The after-school care class is part of educational policies initiated and rapidly expanded by the Ministry of Education, resulting in the substantial increase of non-regular school workers. The irregularization of after-school care teachers illustrates that the common problems faced by female non-regular workers, such as social discrimination, exclusion and inequality, are also transplanted into the typical public sector. In the case of Gwangju Metropolitan City, during the past two years there have been evident increases both in under 15-hour short time contract care teachers and outsourcing of care classes. Temporary part-time contract care teachers suffer relentless job insecurity and experience poor working conditions, exclusion and discrimination within the workplace and labour alienation. In order to minimize the organized resistance of care teachers, school authorities implicitly individualize and isolate care teachers through hierarchization, the division of labour and the spatial division of classes between indefinite and temporary contract teachers.

An analysis on the possession and infringement of copyright on the contents-related contest exhibit (콘텐츠 관련 공모전의 저작권 소유와 저작권 침해 분석)

  • Park, Keong-Cheol;Jung, Sun-Mee
    • Cartoon and Animation Studies
    • /
    • s.29
    • /
    • pp.243-266
    • /
    • 2012
  • As contest exhibits have been activated, a variety of organizations are holding contest with various purposes. Analysis on the guidelines prepared by various sponsoring bodies ranging from public organizations to privately owned businesses shows that sponsoring bodies tend to possess copyrights of entries. Parts of guidelines of contest exhibit are the contract. While sponsoring body shows its opinion on copyright through guidelines, individual participant tends to consider it simply as a form to submit for contest exhibit rather than a contract. Now is the time to bring out a question in respect of the copyright on the contest exhibit. The important fact is that copyright on corporate contents is important, but copyright on individual contents is equally important and it must be protected and respected. This study aims to bring out a question on copyright by analyzing possession and infringement of copyright that stands forth in the guidelines of contest exhibit. Provisions on copyright of contest exhibit play a role as a contract. Provisions on copyright of contest exhibit shall be the ones which can be understood and accepted by both sponsoring body and winner who are the A and B of a contract. For this, change in perception of sponsoring bodies ranging from public organizations to privately owned businesses with prominent position is strongly required. For the foregoing, First, Indication of Copyright: Clear and concrete terms must be used. Second, Scope of Interpretation: Concrete and detailed indication must be made for preventing indication that allows comprehensive interpretation. Third, Cost for Author's Property Right: In case sponsoring body needs to possess or use the author's property right of prize-winning work, proper rights on use considering prize money corresponding to possession or use of author's property right must be indicated. Fourth, Term of Use: The term for using author's property right must be indicated. Fifth, Scope of Rights: The scope of author's property right that sponsoring body requires must be limited and indicated. Sixth, Mutual Respect: Items related to copyright must be indicated on the basis of the concept of bilateral contract founded on mutual consideration and respect, not on the concept of unilateral contract.

건설산업경쟁력 강화와 부실방지대책(안)

  • 한국주택협회
    • 주택과사람들
    • /
    • no.54 s.71
    • /
    • pp.185-206
    • /
    • 1996
  • 1.건설제도의 국제화와 경쟁기반 구축 $\bullet$건설산업을 기획$\cdot$설계$\cdot$시공$\cdot$감리$\cdot$사후관리 등 전 분야에 걸쳐 경쟁력 있는 산업으로 육성-기획$\cdot$설계$\cdot$시공$\cdot$감리$\cdot$유지관리 등 건설산업 전반에 관한 기본사항을 법제화-대규모 공사의 경우 발주자를 대신하여 건설공사의 기획$\cdot$설계$\cdot$발주$\cdot$감리$\cdot$시공관리 등 업무의 전부 또는 일부를 종합적으로 조정$\cdot$관리하는 $\lceil$건설사업관리$\rfloor$제도를 도입 $bullet$건설공사 $\lceil$현장실명제$\rfloor$도입을 통한 하도급제도의 정비-전문건설업자로부터 하도급, 위탁, 고용 등의 형태로 공사에 참여하는 현장근로자를 신고 받아 권익을 보호하고 시공책임도 부과하는 $\lceil$현장실명제$\rfloor$도입 $\bullet$공사완성보증제, 손해배상보증제도를 도입하고, 신용상태 $\cdot$시공능력에 따라 보증 요율 등을 차등화 하여 부실업체를 배제 $\bullet$건설공사관련 각종 계약서와 시방서 등 제기준을 정비하여 발주자$\cdot$시공자 등 건설주체간의 역할과 책임을 명확화$\bullet$건설분쟁을 신속하고 객관적으로 조정$\cdot$중재하기 위하여 $\lceil$건설분쟁중재원$\rfloor$으로 확대 개편 2. 건설인력의 육성과 고용안정$\bullet$경쟁력 제고의 관건인 우수인력 확보를 위하여 대학교육 제도의 개선을 포함한 건설 인력 수급대책을 추진 - 대학의 건설관련 학과 정원을 2000년까지 매년 일정규모로 증원하여 고급기술 인력을 배출 현재 50$\%$에 불과한 건설관련 국가기술자격자를 2000년에 70$\%$까지 제고 - 감리 등 전문인력을 양성하고, 선진외국 감리 회사를 활용하여 국내 업계와의 경쟁을 유도 $\bullet$건설현장의 최일선에서 품질을 담당하고 있는 건설기능공의 고용안정과 복지향상을 위한 획기적인 대책을 마련 - 건설기능공의 자긍심과 사회적 책임의식을 고취하기 위해 기능공이 여러 현장을 전전하여 근무하더라도 경력관리, 공제금 등의 합산 관리가 가능하도록 $\lceil$건설 근로자 복지카드$\rfloor$제도를 도입 *$\lceil$건실시연구단$\rfloor$을 구성$\cdot$구체적인 운영방안을 수립 - 건설 업체 실정에 맞는 현장위주의 기능검정제도 도입 $\cdot$자격증이 현장에서 요구되는 기능수준과 숙련도를 제대로 반영할 수 있도록 검정방법을 현장 실기위주로 개선하고 자격검정업무도 건설협회 등의 자격 검정능력을 향상시켜 위탁$\cdot$시행하는 방안을 검토 3. 공사시행기관의 전문성과 책임성 제고 $\bullet$시장이 개방되어 건설공사가 국제적인 관행에 따라 이루어질 것에 대비하여 시행기관에 계약$\cdot$공사관리 등 전문직공무원을 집중 교육하여 양성 $\bullet$ 조달청이 대행하여 공사계약을 하는 경우라도 설계변경은 발주기관이 자체적으로 할 수 있도록 허용 $\bullet$ 기술직 공무원의 기술향상을 위하여 관련 공무원의 확충, 해외연수, 현장교육 강화 등을 지속적으로 추진 $\bullet$ 충분한 사전조사를 거쳐 사업계획을 수립하도록 $\lceil$건설공사 시행절차$\rfloor$를 규정 $\bullet$ 공사기간 3년 이상의 공사에 대하여는 최대한 계속비사업으로 편성토록 계속비제도의 운영을 활성화 4. 건설현장의 품질관리체제 구축 $\bullet$ 현장배쳐플랜트 설치를 확대하여 레미콘의 품질관리를 일원화하고 현장에서 레이콘을 배합하는 건식공법을 채택 - 현장레미콘생산시설(B/P)설치 확대로 콘크리트 하자에 대한 책임한계 일원화 유도 - 레미콘 재료인 골재$\cdot$시멘트$\cdot$물을 공장에서 혼합하여 공급하는 현행 습식배합 대신에 물만을 현장에서 혼합하는 건식 배합방식을 도입 $\bullet$철강재$\cdot$철구조물의 품질을 보증하기 위하여 일정기술을 갖춘 공장에서만 제작토록 하는$\lceil$공장인증제$\rfloor$를 도입 - 제작시설과 품질관리 등을 심사하여 제작공장을 등급화하고 등급에 따라 철강재 등의 제작업무 범위를 차등화 $\bullet$시설물에 대하여도 시공업체가 제작공장을 등급화하고 등급에 따라 철강재 등의 제작업무 범위를 차등화 $\bullet$시설물에 대하여도 시공업체가 사후관리를 일괄 책임질 수 있도록 $\lceil$시공 및 유지관리 일괄계약제도$\rfloor$를 도입 - 대형교량$\cdot$소각로$\cdot$하수처리장 등 유지관리에 전문성이 요구되는 분야부터 시범적으로 도입 $\bullet$건설자재의 표준화$\cdot$정보화사업을 조속히 추진 5. 건설업체에 대한 지원 강화 $\bullet$일부 공공사업자의 경우 관행화되어 있는 대금일부의 어음 또는 채권지급방법을 단계적으로 축소 $\bullet$매월 감독이나 감리원의 기성확인에 의하여 시공자에게 공사대금을 직접 지급토록 하는 등 대금 지급절차를 간소화 6. 민간 건축물에 대한 안전확보 $\bullet$충실한 설계가 이루어지도록 제도를 개선 - 설계도서 작성기준을 제정하고 다중이용시설에 대하여는 건축심의단계에서 구조검토 등 설계심의를 의무화 $\bullet$대형다중이용시설에 대한 감리 강화 - 감리전문회사 수준의 감리체제로 전환하고 감리대가도 공공수준으로 인상하고 적용요율대로 지도$\cdot$감독 강화

  • PDF

A Case Study on the Calculation of Delay Damages for Contractors according to the Extension of Contract Period (계약기간 연장에 따른 시공자의 손실비용 산정에 관한 사례 연구.)

  • Lee Gi-Han;Kim Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.305-310
    • /
    • 2001
  • The purpose of this study is to calculate delay damages for contractors. The study has been performed by investigation of delay cost occurrence status and the analysis of subway construction cases. The results of this study are as follows: 1. Delay cost( 1day) equivalent to $0.005\%$ of total construction cost by analysis case studies. 2. Including bank interest, dealy cost is analysed as the following; $1.1\~9.2\%$ of total construction cost in part extension period, $3.3\~11.0\%$ of total construction cost in total extension period. 3. In comparison between liquidated damages and delay cost, liquidated damages account for average 20.1 times of delay costs. 4. Acceleration cost will be calculate on the basis of delay cost calculation method. In the result of this method, acceleration cost is equal to delay cost at least or must be large than delay cost