A Comparative Analysis on Safety Evaluation System and Requirement in the Tendering Process of Public Construction Projects - Cases of Singapore and Japan - (공공공사의 입찰과정에서 안전평가체계와 요건의 비교분석 - 싱가포르, 일본 사례를 중심으로 -)

  • Park, Hee-Taek;Oh, Chi-Don;Park, Chan-Sik;Choi, Jin-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.130-139
    • /
    • 2013
  • Construction accident rates are reflected in the pre-qualification of public construction projects in order to prevent accidents and facilitate the safety management of construction companies. However, the construction industry is still experiencing an increase in accident rates. Hence, there is a need to strengthen existing safety evaluation systems and requirements in public construction tendering. The objective of this study was to acquire and provide basic data for benchmarking to select tenderers in domestic public construction projects. In Singapore and Japan, safety evaluation systems and requirements are applied based on various aspects in order to screen tenderers. These evaluation systems include safety regulations and institutional requirements, as well as safety performance and safety management plans of respective construction projects. This study recommends that korean public construction projects also apply similar safety evaluation systems which include comprehensive safety criteria in order to decrease accident rates in the industry.

A Selection Model of Suitable Tendering System for Public Construction Projects (공공건설공사의 최적 입찰방식 선정모델)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.164-174
    • /
    • 2008
  • It is crucial In decision making to select a project delivery system (PDS) adjusted accordingly to the project characteristics. Furthermore, selecting a tendering system is the kernel in the process of selecting PDS. In October 2007, the Ministry of Finance and the Economy of Korea launched two new project delivery systems, "Best Value Contract (Design-Bid-Build)" and "Bridging Contracts (Design-Build)" by revising enforcement ordinances of "Act on Contracts to Which the State is a Party" to provoke the tendering systems. In order to support the proposed purpose, this research developed a selection model for suitable tendering system, which helps a public owner select a tendering system appropriate to the project characteristics. First, the framework of the model was set throughout analyzing previous researches and interviewing relevant experts. Additionally, by analyzing the survey result from 265 experts engaged in architectural and civil engineering business, the relative weights of the selection factors and the effectiveness values of the alternatives were suggested as the quantitative evaluation references. Finally, the practical guideline was suggested to apply this model to three public projects scheduled to be delivered. The result of applying the model to three case projects showed that further researches were needed to make the selection process logical and to suggest the standard weights and effectiveness values according to project type.

A Case Study on Owner's Loss Incurred due to the Financial Cost of Public Construction Works in Korea (국내 공공공사에서 발주자 손실의 금융비용 사례연구)

  • Jeong, Min;Lee, Ghang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.136-145
    • /
    • 2008
  • Occasionally an owner of public construction work pays financial costs in addition to progress payments. However, the overall scale of financial costs are not known. This research examines, based on a case study, the financial cost incurred in public construction works and the following issues: the overall scale of financial costs, the impact on financial costs on the owner, and the impact of timing on the overall sum of the financial costs. Annually, more than 2.3 trillion KRW are paid as progress payments for public construction work; yet, there is no research data showing the scale of financial costs thus incurred. The purpose of this research is to illustrate the scale of financial costs incurred due to progress payments for public construction works, and to suggest alternatives that would improve relevant regulations.

이슈 & 이슈 - 시설공사 물품구매 발주 관행 개선

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.269
    • /
    • pp.58-63
    • /
    • 2012
  • 국민권익위원회는 지난 11월 1일 공공기관이 물품구매와 관련한 계약을 할 때 생길 수 있는 불합리한 관행을 개선하기 위해 '물품구매 계약의 합리성 제고 방안'을 마련하여 관계 부처인 기획재정부 및 행정안전부에 제도개선을 권고했다. 권익위는 '국가를 당사자로 하는 계약에 관한 법률 시행령'에 시설공사와 물품구매 등에 대한 정의 규정을 신설하는 등의 발주방식 판단기준을 마련할 것을 권고했다. 또한 시설공사를 물품제조나 구매로 발주하지 못하도록 입찰공고 시에 발주방식 준수의무를 '정부 입찰계약 집행기준'과 '지방자치단체 입찰 및 계약집행 기준'에 포함하는 방안도 제시했다. 아울러 공사나 물품, 용역 등 계약 목적이 겹치거나 혼합될 경우에는 주된 목적으로 발주방식을 결정하도록 하는 내용을 계약법에 신설하는 방안도 권고안에 포함했다. 국민권익위 관계자는 "이번 개선안이 수용되면 물품구매계약 과정에서 발생하는 불합리한 관행 및 제도가 개선되어 물품구매 계약의 합리성이 제고될 것"이라고 밝혔다.

  • PDF

Estimation Method of the Competitive Bid-price in Bid-rigging of Public Construction (기댓값 분석에 따른 공공공사 입찰담합의 가상경쟁가격 산정방법)

  • Jeong, Kichang;Kim, Wooram;Kim, Namjoon;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.52-60
    • /
    • 2018
  • Korea's public construction projects are under construction through bidding, however, due to the nature of the bidding, collusion between participants can occur. The collusion of bids accordingly damages the client. So, it is necessary to calculate the appropriate fictitious competition price to compensate for this. In this regard, econometrics methods are generally used, but there are limitations and issues arising from the nature of construction, especially design-build bid. Therefore, this study proposes a method to estimate reasonable competitive bid-price in design-build bid. It derives the lowest bid-price from the design submitted by the proponent and estimates the competitive bid-price by examining the factors according to the penetration rate according to the technical level of the tester, the skill level of the competitor, and the type of tester. Based on the method proposed in this study, a reasonable price can be derived that reflects the characteristics of the design and construction bidding bidder selection method and also it can be used as a reference material in the actual bidding process as well as calculating the damage due to the answer.

A Study on a Strategy to Enhance the Transparency of the Bidding and Contract System for Public Construction Projects (공공건설사업 입찰 및 계약제도측면의 투명성 확보 전략에 관한 연구)

  • Cho, Young-Jun;Kim, Jong-Ouk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.6
    • /
    • pp.109-116
    • /
    • 2010
  • A construction project consists of many types of contracts. In the process of selecting the successful contractor after bidding, there will inevitably be fierce competition, which may lead to corruption or bribery. Even after signing the contract, during the period of settling the amount of the contract, bribery could occur. Such corruption could harm the development of the construction industry. It is, therefore, necessary to establish a strategy to prevent corruption by strengthening the transparency of the bidding process. In this study, to prevent corruption in the construction industry, a new service is proposed in which the successful bidder is selected by a professional third party, and the introduction of diverse delivery systems for construction projects and the invigoration of alternative methods of settling disputes are also proposed in this study.

Performance Measurement of ISO Quality Management System in the Construction Industry (건설산업 ISO 품질경영시스템의 성과측정에 관한 연구)

  • Lee Woo-Chang;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.414-418
    • /
    • 2004
  • Quality system of construction industry in Korea was a means to prevent unqualified construction work. But lately, it has became an essential requirement. So, lots of construction companies acquire ISO quality management system which provides fundamental management criteria. Now, most of the Korean construction companies have got IS0 quality management system. So, getting ISO quality management system doesn't mean advantage in public competition of construction bidding and that causes increase in the maintenance cost. That's why some construction companies abandon the 150 certificate. Therefore, the authors need to check the effect of ISO quality management system. For this, the authors provide the performance measurement index of ISO quality management system.

  • PDF

Improvement Plan of Post Construction Evaluation: Focus on Construction Performance (건설공사 사후평가 개선방안: 사업수행성과 중심으로)

  • Park, Heesung;Kim, Tae Yeong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.3
    • /
    • pp.375-383
    • /
    • 2024
  • The size of the construction industry is increasing, and its impact on the entire national industry is also significant. However, construction cost increases, construction period delays, safety accidents, and quality problems occur during the construction process. This paper analyzed the construction cost, construction period, and change order performance for civil infrastructures for which post evaluation was performed. The analysis was conducted by dividing civil engineering facilities by type, construction nature, construction cost, contract nature, and delivery method. Planned and actual construction cost and period were compared during the planning, design, and construction process of civil engineering facilities. There is a possibility of input errors in project performance data, this paper proposes to the post-evaluation center should perform post-evaluation. Also, post-evaluation implementation guidelines for change orders should be revised. Additionally, further analysis of each facility was proposed through continuous data collection.

A Study on Improvement of Order System for Survey Service (측량용역 발주제도 개선에 관한 연구)

  • Park, Tai-Sik;Han, Soung-Man
    • Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
    • /
    • 2008.10a
    • /
    • pp.236-242
    • /
    • 2008
  • 설계용역과 통합하여 발주되는 측량용역의 입찰 제도를 보면 계획기관에서 설계예산서를 작성하여 해당 부처 분임경리관을 경유하여 공개경쟁입찰 또는 입찰참가자격제도(PQ) 등으로 발주하게 된다. 이 과정에서 측량용역과 설계용역을 분리하지 않고 측량용역 비를 설계용역비에 통합예산으로 발주 처리하고 있어 측량회사는 설계용역사로부터 불법으로 하도급 받고 있다. 설계용역회사는 엔지니어링등록과 측량업(공공측량)을 동시에 등록하여 용역수주를 하므로 기술력이 부족한 측량용역을 당연히 저가하도급으로 처리하는 커다란 모순이 발생하고 있다. 따라서 저가하도급으로 인한 측량성과의 부실은 건설공사의 부실시공으로 이어져 커다란 공사비손실과 안전 및 유지관리에 큰 문제점을 야기하고 있다. 이와 같은 문제점을 해결하기 위하여 본 연구에서는 측량용역 등록업체의 현황 및 현행 발주제도 방법 등의 분석을 통하여 발주제도의 개선방안을 제안하고자 한다.

  • PDF

A Study on Estimating Method for Actual Unit Cost Based on Bid Prices in Public Construction Projects (시설공사 입찰단가를 활용한 실적단가의 산정 방안에 관한 연구)

  • Kang, Sang-Hyeok;Park, Won-Young;Song, Soon-Ho;Seo, Jong-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.159-166
    • /
    • 2006
  • It was found that Korean Standard of Estimate which has been used as the only basis of cost estimate of public construction projects had some side effects such as jerry-build construction and over-estimation because it failed to reflect the current price and the state-of-the-art construction methods in a changing construction environment. Therefore, the government decided to gradually introduce historical construction cost into cost estimate of public construction projects from 2004. This paper presents analytic criteria and a process model for deducing more current and reasonable historical construction cost for contract items from not only previous contract prices but also all of the other bid prices that were not contracted. The procedure of estimating actual unit cost proposed in this paper focuses on the removal of abnormal values including strategically too low or high prices and the time correction. In addition, basic research is conducted for the correction of actual unit cost through the analysis of fluctuation of bid price depending on bidding types and rates of successful bid. It is anticipated that the effective use of the proposed process model for estimating actual unit cost would make the cost estimation more current and reasonable.