A Comparative Analysis on Safety Evaluation System and Requirement in the Tendering Process of Public Construction Projects - Cases of Singapore and Japan -  

Park, Hee-Taek (중앙대학교 건축학과)
Oh, Chi-Don (중앙대학교 건축학과)
Park, Chan-Sik (중앙대학교 건축학부)
Choi, Jin-Woo (산업안전보건연구원)
Publication Information
Korean Journal of Construction Engineering and Management / v.14, no.4, 2013 , pp. 130-139 More about this Journal
Abstract
Construction accident rates are reflected in the pre-qualification of public construction projects in order to prevent accidents and facilitate the safety management of construction companies. However, the construction industry is still experiencing an increase in accident rates. Hence, there is a need to strengthen existing safety evaluation systems and requirements in public construction tendering. The objective of this study was to acquire and provide basic data for benchmarking to select tenderers in domestic public construction projects. In Singapore and Japan, safety evaluation systems and requirements are applied based on various aspects in order to screen tenderers. These evaluation systems include safety regulations and institutional requirements, as well as safety performance and safety management plans of respective construction projects. This study recommends that korean public construction projects also apply similar safety evaluation systems which include comprehensive safety criteria in order to decrease accident rates in the industry.
Keywords
Public Construction Tendering Process; Safety Evaluation System; Safety Evaluation Requirement;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 여상구.이현철.고성석 (2010). "기술제안입찰형 최고가치 낙찰제도 입찰자 평가체계에 관한 연구." 한국건설관리학회 논문집, 제11권 제2호, 한국건설관리학회, pp. 124-136   과학기술학회마을   DOI   ScienceOn
2 조달청 (2012). 국가를 당사자로 하는 계약에 관한 법률 시행령, 법제처
3 조달청 (2009). 입찰참가자격 사전심사세부기준
4 조달청 (2012). 조달청 시설공사 적격심사세부기준
5 최민수 (2009). 기술제안입찰제도의 발전 방향, 한국건설산업연구원
6 최민수 (2009). 정부 입찰제도 개선안의 평가 및 향후 추진 방향, 한국건설산업연구원
7 최민수 (2010). 최저가낙찰제 및 저가심의제도의 개선방향, 한국건설산업연구원
8 최민수.김영덕.이승우.이양승.김원태.최은정 (2013). 종합평가방식의 최고가치낙찰제 도입 방안, 한국건설산업연구원
9 HDB, Evaluation Using Price Quality Method
10 LTA, Construction of Stations EW33. EW32 and Viaducts for Tuas West Extension
11 LTA, Contract ER405 Wiedning of Upper Paya Lebar Road from Upper Serangoon Road to Bartley Road
12 Ng Cher Cheng, Singapore Public Sector Procurement Framework, Building & Construction Authority, 2010
13 Npark, Proposed Redevelopment of Parkland
14 高大 元也 (2012). 公共工事発注者の安全配慮に関する実熊と課題, 労働安全衛生研究所
15 厚生労働省 (2012). 平成24年における労働災害発生状況
16 심규범 (2005). PQ의 재해율반영제도 개선 시급하다-현행 제도산재 은폐 등 부작용 심각 사전적 예방노력 촉진방안 강구해야, 건설저널, Vol. 50, 한국건설산업연구원, pp. 14-16
17 김순영.한충희.백태룡.김균태.이준복 (2009). "원도급 측면에서의 저가하도급 판정기준의 문제점과 개선방안." 한국건설관리학회 논문집, 제10권 제6호, 한국건설관리학회, pp. 107-116
18 박광배.김혜원 (2010). 건설업 환산재해율 활용 개선방안, 대한건설정책연구원
19 심규범 (2002). 건설산업의 재해율 산정 및 활용의 문제점과 개선방향, 한국건설산업연구원