A Study of Construction Methods for Quality and Productivity Enhancement of Form Works in the Bearing Wall Systems (벽식구조 거푸집공사의 품질 및 생산성향상을 위한 공법개선 연구)

  • Lee Jung-Ho;Joo Jin-Kyu;Kim Sun-Kuk;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.523-526
    • /
    • 2002
  • In the bearing wall systems, a form work has a lot of room that saves cost because it takes a substantial proportion of construction cost. Therefore the systemic and efficient methods are required in the form work. This study focuses on methods that enhance the quality and the productivity of form work and presents the kicker form as an alternative plan to simplify the form work through being modular and automatical it. Work sampling method is used for productivity measurement. It is expected that it will reduce the work process and improve the Qualify and the podructivity of construction.

  • PDF

A Study to Analyze the Assembly Process of Precast Concrete Wall Panels in Beam-Column Frame Apartment Buildings (보-기둥구조 PC공동주택 PC벽체의 조립공정 분석 연구)

  • Kim, Ki-Ho;Lee, Bum-Sik;Kim, Min-Jun;Lee, Dong-Gun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.4
    • /
    • pp.495-506
    • /
    • 2024
  • Unlike reinforced concrete(RC) construction, the primary determinant of construction schedule for precast concrete(PC) apartment buildings is the lifting equipment. To establish a dry process-centric construction schedule, this study analyzes the lifting unit process for core, internal, and external PC wall components, which differ from traditional PC components. By examining the assembly process of these wall types, the study aims to determine the construction cycle for a standard floor frame of a PC apartment building. The findings will serve as foundational data for developing construction schedules for PC apartment buildings utilizing PC walls.

An Analysis of 3D Printing Activities for Vertical Structure of Small Building (소형건축물 수직골조 대상 3D 프린팅 액티비티 분석)

  • Park, Hyeong-Jin;Ju, Gi-Beom;Seo, Myeong-Bae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.308-309
    • /
    • 2018
  • Construction automation is needed to improve construction productivity. 3D printing is a key technology of the 4th industrial revolution, and when applied to the construction field, the ripple effect is very large. In this paper, we propose a 3D printing method that can predict the 3D printing process and estimate the construction duration for each process. Through literature review and expert consultation, eight 3D printing activities for structure work were derived. Construction duration and cost estimation for each activity will be needed in the future research.

  • PDF

3D Rebar Placing and Drawing System (3차원 배근 설계 및 배근시공도 작성 시스템)

  • Lee, Byeong-Kwun;Kim, Chee-Kyeong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.529-532
    • /
    • 2010
  • 본 연구에서는 철근가격 급등과 배근시공도 작성 인력 부족에 대비하여 SDM# 제품군을 사용하여 이음/정착을 고려한 3차원 철근 배근 자동화 기술(RAP)로 철근 배근 자동생성 및 배근시공도 작성 시스템을 개발하였다. 최근 철근가격 급등으로 인한 공사원가상승/인건비 상승/배근시공도 작성 인력 부족 등의 기존현황의 문제점 등을 SDM# 제품군의 철근 배근 자동화 기술(RAP)을 이용하여 자동 철근배근/배근시공도 작성/정밀 골조물량 산출/인력절감/시공 정밀도 향상/골조 공사비 절감 등의 효과와 기존의 현장가공으로 인한 철근 손실률 8%를 공장가공을 적용함으로써 3% 수준으로 낮출 수 있어 5% 내외의 절감효과를 얻을 수 있다. 철근현장가공에서 공장가공 전환으로 골조물량 절감을 기대할 수 있고, 이음/정착/응력분포가 고려된 3차원 철근 배근 자동화 기술(RAP)을 이용하여 자동배근 알고리즘에 의한 배근시공도/가공도 작성 효율을 높이고, 기술 자립을 통해 건설시공 분야의 기술력 향상을 기대할 수 있다.

  • PDF

Case Study on Frame Work of Deck Floor in High Rise Apartments (고층 아파트의 데크층 골조공사 시공사례)

  • 이동환;권오홍
    • Magazine of the Korea Concrete Institute
    • /
    • v.14 no.6
    • /
    • pp.96-101
    • /
    • 2002
  • 최근 들어 기술ㆍ설계능력의 비약적 발전과 부동산 수요증가에 따른 지가 상승 및 용지 부족으로 인한 부지의 효율적 이용 방안으로 각종 건축물의 대형화, 고층화, 다양화가 되어 고밀도 철근배근의 건축 구조물은 점차 증가하고 있는 실정이다.(중략)

Building construction process improvement using prefabricated materia (공업화자재의 활용을 통한 공정합리화)

  • Yoon You-Sang;Lee Hyung-Soo;Suh Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.1 s.13
    • /
    • pp.90-96
    • /
    • 2003
  • The purpose of this study is to present an improvement building construction process by using prefabricated materials. The current slab form work has waste factor by unnecessary process and not complete integration with the finishing process. Therefore the study used value stream analysis methodology for effective improvement of slab form work process. The main contents of the study are as follows; 1) Non-value adding activities were found at existing slab form work process by current state mapping(CSM) 2) Future state mapping(FSM) suggest process Integration to slab form work. 3) Slab form work is analyzed reduction time-cost by prefabricated material. The study recommends that, as a future research, development of tool and technique for the non-value adding activities are eliminated in building construction and application of prefabricated material should be increased.

Identifying Construction Engineering Tasks at the Design Phase for Enhancing Constructability in High-rise Building Construction - Focused on Temporary Work - (고층 건축공사의 시공성 향상을 위한 설계단계의 시공엔지니어링 업무 도출 - 가설공사를 중심으로 -)

  • Lee, Jin-Woong;Cho, Kyu-Man;Kim, Tae-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.5
    • /
    • pp.453-463
    • /
    • 2017
  • Due to the increase in the size of buildings and scale, the importance of construction engineering that reflects the constructability from the design stage of the project is increasing. Especially, engineering efforts related to facilities, equipment and construction methods for temporary work at the design stage can significantly contribute to improvement of constructability and project performance. The purpose of this study is to derive construction engineering tasks on temporary work at the design phase of the high-rise building projects. 27 preliminary tasks were firstly investigated through literature review and experts' group interview, and the necessity and importance analysis of each tasks were then performed based on questionnaire survey. Most of the tasks related to plans on structural framework and lifting equipment were analyzed as relatively more important ones. Lastly, 21 engineering tasks, which are classified into 5 factors, were proposed through factor analysis. The factors were determined as 1) structural framework, measurement and circulation, 2) lifting equipment and pumping, 3) space zoning, 4) water supply, 5) temporary facility, electric power supply and lighting. The results of this study can be used as basic data for establishing efficient work process of construction engineering on temporary work at the design phase.

The Productivity Analysis by Slab Formwork of Structural Frame Work in Tall Building Construction (초고층 골조공사의 바닥 거푸집별 생산성 분석;기준층 3일 공정을 중심으로)

  • Kim, Tae-Hoon;Shin, Yoon-Seok;Cho, Seong-Soo;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.11a
    • /
    • pp.115-118
    • /
    • 2007
  • A tall building construction is needed to reduce the construction duration for project profitability. Reducing the cycle time of typical floor in the structural frame work which have the largest duration in the whole construction, greatly affects construction duration. Nowadays, some projects are accomplished in the 3 day cycle. In order to accomplish efficiently 3 day cycle, productivity information of similar projects is supported. Therefore, this study proposed labor productivity and application by slab formwork to construct by the 3 day cycle. In order to perform an analysis, we selected 3 cases and analyzed the labor productivity on the basis of the amount of slab forms, labors, and durations. Then, we performed the questionnaire to analyze the application by formwork of tall building construction engineers. This study will contribute to establish a reasonable scheduling in structural frame work of a new similar project.

  • PDF

A Study on Analysis and Improvement of Furniture Work for Just-in-Time (적시생산방식을 이용한 가구공사 개선방안에 관한 연구)

  • Kim Hyun-Woo;Song Young-Woong;Ahn Jae-Bong;Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.71-78
    • /
    • 2004
  • In this study, the concept of Just-In-Time, Lean Construction and Supply Chain Management have been applied to furniture works of high-rise residental building. For the purpose of systematic furniture work planning, it should be established to analyse furniture-work process from design phase through contract, and procurement to construction phase. The analysis of process and data for furniture-work provides the roles of conducting subjects and presents management items at each phase. This proposal will provide the systematic furniture-work managements and reduce construction time and cost, and also raise the quality of furniture works.