• Title/Summary/Keyword: 계통계획

Search Result 456, Processing Time 0.027 seconds

Development of a Verification Tool in Radiation Treatment Setup (방사선치료 시 환자자세 확인을 위한 영상 분석 도구의 개발)

  • 조병철;강세권;한승희;박희철;박석원;오도훈;배훈식
    • Progress in Medical Physics
    • /
    • v.14 no.3
    • /
    • pp.196-202
    • /
    • 2003
  • In 3-dimensional conformal radiation therapy (3D-CRT) and intensity-modulated radiation therapy (IMRT), many studies on reducing setup error have been conducted in order to focus the irradiation on the tumors while sparing normal tissues as much as possible. As one of these efforts, we developed an image enhancement and registration tool for simulators and portal images that analyze setup errors in a quantitative manner. For setup verification, we used simulator (films and EC-L films (Kodak, USA) as portal images. In addition, digital-captured images during simulation, and digitally-reconstructed radiographs (DRR) can be used as reference images in the software, which is coded using IDL5.4 (Research Systems Inc., USA). To improve the poor contrast of portal images, histogram-equalization, and adaptive histogram equalization, CLAHE (contrast limited adaptive histogram equalization) was implemented in the software. For image registration between simulator and portal images, contours drawn on the simulator image were transferred into the portal image, and then aligned onto the same anatomical structures on the portal image. In conclusion, applying CLAHE considerably improved the contrast of portal images and also enabled the analysis of setup errors in a quantitative manner.

  • PDF

Elicitation of drought alternatives based on Water Policy Council and the role of Shared Vision Model (협의체 기반 가뭄 대응 대안 도출과 비전공유모형의 역할)

  • Kim, Gi Joo;Seo, Seung Beom;Kim, Young-Oh
    • Journal of Korea Water Resources Association
    • /
    • v.52 no.6
    • /
    • pp.429-440
    • /
    • 2019
  • The numbers of multi-year droughts due to climate change are increasing worldwide. Boryeong Dam, located in Chungcheongnam-do, South Korea, was also affected by a 4-year drought from 2014 to 2017. Since traditional unilateral decision making processes to alleviate drought damage have, until now, resulted in conflicts between many of the involved groups, the need for active participation from both stakeholders and policymakers is greater than before. This study introduced Shared Vision Planning, a collaborative decision making process that involves participation from various groups of stakeholders, by organizing Water Policy Council for Climate Change Adaptation in Chungcheongnam-do. A Shared Vision Planning Model was then developed with a system dynamics software by working together with relevant stakeholders to actively reflect their requests through three council meetings. Multiple simulations that included various future climate change scenarios were conducted, and future drought vulnerability analysis results of Boryeong Dam and districts, in terms of frequency, length, and magnitude, were arrived at. It was concluded that Boryeong Dam was more vulnerable to future droughts than the eight districts. While the total water deficit in the eight districts was not so significant, their water deficit in terms of spatial discordance was proved to be more problematic. In the future, possible alternatives to the model will be implemented so that stakeholders can use it to agree on a policy for possible conflict resolutions.

A Study on the Interface between DAS and SCADA by using Direct Method (직접연계방법에 의한 DAS-SCADA 연계 연구)

  • Park, So-Young;Shin, Chang-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.9 no.5
    • /
    • pp.1154-1163
    • /
    • 2008
  • DAS and SCADA system are main systems, which operate and manage the power system by using computer and communication technology. But DAS and SCADA have been operated independently in Korea, so there was some time delay in the fault handling and live-line work. To improve that problems, studies on the interface between DAS and SCADA have been needed. From November 2005 to December 2007, the pilot project has been performed in KEPCO's branch offices, as a result, direct method will be applied widely all over the country until 2010 because the operation information of substation users want can be transmitted fast and it is possible to control 43RC directly although the expense for direct method is about 1.3 times larger than that for web method. To improve problems revealed during the pilot project, substation object to object communication method is proposed and interface database automatic generation and interface system diagnosis and logging functions are developed. Interface data point and communication data type are defined, substation single line diagram automatic generation or manual editing function, SCADA monitoring and controlling function, log data managing function are developed in SCADA HMI program. It is expecting to reduce the average time for each outage about 33% and to improve the reliability, efficiency of operation, execution of DAS from automatic load transfer under a fault, and to contribute to export project.

C00rdinated Testing between transformer Tap Selection and Inverter Voilage Control in the PV Distributed Generation system (태양광 분산 발전 시스템의 계통연계용 변압기탭 선정과 인버터전압조정 협조시험)

  • Yoon, kap koo;CHO, SeongSoo
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.1098-1099
    • /
    • 2015
  • ${\bullet}$ 시험대상: 영월태양광 4,990kW(998kW ${\times}$ 5호) ${\bullet}$ 13.07.31 연계기술검토의뢰 ${\bullet}$ 13.08.28 한전검토결과: 인근변전소 영월S/S(40MW) 초과로 10.8km 지점의 평창 D/L 평창간 347호 주진S/S에 다음의 보완대책과 연계 권고 ${\cdot}$ 문제점: 적정전압이탈 및 순시전압변동률 유지불가 ${\cdot}$ 연계기준만족을 위해 한전에서 제시한 보완대책 : 계통용량증설(설비보강), 연계용량 감소 및 전용선로 연계 ${\bullet}$ 14.01.09 분산형설치자의 용역사(에이스기술단)에서 송배전용전기설비 이용규정과 연계기준 만족을 위한 보완대책 제안 ${\cdot}$ 태양광발전시스템 인버터 자동전압(역률/무효전력) 조정기능 및 감시설비 구비 ${\cdot}$ 최적 공통연결점 선정: 분산형전원으로 부터 전기적으로 가장 가까운 영월D/L 영월S/S측에 개폐장치설치 하고 주진S/S 측으로 연계 ${\bullet}$ 14.01.29~06.19 한전(전력연구원)의 유효성 검토 ${\cdot}$ 보완대책 기술적 유효(실증시험 시행 후 시행공문 발송 예정) ${\bullet}$ 14.08.08 송배전용전기설비 이용규정 개정에 따른 협의 ${\cdot}$ 변압기 대당 20MW에서 25MW ${\cdot}$ 변전소 전체 60MW에서 75MW까지 허용 ${\cdot}$ 영월 S/S 측 문곡/영월 D/L 연계 공사 협의 ${\bullet}$ 14.10.04 사용전검사, 한전계통연계운전 시작 ${\bullet}$ 인버터 고정역률(99.9~100%) 운전 시험 ${\cdot}$ 14.11.21 22.9kV 계전기(SEL-751) 5대, 15분 간격 자료저장 ${\cdot}$ SEL-751/USB to RS232C/노트북 15분간격 측정(첨부) ${\bullet}$ 14.03.07 인버터 역률 95.0% 조정 15분간격 측정(첨부) ${\bullet}$ 변압기탭 선정과 인버터전압조정협조시험 계획 ${\cdot}$ 변압기탭을 현장에서 상하 1탭씩 변경 ${\cdot}$ 인버터역률을 인버터공급사에서 원격조정 ${\cdot}$ 22.9kV 보호계전기 SEL-751, 15분 간격 측정 ${\cdot}$ 인버터 370V 계전기 K-PAM DG3000/현장감시설비 연계 ${\cdot}$ 15분 간격 측정 저장 ${\cdot}$ 현장감시설비/인터넷 연결 원격측정(첨부예정)

  • PDF

A Study on Revising Train Departure Time for Reducing Electric Power Consumption (전력소비완화를 위한 전동열차 출발시간 조정에 관한 연구)

  • Kim, Kwang-Tae;Kim, Kyung-Min;Hong, Soon-Heum
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.2
    • /
    • pp.167-173
    • /
    • 2011
  • This paper considers the problem of revising train departure time to reduce electric power consumption of mass rapid transit (MRT) railways. The motion of a train running between stations is divided into three phases: traction, coasting, and deceleration phases. The traction phase requires high electric power to operate MRT railways. In the coasting phase, the train moves stably by consuming little or no power. The deceleration phase is a braking mode and produces some electric power called regenerated brake power owing to inertia force for the train generated In the traction and coasting phases. The regenerative energy can be used by other accelerating trains within a specific range from the train and thereby the power consumptions of train can be reduced. We developed a mixed integer programming model to solve the problem. To validate the suggested model, a computational experiment was conducted using real data from Korea Metropolitan Subway.

A Study on the Characteristic of Power Consumption and Design of the Electrical Installations for the Inverter Controlled Elevator (인버터제어 승강기의 전력소비 특성과 전원설비 계획에 관한 연구)

  • 이기홍;성세진
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.15 no.2
    • /
    • pp.57-63
    • /
    • 2001
  • This paper analysed the characteristic of Power consumption at many type of Inverter controlled Elevator. Especially, this paper proposed the standard value of full load currents. For this propose, it was classified by the passenger capacity and manufacture company. As a result, it is found that (i) the value is between -3[A] and 7[A] in case of elevator. That means the full load currents was smaller than the standard value of conventional operation type (ii) the value is between 0.5[kVA] and 3[kVA] in case of Power transformer. That means the transformer capacity was smaller than the standard value of conventional operation type. it was classified by the passenger capacity at inverter controlled elevator in apartment Also, to guarantee the operation stop of inverter controlled elevator, this paper proposed the redundancy method of electrical installations. the redundancy method is (i) 2 line service system and (ii) 2 distribution line system.

  • PDF

Development of Economic based Optimal Operation Program for Microgrid (경제성 기반의 마이크로그리드 최적운영 프로그램 개발)

  • Lee, Hak-Ju;Cha, Woo-Ku;Song, Il-Kun;Yoon, Yong-Tae
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.23 no.12
    • /
    • pp.106-114
    • /
    • 2009
  • This paper addresses unit commitment for microgrid optimization including renewable energy sources, working under deregulated power market. As microgrid supplies both heat and electricity for consumer, operational optimization must be done to meet their demand economically. So renewable energy sources are considered to be negative load, and batteries are used as the load flattening device to raise possibly operational function. In the state of solution, the program is developed to solve out the maximum profit of microgrid using dynamic programming method. Finally, its validity is verified through case study in isolation mode and interconnected mode. The S/W will be used to operate microgrid economically after the market of microgrid is formed.

Evaluation of Setup Uncertainty on the CTV Dose and Setup Margin Using Monte Carlo Simulation (몬테칼로 전산모사를 이용한 셋업오차가 임상표적체적에 전달되는 선량과 셋업마진에 대하여 미치는 영향 평가)

  • Cho, Il-Sung;Kwark, Jung-Won;Cho, Byung-Chul;Kim, Jong-Hoon;Ahn, Seung-Do;Park, Sung-Ho
    • Progress in Medical Physics
    • /
    • v.23 no.2
    • /
    • pp.81-90
    • /
    • 2012
  • The effect of setup uncertainties on CTV dose and the correlation between setup uncertainties and setup margin were evaluated by Monte Carlo based numerical simulation. Patient specific information of IMRT treatment plan for rectal cancer designed on the VARIAN Eclipse planning system was utilized for the Monte Carlo simulation program including the planned dose distribution and tumor volume information of a rectal cancer patient. The simulation program was developed for the purpose of the study on Linux environment using open source packages, GNU C++ and ROOT data analysis framework. All misalignments of patient setup were assumed to follow the central limit theorem. Thus systematic and random errors were generated according to the gaussian statistics with a given standard deviation as simulation input parameter. After the setup error simulations, the change of dose in CTV volume was analyzed with the simulation result. In order to verify the conventional margin recipe, the correlation between setup error and setup margin was compared with the margin formula developed on three dimensional conformal radiation therapy. The simulation was performed total 2,000 times for each simulation input of systematic and random errors independently. The size of standard deviation for generating patient setup errors was changed from 1 mm to 10 mm with 1 mm step. In case for the systematic error the minimum dose on CTV $D_{min}^{stat{\cdot}}$ was decreased from 100.4 to 72.50% and the mean dose $\bar{D}_{syst{\cdot}}$ was decreased from 100.45% to 97.88%. However the standard deviation of dose distribution in CTV volume was increased from 0.02% to 3.33%. The effect of random error gave the same result of a reduction of mean and minimum dose to CTV volume. It was found that the minimum dose on CTV volume $D_{min}^{rand{\cdot}}$ was reduced from 100.45% to 94.80% and the mean dose to CTV $\bar{D}_{rand{\cdot}}$ was decreased from 100.46% to 97.87%. Like systematic error, the standard deviation of CTV dose ${\Delta}D_{rand}$ was increased from 0.01% to 0.63%. After calculating a size of margin for each systematic and random error the "population ratio" was introduced and applied to verify margin recipe. It was found that the conventional margin formula satisfy margin object on IMRT treatment for rectal cancer. It is considered that the developed Monte-carlo based simulation program might be useful to study for patient setup error and dose coverage in CTV volume due to variations of margin size and setup error.

Wind Power Smoothing Control Technique using Energy Storage System (에너지저장장치를 이용한 풍력발전의 출력 평준화 제어 기법 연구)

  • Lee, Jinho;Lee, Moonhwan
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.11a
    • /
    • pp.178.1-178.1
    • /
    • 2010
  • 기후변화 대응을 위해 세계적으로 신 재생에너지의 분담율(penetration rate)은 갈수록 증가하고 있고, 정부에서는 2015년까지 신 재생에너지의 개발에 총 40조원을 투자한다는 적극적인 계획을 세우고 있다. 하지만 신 재생에너지 중 전력 생산에 가장 큰 비중을 차지하는 풍력발전은 비급전성과 간헐성 등의 제약으로 인해 안정적인 전력을 공급하기 힘들뿐만 아니라 전력계통의 신뢰성을 악화시킬 수도 있는 리스크를 잠재하고 있는 에너지원이다. 이에 풍력발전 등 신 재생에너지원의 출력을 안정화시키기 위한 Smart Renewable 프로젝트가 현재 제주도에서 실증 단계에 있다. 이 논문에서는 한국전력 컨소시엄의 Smart Renewable 프로젝트 대상인 660kW급 풍력터빈과 200kWh급 리튬-이온 배터리 에너지저장장치를 이용하여, 풍력터빈의 출력을 평활화시키는 평활화 제어(Smoothing Control)와 일정시간동안 균일한 출력을 낼 수 있게 하는 정출력 제어(Constant Power Control)의 두 가지 기법을 시뮬레이션 하였다. t 시점의 에너지저장장치 잔존용량을 피드백 받아 t+1 시점의 풍력터빈과 에너지저장장치 합성출력의 목표치를 설정하는 잔존용량 피드백 방법을 이용하여 에너지저장장치의 운전모드, 초기 용량, 평활화 시정수(time constant) 등의 조건 변화가 평활화 제어와 정출력 제어에 미치는 영향을 각각 확인하고, 주어진 기기 조건 하에서 최적의 시정수 값과 운전모드를 도출하였다.

  • PDF

Settlement Technique of Constrained On/Off Compensation Amount using Surplus Function in Electricity Market (잉여함수를 이용한 전력시장에서의 제약보상금액 정산기법)

  • 국경수;문영환;오태규
    • Journal of Energy Engineering
    • /
    • v.11 no.4
    • /
    • pp.324-331
    • /
    • 2002
  • ln competitive electricity market, useful technique would be required to calculate settlement amount for electric power traded between market participants and KPX since a number of market partici-pants would appear and trade electric power. Especially calculation of constrained on/off compensation amount can be complicated, and needs to be understood clearly by market participants to avoid unnecessary disputes. This paper presents a technique to settle more easily constrained on/off compensation amount using surplus function. In this technique, a surplus is calculated by each dispatched values and then the compen-sation amount is calculated by the difference of each surpluses. By doing this, settlement amount can be cal-culated by summing the trading amount and the compensation amount.