A Study on the Construction of Computerized Algorithm for Proper Construction Cost Estimation Method by Historical Data Analysis (실적자료 분석에 의한 적정 공사비 산정방법의 전산화 알고리즘 구축에 관한 연구)

  • Chun Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.192-200
    • /
    • 2003
  • The object of this research is to develop a computerized algorithm of cost estimation method to forecast the total construction cost in the bidding stage by the historical and elemental work cost data. Traditional cost models to prepare Bill of Quantities in the korea construction industry since 1970 are not helpful to forecast the project total cost in the bidding stage because the BOQ is always constant data according to the design factors of a particular project. On the contrary, statistical models can provide cost quicker and more reliable than traditional ones if the collected cost data are sufficient enough to analyze the trends of the variables. The estimation system considers non-deterministic methods which referred to as the 'Monte Carlo simulation. The method interprets cost data to generate a probabilistic distribution for total costs from the deficient elemental experience cost distribution.

A Task Information Framework for Daily Report Management (작업일보 관리를 위한 단위작업 정보체계 분석)

  • Kang Woo-Young;Chin Sang-Yoon;Kim Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.513-516
    • /
    • 2003
  • With the size of construction projects getting larger and more complex, the amount of information is increased exponentially. Although there are a lot of construction companies that try to accumulate as-built information from construction sites. it has not been quite satisfactory. This is due to the lack of task information framework that can measure project performance and collect as-built information. Therefore the objective of the paper is to identify the information that can be derived from daily reports and to suggest a unit task information framework to accumulate as-built information.

  • PDF

기존 인사평가시스템의 효율화를 위한 설계와 재구축

  • Gwon, Seon-Haeng;Gang, Gyeong-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2009.04a
    • /
    • pp.371-380
    • /
    • 2009
  • 본 연구는 국내에 있는 한 금융사에서 사용하고 있는 기존 인사평가시스템을 사례로 하여 시스템 운영자와 사용자(모든 임직원)가 시스템을 효율적으로 운영하고 사용할 수 있도록 인사평가시스템을 재구축하였다. 새로 구축될 인사평가시스템의 효율을 보다 높이기 위해 인사평가 업무와 평가 절차를 분석하고 그러한 평가체계를 기존 legacy 시스템(인사평가시스템)에 어떻게 반영이 되었는지도 분석하였다. 해당 금융사는 기존 평가시스템을 통하여 임원과 직원뿐 아니라, 비정규직원까지 년마다 상반기와 하반기로 나누어 업적과 역량평가를 각각 두번씩 실시하고 있었다. 평가결과는 나중에 보상이나 승진 시에 중요한 고과자료로 활용하고 있었다. 업적과 역량평가 뿐만 아니라, 신업사원을 대상으로 하는 정규직 수습평가와 계약직을 대상으로 한 역량평가 그리고 전직원이 대상인 다면평가도 실시하고 있었다. 그런데 여러 해에 걸쳐 인사평가를 실시하는 과정에서 평가프로세스가 여러 차례 변하였고, 많은 평가대상자를 평가하다 보니 예외적으로 처리해야 하는 경우도 발생하였다. 이런 변화와 예외적인 사항을 기존 Lagacy시스템에 반영하다 보니 평가데이터를 관리하는 테이블이 처음보다는 많이 늘어나게 되어 현재 약 170개에 달하고 있었다. 이렇게 많은 테이블 중에는 당시에는 사용했으나, 현재는 사용하지 않게 된 것도 포함되어 있었다. 프로그램 소스도 마찬가지로 새로운 요구사항과 많은 예외사항 처리로 인해 복잡해지고 프로그램 소스의 수도 늘어나게 되었다. 이로 인해 평가시스템 담당자는 시스템을 관리하기가 복잡해지고, 새로운 변화나 요구사항에 대응하기가 어려운 사항이었다. 그리고 담당자가 시스템 관리에 더 더욱 어려움을 겪게된 것은 시스템 담당자가 여러 번 바뀌는 과정에서 인수인계에 제대로 이루어 지지 않게 되었고 인사평가시스템 관리문서도 시스템 변화에 따른 히스토리 내용이 제대로 관리되지 못하고 있었기 때문이다. 그래서 이번 연구에서는 기존 legacy 시스템의 테이블과 프로그램 소스를 분석하여 방만하게 늘어날 데이터 관리 테이블을 효율적으로 줄이고, 예외적인 사항을 새로운 인사평가시스템에서 포괄적으로 수용할 수 있도록 재설계하였다. 또한 인사평가시스템 운영중에도 사용자(임직원)들로부터 있을 수 있는 예외적 요구사항을 미리 예측하여 운영담당자가 신속하고 정확하게 대응 할 수 있도록 하였다.

  • PDF

An Empirical Study on the Utilization and Activation of Electronic Trade by Korean Middle and Small Firms (${\cdot}$소 수출기업의 전자무역 활성화를 위한 영향요인 분석에 관한 연구)

  • Park Ki-Nam
    • The Journal of Society for e-Business Studies
    • /
    • v.10 no.2
    • /
    • pp.133-150
    • /
    • 2005
  • Electronic Trade is dramatically changing classical international trade paradigms. In particular, under the new economic environment, the ability to utilize and Information Technologies such as Electronic Data Interchange, Web-based EDI, ebXML, web service, Internet are emerging as an important factor in deciding the competitiveness of export business. The primary purpose of this study is (1) to investigate motivation factors and performance factors of electronic trade, (2) to show the relationship between motivation factors and the level of the utilization of e-trade, (3) to reveal the relationship between the level of the utilization and performance factors of e-trade. Analysis of survey questionnaire of Korean middle and small companies indicates the following : (1) motivation factors such as cost factor, education and promotion and the search of new market, have positive effect on the level of utilization of e-trade. (2) the level of utilization of e-trade has positive effect on the performance factors such as cost factor, the search of new market, the improvement of task process.

  • PDF

Problem Analysis and Improvement Strategy for Feasibility Analysis of Overseas Plant Construction Projects (해외 플랜트 건설사업의 타당성 분석 문제점 및 개선방안)

  • Lee, Won-Gyu;Park, Moon-Sun;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.5
    • /
    • pp.3-14
    • /
    • 2010
  • This study investigated and analyzed feasibility analysis case studies, carried out by contractor of EPC LSTK projects in the planning stage to suggest the strategies to solve problems for project improvement. For this, five feasibility analysis case studies of gulf cooperation council (GCC) countries were reviewed and investigated. The results can be summarized as follows: 1) Those factors needed to be analyzed, including cost increase, project delay, quality decrease were insufficiently considered when assessing feasibility. 2) And improvement strategies for three problems mentioned above were suggested based on findings in feasibility analysis. 3) Lastly the process of the project feasibility analysis that can be applied to overseas plant construction project was suggested step by step.

A Development of Integrated Risk Management Model of Large Construction Projects (건설분야 통합 리스크관리에 관한 구성 모델)

  • Kim Chang-Hak;Park Seo-Young;Kang In-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.101-108
    • /
    • 2004
  • The results of the study include a computerized system and a systematic Process model for risk management and analysis. This study analyzes the present status of risk management in the construction industry, and then suggests reasonable methods for improved risk management plans. This study defines risk management procedures as preparation, identification, analysis, response and management to manage potential risks In the construction project. The modules for computerizing this system consist of planning, construction, application of WBS (Work Breakdown Structure) and RBS (Risk Breakdown Structure), and risk analysis. The method logy for analyzing construction risk uses fuzzy theory, and the scope of developed system is focused to the contractors. The risk management system suggested in this study operates on the Internet, for providing contractors with a useful risk management tool by online system, with web-based menus that is helpful for practical application.

  • PDF

A Fundamental Study on the Development of Indicators for the Assessment of Design Quality (건축설계 품질 평가지표 개발을 위한 기초연구)

  • Choi, Yeon-Ju;Yi, June-Seong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.584-587
    • /
    • 2006
  • Quality assessment of the building is strongly dependent upon satisfying owner's requirements. To develop indicators for the assessment of design quality, survey on current situation of design process and analysis of Design Quality Indicator(DQI) is performed. The survey revealed that the main cause of frequent design changes is variability feature of owner's requirements. DQI, an indicator developed in UK, questionnaire encompasses questions which are relevant throughout the development stages of a building, and can be used at every key stage of the process. Further research will focus on the development of indicators for the assessment of design quality applicable to Korean market. In addition, research on the visualization method to present assessment results and supporting tools to facilitate assessment will be considered.

  • PDF

A Study on Composition and Application of Risk Management Planning and Procedure for Successful Overseas Construction Projects - Based on the PRINCE2 Methodology in the UK - (성공적인 해외 건설 프로젝트 수행을 위한 리스크 관리 계획·절차 구축 및 활용 방안에 대한 연구 - 영국의 사업관리 기법인 PRINCE2를 기반으로 -)

  • Kang, Sinbong;Kim, Seungchul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.48-55
    • /
    • 2016
  • Risk management is an important element for successful management of overseas construction projects. This study reports a case study in which we proposed a risk management planning and procedure for plant construction which can be applied throughout the project life cycle. We analyzed the risk management practices of Korean construction companies by applying the concept of the PRINCE2 method developed in the UK, and proposed a risk management planning and procedure with organizational structure and working process. The suggested risk management planning and procedure was applied to an overseas plant construction project, and produced good results. It is believed that the procedure suggested here can also be aplied to other companies to enhance the competency in the global construction market.

A Study on the Outcome of International Trade Practice in Commitment of Electronic Trade (전자무역의 몰입이 무역업무성과에 미치는 영향에 관한 연구)

  • Lee, Jeong-Ho
    • International Commerce and Information Review
    • /
    • v.14 no.4
    • /
    • pp.545-562
    • /
    • 2012
  • This study tried to analyzed the relationship outcome and commitment in order to suggest to a outcome for commitment decision-making of e-trade. 6 hypothesis were constructed for analysis based on previous literature review. The subject of this study is to analyse on electronic trade practice outcome on the international trade practice commitment. This paper investigates the outcome determinants of e-trade commitment. There are 250 sended samples and 188 returns, 168 of them are analyzed on commitment for a electronic trade outcome. The first, multiple regression result shows that the international trade practice outcome are positively affected by the "Overseas market research commitment", "e-L/C Practice commitment", "Clearance Practice commitment", "e-B/L or global logistic commitment", "Payment or e-Nego commitment". However, The "Commerce practice commitment" factors does not affect in the electronic trade practice outcome.

  • PDF

Development of New Collaborative Key Performance Indicators in Manufacturing Collaboration Based on the SCOR Model (SCOR 모형에 기반한 새로운 제조협업의 협력적 성과지표 개발 및 측정)

  • Jung, Ji-Whan;Jung, Jae-Yoon;Shin, Dong-Min;Kim, Sang-Kuk
    • The Journal of Society for e-Business Studies
    • /
    • v.15 no.1
    • /
    • pp.157-171
    • /
    • 2010
  • To effectively maintain manufacturing collaboration, the development of effective performance measurements for the collaboration is required. Most existing key performance indicators however were developed to measure the performances of internal activities or outsourcing of a company. For that reason, it is necessary to devise new key performance indicators that the partners participating in the collaboration can arrange and compromise with each other to reflect their common goals. In this paper, we propose collaborative Key Performance Indicators(cKPIs), which is used to measure the collaboration work of multiple manufacturing partners on the basis of the Supply Chain Operations Reference(SCOR) model. Also, a modified Sigmoid function is devised as a desirability function to reflect the characteristics of Service Level Agreement(SLA) between two partners. The proposed indicators and the desirability functions can be utilized to perform and maintain the successful collaboration by providing a way to the quantitative measurement.