• Title/Summary/Keyword: 계약단계

Search Result 212, Processing Time 0.028 seconds

Research on International Technical Cooperation Relationship Process Model (국제기술협력 관계 프로세스 모형 개발에 관한 연구)

  • Kim, Jin-Suk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.11
    • /
    • pp.4796-4800
    • /
    • 2011
  • In this paper has been developed a process model for the international technical cooperation. Model consists of five steps: Beginning phase, Partner search phase, contract phase, execution phase and exit phaseInthe beginning phase. The industries need to know about their own require and in the partners search phase they have difficulty navigating partner and to find the fit partner. In agreement phase the industries have problme with international law and in the execution phase they have cultural difficulties. Therefore, the government may need to seek support programs for each step.

Development of Fairness Evaluation Index for the Construction Industry (건설산업의 공정성 평가지수 개발)

  • Lee, Chijoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.16-27
    • /
    • 2022
  • This study analyzed both the legal system regarding fair trade and the types of unfair trade in the construction industry. Then, it derived the factors with which to evaluate the level of fairness. These factors were classified by each type of participant in the construction industry, such as general contractors and subcontractors, and each construction stage, such as bidding, contracting, and construction. The perceived fairness level of factors was analyzed using a survey of 238 employees of general contractors and subcontractors. Next, the study developed a fairness index for the construction industry. The index showed that subcontractors perceived the level of fairness more negatively than general contractors, but both perceived the construction stage of the industry as having the lowest level of fairness. General contractors perceived the bidding and contracting stages as having the highest fairness levels, and subcontractors perceived the contracting stage as having the highest level of fairness. The developed fairness index identified the evaluation factors that need improvement and the fairness level perceived by each type of participant at each stage of construction. The results of this study can contribute to establishing measures that improve the level of fairness in the construction industry.

A Study on the Improvement of Architectural Design Contract Phase in the Overseas Construction Market through the Analysis of Inefficient Factors (효율성 저해요인 분석을 통한 건축설계분야의 해외건설 계약단계 개선방안에 관한 연구)

  • Lim, Jae-Bok;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.155-162
    • /
    • 2010
  • Following the successful entry of Korean builders into overseas construction markets, Korean architects have also become active abroad, and have expanded their market share centered on the Southeast Asia and Middle Eastern areas through Design-Build contracts. However, there have also been However, conflict can arise among the project applicants in the contract stage due to the special characteristics of overseas construction. This sometimes leads to the failure of a project. Using statistics and case studies, this study identified problems in the overseas construction market. It analyzed inefficient factors of the architectural design contract phase in the overseas through a survey and an interview of specialists. Based on the results, this study suggested a master architect system, and some resolutions to the problems of organizing an internal evaluation system. It is expected that the results can be used as practical data for companies that want to advance into the overseas market.

A Study of the Improvement for the Contract Types and Contract Category of the Weapon Systems (무기체계류 계약형태 및 계약종류 개선방안 연구)

  • Kim, Ki-Taek;Park, Hong-Rae;Cho, Yong-Gun
    • Journal of the military operations research society of Korea
    • /
    • v.34 no.3
    • /
    • pp.13-29
    • /
    • 2008
  • The purpose of this study is to propose a model of the contract type and contract category in the process of programs in each stage which is the procurement by defence improvement program of a large long term programs. When requiring the contract, contractor confirms the contract type and contract category of the review the contract in bulk, separate contract by repeatedly. For the study of improvement method we used previous research paper, reports of DAP A and KIDA, laws of contract and other several materials. and we also applied the rational contract type and contract category for the general mass production program weapon system based on the analysis of contract states concluded with DAPA and old-DAPA, and collect the public opinions of the defense industry.

스타트업의 벤처캐피탈 선택에 미치는 요인 연구

  • Kim, Jin-Su;Bae, Tae-Jun;Lee, Sang-Myeong
    • 한국벤처창업학회:학술대회논문집
    • /
    • 2020.06a
    • /
    • pp.39-44
    • /
    • 2020
  • 지금까지의 투자 의사결정 요인에 관한 연구는 벤처캐피탈 관점에서 이루어져 왔다. 벤처캐피탈이 투자할 만한 가치가 있는 스타트업을 선정하는 요인이 무엇인가 하는 것이 기존의 연구의 핵심이었다. 하지만, 최근 우수한 스타트업의 경우, 많은 벤처캐피탈이 투자를 하기를 원하면서, 오히려 능력 있는 스타트업들은 벤처캐피탈을 선별해서 투자를 받고 있는 현상이 나타나고 있다. 따라서 우수한 스타트업이 벤처캐피탈을 선택하는 결정 요인을 알아봐야 하는 시기가 된 것이다. 본 연구는 창업 초기단계(Series A) 창업가 4명, 중기단계(Series B/C) 창업가 3명을 인터뷰하여 스타트업이 벤처캐피탈을 선정하는 요인을 탐색하고자 한다. 연구 결과, 스타트업이 벤처캐피탈을 선정하는 주요 요인으로는 1) 계약내용, 2) 벤처캐피탈 명성(reputation), 3) 투자 심사역인 것으로 나타났다. 먼저, 초기 및 중기 단계의 스타트업 모두가 중요하게 생각하는 요인은 계약내용으로, 구체적으로는 가치평가 (valuation)와 우호적인 투자조건으로 나타났다. 다음으로, 벤처캐피탈의 명성 (reputation)의 경우, 벤처캐피탈이 지금까지 투자해 왔던 회사들의 면면 (portfolio)과 투자한 후, 후속 투자를 하는 경향 (Follow-on)을 중요시 하는 것으로 나타났다. 마지막으로, 벤처캐피탈을 선정할 때, 창업 초기 단계에서는 상대적으로 투자심사역의 영향이 컸고, 창업 중기 단계 이후로 갈수록 투자심사역 개인보다는 회사 차원의 벤처캐피탈의 영향력이 커짐을 발견하였다.

  • PDF

Legal Bases and Cases for the Form Requirement under PICC (국제상사계약에 관한 일반원칙(PICC)하에서 계약의 형식요건에 관한 법적 기준과 판결례)

  • Shim, Chongseok
    • International Commerce and Information Review
    • /
    • v.18 no.4
    • /
    • pp.143-164
    • /
    • 2016
  • PICC are dealing with form requirements of international commercial contract under writings in confirmation, conclusion of contract dependent on agreement on specific matters or in a particular form, contract with terms deliberately left open, merger clauses, modification in a particular form. If a writing which is sent within a reasonable time after the conclusion of the contract and which purports to be a confirmation of the contract contains additional or different terms, such terms become part of the contract, unless they materially alter the contract or the recipient, without undue delay, objects to the discrepancy. Where in the course of negotiations one of the parties insists that the contract is not concluded until there is agreement on specific matters or in a particular form, no contract is concluded before agreement is reached on those matters or in that form. If the parties intend to conclude a contract, the fact that they intentionally leave a term to be agreed upon in further negotiations or to be determined by a third person does not prevent a contract from coming into existence. A contract in writing which contains a clause indicating that the writing completely embodies the terms on which the parties have agreed cannot be contradicted or supplemented by evidence of prior statements or agreements. However, such statements or agreements may be used to interpret the writing. A contract in writing which contains a clause requiring any modification or termination by agreement to be in a particular form may not be otherwise modified or terminated.

  • PDF

법령과고시(3) - 지방계약법 시행령 개정

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.293
    • /
    • pp.98-99
    • /
    • 2014
  • 지방자치단체의 계약업무에 기초가 되는 지방계약법 시행령이 지난 11월 24일 공포되어 시행에 들어갔다. 이번 지방계약법 개정은 지난 해 12월 30일 개정된 국가계약법 시행령 제68조와 동일하게 제77조를 신설하여 '하자책임 구분이 용이하고 공정관리에 지장이 없는 공사에 대하여 기계설비공사와 같은 '설계서가 별도로 작성되는 공사로 명시함으로써 공공공사의 분리발주 활성화를 유도하는 내용을 담고 있다. 이로써 지방계약법에도 분리발주 허용 대상을 구체화 하고 발주기관의 장이 공사의 예산편성과 기본설계 등 사업의 계획단계부터 분리발주의 가능 여부 검토 조항이 명문화 됨으로써 지자체 분리발주가 더욱 활성화 될 것으로 예상된다. 이에 앞서 대한설비건설협회는 분리발주 법제화를 정부, 국회, 제18대 대선후보 등에 지속적으로 건의한 결과 박근혜 정부가 공공공사의 분리발주 법제화가 포함된 40대 중점 국정과제를 확정하고 공공공사의 분리발주 허용 대상과 활성화 조문이 포함된 국가계약법 시행령 제68조를 지난해 12월 30일 개정, 시행에 들어간 바 있다.

  • PDF

Effective Handling of Construction Disputes for Strengthening the International Competitiveness of the Construction Industry (건설산업 국제경쟁력강화를 위한 건설분쟁처리절차 개선방안)

  • Cho, Youngjun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.4
    • /
    • pp.3-11
    • /
    • 2020
  • Problems related to construction contracts arise if they are not reflected in the design phase from the planning phase of the construction project, or if they are not properly dealt with despite various changes in the construction phase. So far, there have been a number of discussions in Korea regarding the improvement of the procedures for resolving construction disputes, and the problems related to the procedures for solving construction disputes have been raised steadily, but the problems related to the procedures for solving construction disputes are still unresolved. Therefore, in this study, the followings were proposed to strengthen the international competitiveness of the construction industry. First, the so-called Construction Dispute Mediation Act should be enacted to prepare the basis for the establishment of a tentatively named Construction Dispute Mediation and Arbitration Agency(CDMA). Second, the work of the CDMA should be limited to the work of supporting the DRB, mediation and Arbitration the private and public sectors. Third, it is required to choose between adjustment and arbitration when obtaining a contract and to operate the DRB during construction phase. Fourth, CDMA should be established as standing bodies, and branches should be operated in various parts of the country. Fifth, construction experts from various areas should be included as members so that disputes over construction contracts can be dealt with quickly. And finally, relevant laws that specify the procedures for dealing with construction disputes should be amended together.

Efficient Fair Reservation and Exchange Protocol based on RSA Signature (RSA 서명에 기반한 효율적인 공정한 예약과 교환 프로토콜)

  • 성인제;장직현
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2002.04a
    • /
    • pp.772-774
    • /
    • 2002
  • 우리는 RSA 서명에 기반한 효율적인 공정한 예약과 교환 프로토콜을 위해 검증 가능한 암호화를 일반화한 부분적인 검증 가능한 암호화를 제안한다. 부분적인 검증 가능만 암호화를 이용해서 서명에 대한 공정한 교환과 더불어 전자 계약 시 사전 계약이나 비행기 티켓에 대한 예약을 짤 수 있도록 프로토콜을 확장했다. 또한 예약과 교환 시에 공정성을 보장하도록 했다. 이로써 우리는 공정한 교환 프로토콜의 교환단계에서 발생하는 계산 양과 전송 양을 예약과 교환 단계로 분산시키는 효과를 얻었다. 그리고 마지막으로 Ateniese가 제안한 RSA 서명에 기반만 공정한 교완 프로토콜과 성능 비교를 하였다.

  • PDF

A Case Study and Analysis on Reasonable Construction Period and Appropriate Number of Persons for Works According to Reconstruction (재시공발생에 따른 적정계약공기 및 적정출력인원 추정에 관한 사례조사 및 분석)

  • So Young-Sung;Kim Young-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.301-304
    • /
    • 2001
  • The purpose of this study is presume that reasonable construction period of constract and appropriate number of persons for works according to reconstruction. This study is presume reasonable construction period of constract and appropriate number of person of reconsruction with a case study out of apartment R.C construction. The result of this study are as follows: 1. In case of four building of apartment Resonable constrution period: 750days$\sim$800days, the average(1day) number of persons under working: 63.5 persons. 2. In case of four building of apartment Resonable constrution period: 850days$\sim$900days, the average(1day) number of persons under working: 100.6 persons. 3. In case of four building of apartment Resonable constrution period: 1000days$\sim$1050days, the average(1day) number of persons under working: 145.0 persons.

  • PDF