• 제목/요약/키워드: 계약기준

검색결과 315건 처리시간 0.024초

Infringement Status of Overseas Intellectual Property Right and Required Strategy (해외 지식재산권 분쟁현황과 그 대응방안에 관한 연구)

  • Yoon, Byung-Seop
    • Journal of Korea Technology Innovation Society
    • /
    • 제11권1호
    • /
    • pp.23-45
    • /
    • 2008
  • The object of this study is to present a strategy against technology protectionism of advanced countries focusing on international cooperation policy of KIPO and infringement of overseas intellectual property rights on the notion that a policy performed without a long-term plan will not lead to industrial growth in the long run. There is a high possibility that aggressive patent policy and black box strategy of Japanese enterprise can be a burden to Korean enterprises. Thus, a policy should be established against the technology protectionism. The policy can be based on a strategy about international cooperation policy of KIPO and strategy against infringement of overseas intellectual property rights. Of course, collaboration and cooperation will be activated among the advanced countries including technical cooperation. However, a systematic strategy of intellectual property rights should be focused on international cooperation and countermeasure against infringement of overseas intellectual property rights because national interest takes precedence over any other interest especially in case of strategically owing industry. A strategy against technology protectionism of advanced countries is as follows. A strategy is required to cope with infringement of overseas intellectual property rights. Korean government has to strengthen the function of overseas intellectual property rights protection center, strengthen boundary restriction of infringement goods, promote international dispute study, train international dispute specialist, construct confidence as social capital etc. Enterprises have to maintain no Patent no Future policy, specialize on application and countermeasure against infringement dispute, participate for formation and standardization of patent pool, strive for specialization regarding technical transfer and license management.

  • PDF

Comparison of Labor Inputs from Standard Quantities per Unit and Actual Quantities in Apartment Reinforced Concrete Work (공동주택 골조공사의 표준품셈 노무량과 실투입 노무량 비교)

  • Jeon, Sang-Hoon;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • 제9권2호
    • /
    • pp.182-189
    • /
    • 2008
  • In private and public construction works, cost estimation and site productivity management are based on designed labor quantities calculated by the Standard Quantities per Unit (SQU). The designed labor quantities are regarded as the basis for insurance costs and safety and environmental costs and also affect the progress measurement of construction works. Even though the designed labor quantities from the SQU has been considered to be different from actual labor quantities put to construction works, there is no research that empirically analyzes the statistical differences. This study analyzes actual labor quantities of form workers, steel-bar fabricators, concrete pourers in reinforced concrete works of the 43 apartment projects, and compares the actual labor quantities to labor quantities from the SQU. It goes further to scrutinize the critical reasons underlying the differences through a survey on 65 practitioners and interviews with 32 site managers and supervisors. The regression models of labor quantities of the apartment concrete work produced by the present study will contribute to reasonable construction contracts based on the past actual costs and practical site management by the actual labor quantities.

Development of Electrical Construction Cost Index Applied Chain-Weighted Method (연쇄방식 전기공사비지수 개발에 관한 연구)

  • Park, Houng-Hee;Choi, Seung-Dong;Hyun, So-Young;Park, Min-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • 제15권5호
    • /
    • pp.49-60
    • /
    • 2014
  • Electrical construction cost index has been applied fixed-weighted method. But fixed-weighted method can't faithfully reflect industrial structure changes. Because the weighted value and price index of fixed-weighted method is fixed on the basic period. Electrical construction cost index is composed of the cost of labor and material. So it fluctuates sharply whenever the construction association of korea announces the laborer's wage of electrical construction. And it depends on only the producer price index changes that is related to electrical construction since then. So a study is focused on developing electrical construction cost index applied chain-weighted method. Because chain-weighted method can reflect the realities of the electrical construction and alleviate the sudden changes of labor cost with link index. We verify that chain-weighted method relieves the step states of electrical construction cost index applied fixed-weighted method.

Big Deal, Open Access, Google Scholar and the Subscription of Electronic Scholarly Contents at University Libraries (빅딜, 오픈액세스, 구글학술검색과 대학도서관의 전자학술정보구독)

  • Shim, Wonsik
    • Journal of the Korean Society for information Management
    • /
    • 제29권4호
    • /
    • pp.143-163
    • /
    • 2012
  • The dominant model of acquiring scholarly contents at academic libraries is so called big deal where libraries subscribe to a bundle of hundreds, if not thousands of journals in a multi-year contract with fixed annual rate increase. The bid deal, started in the mid-1990s, offered a number of advantages for academic libraries and their users. However, escalating prices for these packages have become a serious issue casting doubts about the sustainability of the subscription-based model. At the moment, it appears there is no viable alternative other than pay-per-view method that is being tested at some libraries. Libraries' budget situation will remain a key factor that might change the situation. Open access started in the 2000s as a vehicle to eliminate barriers to publishing and distributing peer-reviewed scholarly journal articles. Open access publishing is witnessing two-digit growth annually. Open access articles now occupy close to 20% of two major citation databases: Scopus and Web of Science. Google Scholar service, debuted in late 2004, is now a popular tool for discovering and accessing scholarly articles from a vast selection of journals around the world. There is a call for taking Google Scholar seriously as a potential replacement of library databases amid concerns regarding the quality of journals indexed, limited search capabilities vis-$\grave{a}$-vis library databases, and monopoly of public goods. Escalating budget problems, rapid growth of open access publishing and the emergence of powerful free tool, such as Google Scholar, need to be taken seriously as these forces might bring disruptive changes to the existing subscription-based model of scholarly contents at academic libraries.

A Study of Analysis for Impact Assessment of the Cost Risk-Factor on the Design-Build Projects based on Business Process (설계시공일괄방식 사업의 업무단계별 사업비용 리스크요인에 대한 영향도 평가 및 분석)

  • Seo, Jae-Pil;Lee, Sang-Hyun;Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • 제13권3호
    • /
    • pp.14-24
    • /
    • 2012
  • Recently, a delivery system has been rapidly changed in the global construction market. Also, construction projects are becoming bigger and more technology-intensive. A lot of projects have been delivered by Design-Build(DB) System; from the standpoint of cost, approximately 40% of delivered constructions by a Public Procurement Service were DB in 2009. Nevertheless, the achievement has not surpassed our expectations on management of the project cost. On the characteristic of DB, the reasons why that happens are that projects contract have been signed after the Design Development Stage; the insufficient review about new technology and up-to-date construction methods; a lack of discussion in process of design. Those reasons cause a risk of increasing Cost of the projects. In order to solve these problems, it is desirable to find Cost-increasing factors in promoting the projects and select on the order of priority for Risk-Factor with careful management. Therefore, this study analyzed the weight of each phase of the project on the authority of properties of DB project, and identified Risk-factors which is increasing the cost on the aspect of project management. Based on this analysis, the impact assessment of Risk-factor is evaluated through the Failure Mode and Effect Analysis(FMEA).

Estimation Method of Waste Amount from Materials to Develop Generation Rates of Construction Waste in New Apartment Construction Sites: Focused on Bill of Quantities for Architectural Works (신축아파트 현장의 건설폐기물 발생원단위 개발을 위한 자재별 폐기물 수량 예측 방법: 건축공사 내역서의 투입 물량을 중심으로)

  • Jung, Jong-Suk;Song, Sang-Hoon;Park, Seong-Sik;Lee, Seok-Je
    • Land and Housing Review
    • /
    • 제5권1호
    • /
    • pp.41-51
    • /
    • 2014
  • The amount of new apartment construction has been trending upward in 3~4% each year since 11% increase in 2002. Currently, in public apartment construction sites under separate delivery system for construction waste processing, the significant difference between estimated quantity for contract and actual amount frequently causes severe controversy among project participants. Many factors such as poor environmental management, inadequate contractual amount are assumed to influence the above problem, and the requirement to revise existing generation rates, the key criteria applied in estimating the quantities of waste, is increasing. Most of generation rates were established in early 2000's, and have difficulty in reflecting the changes from new materials and technologies accordingly. Therefore, this study aims to clarify the types of construction waste for each trade and the forecast method as preliminary work in order to develop more accurate generation rates for construction waste in new construction. To achieve this purpose, the architectural bills of quantities in ten apartment projects executed during 2010~2013 were collected, and the possible waste types and reasonable material loss ratio for each item from temporary works to owner-supplying material area were defined and compared through the workshops and interviews with the experts and on-site environmental managers. The results of this study will contribute to establishing the categories of construction waste for construction trades and proper generation rates by the indirect estimation method in new apartment construction in the follow-up study.

A Study on Cause-and-Effect Hierarchy of Profit Factors for the Feasibility Evaluation of Overseas Construction Projects (해외건설공사의 타당성 평가를 위한 수익성 영향인자의 인과관계 계층구조 구축에 관한 연구)

  • Sun Seung-Min;Kim Han-Him;Han Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.373-378
    • /
    • 2003
  • Korea's overseas construction industry has been rather depressed by the weakened profitability as well as the sharp decrease of the market shares due to the lack of international competitiveness and the declined international market following the outbreak of Iraq war. There exist a lot of various risks in performing the overseas construction, and especially EPC projects, which entail complicated process from different parts, also require a sophisticated procurement and management skill. Subsequently, to survive in the competitive international market, we need to establish strategies to select potentially profitable projects at the initial stage of bidding process and to mitigate the high degree of risk exposures through contract negotiation and its adjustment. This research provides the profitability evaluation bases, with which overseas construction participants can forecast and analyze the risk more systematically, by eliciting profit-influencing factors from real overseas construction projects and structuring their cause-and-effect relationships. The profitability causal hierarchy structure describes the profitability factors' hierarchy in details and their interrelationships. It also enables us to find out critical factors directly related to profitability aggravation through a qualitative analysis. Ultimately, with this hierarchy structure as the base, the research will suggest how to develop the quantitative profitability forecasting model.

  • PDF

A Study on the Efficiency and Productivity Change of Korean Non-Life Insurance Company After Financial Crisis (금융위기 이후 국내 손해보험회사의 효율성 및 생산성 변화 연구)

  • Park, Chun-Gwang;Kim, Byeong-Chul
    • The Korean Journal of Financial Management
    • /
    • 제23권2호
    • /
    • pp.57-83
    • /
    • 2006
  • The purpose of this paper is to analyze the efficiency and productivity change and inefficiency cause of the korean non-life insurance companies of the before($1993{\sim}1996$) and after($1998{\sim}2004$) of IMF. we use DEA (Data Envelopment Analysis) model to measure company efficiency and MPI(Malmquist productivity indices) to measure company productivity change and Tobit regression to analyze inefficiency cause. we utilize ten non-life insurance companies in korea and the time-series data for eleven from 1993 to 2004 except 1997. The empirical results show the following findings. First, total cost efficiency shows that the after of IMF decrease of 3.7% over the before of IMF and MPI change indicates that the after of IMF increase 7.7% over the before IMF. Second, the results of Tobit regression to analysis the cause of inefficiency show that total cost efficiency is positively related invested assets, acquisition expenses ratio, collection expenses ratio and is negatively related solicitors ratio, personnel expenses ratio, land & buildings expenses ratio, loss ratio, net operating expenses ratio. Especially inefficiency of small-to-mid sized companies is main cause of total cost efficiency of non-life insurance companies in korea. Small-to-mid sized companies endeavored various aspects of business strategies.

  • PDF

Development of the Technology Valuation Analysis Indicators Using the Delphi Method in the Offset Program (델파이 기법을 활용한 절충교역 기술가치평가 분석지표 개발)

  • Hong, Seoksoo;Seo, Jae-Hyun
    • Journal of Korea Technology Innovation Society
    • /
    • 제16권1호
    • /
    • pp.252-278
    • /
    • 2013
  • Many countries implement an offset program as a method of the acquisition of modern military technology for enhancement of the domestic military strength. Offset agreements are made based on the value, not a monetary unit. The value should be above minimum threshold fixed by the related regulation. Hence, technology valuation model which is objective and reasonable is required vitally. At present, some defense related organizations such as DTaQ, ADD valuate the proposed technology by using their own method. However, due to the lack of differentiation of valuation analysis indicators for various technologies, existing offset valuation models are inadequate to consider whole characteristics of such technologies. In this paper, we developed four sets of offset valuation analysis indicators considering the characteristics of each technology, parts production, depot maintenance, military equipment performance upgrade, and R&D related technology, by using the Delphi method. Also, we structurized those indicators in each technology by using the factor analysis. Through applying developed indicators, it is expected that technology valuation in the offset program would be more credible and accurate. Ultimately, it gives greater bargaining power to negotiators in the procedure of the offset negotiation.

  • PDF

Effects of Work Environment, Job Satisfaction, and Organizational Commitment on Turnover Intention of Clinical Research Coordinator Nurses (임상시험코디네이터 간호사의 근무환경, 직무만족, 조직몰입이 이직의도에 미치는 영향)

  • Kim, Seul Ki;Lim, Ji Young
    • The Journal of the Korea Contents Association
    • /
    • 제18권5호
    • /
    • pp.175-190
    • /
    • 2018
  • This was a descriptive study aiming to verify the effects of work environment, job satisfaction, and organizational commitment on the turnover intention of Clinical Research Coordinator(CRC) nurses. In the results of this study, the organizational commitment had significant effects on the turnover intention of CRC nurses. On the other hand, the work environment and job satisfaction had no statistically significant effects on the turnover intention of CRC nurses. Based on the results of this study, the main discussions were drawn as follows. In order to increase the organizational commitment, it would be necessary to have the institutional improvement like the increase of opportunity to participate in the hospital operation, administration, and the establishment of affiliated institution for improving a sense of belonging. It would be also necessary for each hospital to establish the standard of welfare, wage system for the improvement of work environment. If the organizational commitment of CRC nurses who are the actual performers, supporters of researches is ignored, it is unavoidable that the performance and quality of clinical tests would be declined. Therefore, there should be some changes, so that CRC nurses could play a pivotal role in the whole process of clinical test, by changing the employment status from contract position to more stable employment status, to increase their commitment to organization and work continuity.