Browse > Article
http://dx.doi.org/10.6106/KJCEM.2014.15.5.049

Development of Electrical Construction Cost Index Applied Chain-Weighted Method  

Park, Houng-Hee (Electrical Industry Research Institute of Korea)
Choi, Seung-Dong (Electrical Industry Research Institute of Korea)
Hyun, So-Young (Electrical Industry Research Institute of Korea)
Park, Min-Young (Electrical Industry Research Institute of Korea)
Publication Information
Korean Journal of Construction Engineering and Management / v.15, no.5, 2014 , pp. 49-60 More about this Journal
Abstract
Electrical construction cost index has been applied fixed-weighted method. But fixed-weighted method can't faithfully reflect industrial structure changes. Because the weighted value and price index of fixed-weighted method is fixed on the basic period. Electrical construction cost index is composed of the cost of labor and material. So it fluctuates sharply whenever the construction association of korea announces the laborer's wage of electrical construction. And it depends on only the producer price index changes that is related to electrical construction since then. So a study is focused on developing electrical construction cost index applied chain-weighted method. Because chain-weighted method can reflect the realities of the electrical construction and alleviate the sudden changes of labor cost with link index. We verify that chain-weighted method relieves the step states of electrical construction cost index applied fixed-weighted method.
Keywords
Chain Method; Link Index; Electrical Construction Cost Index;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 Lee, J. S. (2012). "A study on the calculation method of the apartment house construction cost index using the chain index". Master thesis Dong-A University.
2 Moon, K. S. (2007). "A Study of Chained inedex for Monthly Data", The Korean Journal of Statistics, KNSO, 12(1). pp. 122-151.
3 Park, S. C., Koo, K. J., and Hyun C. T. (2006). "Development of Quantity based Base Period Price Index(QBPPI) to calculate Construction Cost Index, Korean journal of construction engineering and management, KICEM, 7(5). pp. 77-84.   과학기술학회마을
4 Ryu, D. H., and Park, C. B. (2011). "A Study on the Organic Method of Chain-weighed producer price index". Quarterly national accounts review, 1. pp. 1-28.
5 Sharon L. L. (1999). "Sampling: Design and Analysis". Duxbury Press.
6 The Bank of Korea (2009). "The Introduction of Chain-weighed GDP".
7 The Bank of Korea (2010). "Korean System of National Accounts: Concepts, Sources and Methods".
8 Kim, S. K. (2012). "Study on Historical Unit Price and Construction Cost Index in The Information & Communication Construction". Master thesis Soonchunhyang University.
9 Kim, W. Y., Kim, Y. J., Yi, J. S., Lee, Y. H. and Lee, B. Na. (2006). "A Basic Study for Developing the Construction Cost Index by Directly Surveying the Cost Input Structure in Korea, Korean journal of construction engineering and management, KICEM, 7(2). pp. 53-61.   과학기술학회마을
10 Lee, J. Y. (2010). "The Introduction of Chain-weighed producer price index and organic Task". Quarterly national accounts review, 43. pp. 74-102.
11 Park, Y. K. (2007). "A Study on the Chain-Weighed Method of Industrial Production Index: Focused on the Estimation Method of Weights". Master thesis Hannam University.