• Title/Summary/Keyword: 계약기준

Search Result 315, Processing Time 0.021 seconds

Designing the Promotion Policy of Korea ESCO Industry through the Examination of Foreign Country Exercises (해외사례 조사를 통한 국내 ESCO 산업 활성화 방안)

  • Min, Eunju;Kim, Myeongrok;Nam, Kitae;Kang, Mingoo;Kim, Suduk
    • Environmental and Resource Economics Review
    • /
    • v.26 no.1
    • /
    • pp.103-121
    • /
    • 2017
  • The domestic ESCO project was introduced in 1992 as one of the energy efficiency improvement programs. In recent energy market, the changes in the market conditions such as smart grid, renewable energy, and the importance of demand response became important issues. As the diversified business models are required, examples of overseas exercises are examined. Business areas in Europe or the US where the ESCO industry has been active include measures to improve the efficiency of energy facilities in all areas, ranging from energy supply facilities and energy services to end users. This type of ESCO overseas business model can be classified into various types such as project execution method, supplier demand management, financing method, climate change and emission rights, new and renewable energy, and other criteria. In this study, we propose to adopt IEC (Integrated Energy Contracting) contract method in domestic ESCO market for additional business models. Current convention of listing the specific individual business types being allowed by regulation turned out to be obstacles to the revitalization of the related market. In order to achieve the goal of energy conservation, it is recommended, instead, to revise the current funding guidelines to be a negative system.

A Financial Theory of the Demand for Insurance With Simultaneous Investment Opportunities (투자(投資)와 보험수요(保險需要)의 상관관계(相關關係)에 관한 재무경제학적(財務經濟學的) 연구(硏究))

  • Witt, Robert C.;Hong, Soon-Koo
    • The Korean Journal of Financial Management
    • /
    • v.9 no.1
    • /
    • pp.223-262
    • /
    • 1992
  • This paper develops a theory of the demand for insurance. The present model incorporates insurance demand time value of insurance premium, and demand for listless and risky assets simultaneously within the expected utility framework. For a special case of CARA, an insurance decision can be made separately from other portfolio decisions. However, in general, the interactions of both decisions cannot be ignored even when insurable and speculative risks are stochastically independent. In particular, the role of risky investment in hedging insurable risk is demonstrated and it is shown that this role cannot be duplicated by an insurance contract. When the investment decision is made simultaneously with the insurance decision, some of the classic theory on insurance should be modified. As an example, the authors characterize the sufficient conditions, under which the Bernoulli criteria (without and with premium loadings) hold or are violated in terms of the net gain of risky investment, the net cost of insurance, and the stochastic relationship between insurable and speculative risks. The authors interpret the results using the Rothschild and Stiglitz's (1970) notion of 'increase in riskiness'.

  • PDF

Development of an Unit Cost Modification Model for Proper Actual Cost Data in Small Building Construction Projects (소규모 건축공사의 적정 실적공사비 단가보정 모델 개발)

  • Kim, Kang-Shik;Hyun, Chang-Taek;Hong, Tae-Hoon;Jo, Seong-Min;Mun, Hyun-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.81-89
    • /
    • 2010
  • Since 2004, the government has changedthe cost estimate system to one of an actual cost basis in order to calculate the optimum construction cost by reflecting changes in circumstance on the construction site in a timely manner. Currently, this is being applied to public construction work forover a billion won of actual cost data in estimation by contract unit cost. However, directly reflecting actual cost, which for large-sized construction work was originally an average unit cost, to a small building, entails the application of a low discount rate for the cost of materials, labor, etc. and therefore can frequently give rise to cases in which the actual cost of work performed exceeds the contract sum, which in turn causes problems such as decreased revenues, bad effectson business operation, productivity, etc. Therefore, to apply actual cost to small-sized construction work (less than a billion won), there should be a plan to modify unit cost in a manner that can reflect project scale, etc. in order to resolve the problem of unit cost application of actual cost to small-building construction projects. The unit cost modification model for proper actual construction cost in small-scale construction projects developed by this study will help to increase the relevant productivity and proper gain, preventing the aggravation of business operations. Organizations placing orders are also expected to be able to secure a more realistic construction cost in arranging the budget.

Case Analysis on Application of Project Delay Analysis Method in Domestic Construction Project (국내 건설공사에서 공기지연 분석방법 적용 사례 분석)

  • Kim, Seon-Gyoo;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.98-106
    • /
    • 2019
  • Recently, the number of project delay-related claims and disputes in Korean construction projects has been increasing rapidly. This suggests that the domestic construction contract practice, which has traditionally been superior to the client, is changing into a mutually balanced relationship among the contracting parties. The project delay analysis selects the application method according to the type of schedule approved at the start of the construction and how the schedule management was performed during the construction. The most important prerequisite for project delay analysis is that a complete CPM schedule agreed at the beginning of the construction is prepared and the actual progress of such schedule is well documented. This study is about applying the project delay analysis methodology of a case where a contractor claims damages to a client while constructing a large new private building construction project. In this study, it is determined whether the application of the as-planned analysis method is appropriate to the incomplete CPM schedule and then proposes the as-planned vs. as-built analysis method based on the new standard as an alternative. Next, apply the as-planned vs. as-built analysis method to the schedule in the case project, and then compare it with the result of the as-planned analysis method. The purpose of this study is to suggest a project delay analysis method suitable for the domestic schedule management practices, so that it can be used as a meaningful reference in project delay disputes and litigations of domestic construction projects.

A Study on the Maritime Law According to the Occurrence of Marine Accidents of MASS(Maritime Autonomous Surface Ship) (자율운항선박의 해양사고 발생에 따른 해상법적 고찰)

  • Lee, Young-Ju
    • Maritime Security
    • /
    • v.6 no.1
    • /
    • pp.37-56
    • /
    • 2023
  • Recently, with the rapid development of ICT(Information and Communication Technology) and AI(Artificial Intelligence) technology industries, the emergence of MASS(Maritime Autonomous Surface Ship), which were thought only in the distant future, is approaching a reality. Along with the development of these amazing technologies, changes in the private law sector, such as liability, compensation for damages, and maritime insurance, as well as in the public law sector, such as maritime safety, marine environment protection, and maintenance of maritime order, have become necessary in the field of maritime law. In particular, with the advent of a new type of ship called MASS that does not have a crew on board, the kind and type of liability, compensation for damages, and insurance contracts in the event of a marine accident will also change. In this paper, the general theory about concept, classification, effectiveness and future of MASS and the general theory about concept and various obligations and responsibilities under the maritime law for discussion of MASS are reviewed. Next, in addition, regarding the problems that may occur in the event of a marine accident from MASS, the status as a ship, the legal relationship of the chartering contract, obligation to exercise due diligence in making the vessel seaworthiness, subject of responsibility, and liability for damages and immunity are reviewed from the perspective of maritime law. In addition, in the degree four of MASS, the necessities of further research to clarify the attributable subjects and standards of responsibility in the event of a marine accident, as well as the necessities of institutional improvement such as technology development, enactment and amendment of law and funding are presented.

  • PDF

Application of Activity-Based Costing(ABC) for Modular Building Construction Indirect Costs Calculation at the Manufacturing Stage (활동기준원가계산법(Actvitiy-Based Costing)에 의한 모듈러 건축물 공장제작단계 간접비 산정 방안)

  • Lee, JeongHoon;Park, Moonseo;Lee, Hyun-Soo;Lee, Kwang-Pyo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.139-145
    • /
    • 2015
  • Modular construction is combined with manufacturing production process and conventional construction industry technique. Considering characteristic of modular construction production process, manufacturing facilities require indirect costs for utilities, equipment, and overall maintenance, which can affect modular units pricing. However, current modular construction cost classification is inadvertent to reflect the manufacturing overhead costs, because it is generally added as a percentage to sum of labor, material and equipment as it called in single cost pool used. This process is easy to estimate the total construction cost at the project starting points, but it brings on misunderstanding of project profit estimations by "cross subsidization phenomenon". To prevent this situation, in this research aims to provide modular construction overhead cost handling process at the detailed indirect cost calculation for manufacturing stage using Activity-Based Costing as one of the powerful method for overhead costs estimation and allocation. Using this research results, modular construction cost estimators have more detailed cost information of modular units and prevent to misallocate indirect costs. Also, it can be utilized to aid the understanding of the company's profit structure.

A Study on the Estimation of Occupational Safety and Health Expense Rate by Safety Environment Change in Construction Industry (건설산업의 안전 환경 변화에 따른 산업안전보건 관리비 적정요율 산정에 관한 연구)

  • Oh, Se-Wook;Kim, Young-Suk;Choi, Seung-Ho;Choi, Jin-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.97-107
    • /
    • 2013
  • Occupational safety and health management expense in construction industry means the monetary amount that the purchaser appropriates to prevent various disaster from happening during the construction period by setting aside a certain amount from subcontract based on the construction type and scale. The current appropriation standard of the Ministry of Employment and Labor has been enforced since its stipulation in 1988 although various policy changes for the safety in construction industry, e.g. the development of occupational safety management techniques in construction industry, changes in construction field site environment, cost depreciation, etc., are happening in Korea and overseas. Therefore, it is required at this point to examine whether the current occupational safety and health management expense appropriation is proper or not on the basis of time trend and the changes in the construction industry environment. Accordingly, this study aims at investigating the appropriation of occupational safety and health management expense for construction industry by the construction type and target expense in response to current construction industry environment and proposing the proper appropriation. The above research result proposes the calibration of the appropriation as specified and stipulated by the Ministry of Employment and Labor by the construction type and target expense, which is necessary to reflect the actual condition of the current construction industry environment.

A Selection Model of Suitable Tendering System for Public Construction Projects (공공건설공사의 최적 입찰방식 선정모델)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.164-174
    • /
    • 2008
  • It is crucial In decision making to select a project delivery system (PDS) adjusted accordingly to the project characteristics. Furthermore, selecting a tendering system is the kernel in the process of selecting PDS. In October 2007, the Ministry of Finance and the Economy of Korea launched two new project delivery systems, "Best Value Contract (Design-Bid-Build)" and "Bridging Contracts (Design-Build)" by revising enforcement ordinances of "Act on Contracts to Which the State is a Party" to provoke the tendering systems. In order to support the proposed purpose, this research developed a selection model for suitable tendering system, which helps a public owner select a tendering system appropriate to the project characteristics. First, the framework of the model was set throughout analyzing previous researches and interviewing relevant experts. Additionally, by analyzing the survey result from 265 experts engaged in architectural and civil engineering business, the relative weights of the selection factors and the effectiveness values of the alternatives were suggested as the quantitative evaluation references. Finally, the practical guideline was suggested to apply this model to three public projects scheduled to be delivered. The result of applying the model to three case projects showed that further researches were needed to make the selection process logical and to suggest the standard weights and effectiveness values according to project type.

A Study on Analysis of Construction Monitoring Cost and Improvement Measures of Railway Tunnel Construction in Seoul (서울시 철도터널 건설공사의 공사계측비 분석 및 개선방안 연구)

  • Jong-Tae Woo
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.1
    • /
    • pp.18-30
    • /
    • 2023
  • Purpose: This study is to contribute to the development of monitoring technology through the increase of confidence in construction monitoring by deriving the analysis of construction monitoring cost and improvement measures of railway tunnel construction in Seoul. Method: It presents the status on design and contract of construction monitoring cost, status on application construction monitoring cost and its analysis, analysis on safety management cost and quality management cost, expansion of application of the price calculation standard for monitoring management services to improve this, and monitoring for direct order of ordering organization. Results: If the monitoring management service that was meanwhile ordered as included in the construction work is performed by the directly selected company of ordering organization through the preliminary screening for bidding qualification, then the improvement of monitoring quality and the accurate monitoring data can be secured. Conclusion: For the price calculation standard for monitoring management service, the application of actual cost addition method under the Engineering Promotion Act and the calculation standard of monitoring management cost for standard estimation for ground survey should be extended through the direct order of ordering organization, not the method to be included in the net construction cost where it is performed by a subcontractor via contractor.

Legal Review of Product Liability of a Defective Aircraft (군용항공기와 결합방지를 위한 개선방안 및 법적 책임관계 연구)

  • Cho, Young-Ki;Chung, Wook
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.20 no.2
    • /
    • pp.59-158
    • /
    • 2005
  • When a military aircraft suffers damages due to the defects in its design, manufacturing or notification, all of which are generally understood as products liability defects, the obvious compensation is sought as it would in other consumer good case. However, there exist clear yet unappreciated difference between general consumer goods and military aircraft, as far as products liability law is concerned - some sort of recovery should be obtained even when there exist only defects, not damages, to the aircraft because of the implication of defective parts is much grave than what can be expected in a consumer goods case. While certain anticipatory measures do exist in manual or at negotiation stages for the safety of military aircraft, such measures are ineffective, if not ambiguous, in recovery effort in the post-accident stage In another word, the standardized military procurement contract manuals and boilerplate forms do not appreciate the unique and dangerous military nature of military aircraft. There are many unique legal issues which can arise when trying to prevent defective aircraft or parts, or to recover compensations for accident due to such defects. At two-level, the government should establish legal system (or countermeasures if you'd like) for purchasing safer military aircraft. First, one should be able to work with legal ground and policy that allows selecting and purchasing safer goods - the purpose of such contract is not litigious, but rather in acquiring what are most reliable. Second, in case the defects do arise and lead to damages, solid legal principles and instructions should be established for effectively pursuing appropriate company, (usually a aerospace industry giant with much experience) for products liability - the purpose of such pursuit is inevitable for a public official, since he or she is no private business man with much flexibilities, even to the point of waiving such compensatory right for future business purposes. This article tries to identify problems in methods of procuring military aircraft or parts - after reviewing on how the military can improve on legal and policy grounds for procuring what will be the focus of future military strength, it will offer some of the ways to effectively handling and resolving a liability issues.

  • PDF