• Title/Summary/Keyword: 계단실 공법

Search Result 5, Processing Time 0.017 seconds

Development of PC Double Wall for Staircase Construction (계단실 공사를 위한 PC Double Wall 공법 개발)

  • Suh, Jung-Il;Park, Hong-Gun;Hwang, Hyeon-Jong;Im, Ju-Hyuk;Kim, Yong-Nam
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.6
    • /
    • pp.571-581
    • /
    • 2014
  • In the present study, hollow precast concrete wall (PC Double Wall) for staircase construction was developed. Comparing the conventional walls, the PC Double Wall can be reduced the lift weight using hollow core and improves the integrity between the PC members. The cross-section and re-bar details of the PC Double Wall were developed considering precast concrete manufacturing, constructability, and the structural safety. Particularly, a form system was developed to manufacture thin and hollow core PC wall efficiently. A mock-up test for a staircase using the PC Double wall was performed to verify the constructability and integrity of the PC walls. The test result verified that joint deformation and cracking did not occur as showing good constructability.

Analysis of Construction Cases for Sequential PC Stairway Method (RC 계단실 연속화 시공을 위한 PC 계단 공법 현장사례 분석)

  • Lee, Suk-Yong;Rhim, Hong-Chul;Kim, Ook-Jong;Cho, Hong-Duk;Jeong, Mee-Ra
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.15-19
    • /
    • 2008
  • The use of Precast Concrete (PC) stairways is increasing to replace existing Reinforced Concrete (RC) stairways for the faster construction and the better quality control. Among several already developed PC stairway construction methods, RC Core Sequential Construction Method by Using PC Stairways (COSEC) has advantages of 1) allowing core of a building to be built prior to PC stairways so that two different procedures will not interfere with each other, and 2) having a newly developed joint connection with the core so that the RC core and PC stairways can be easily put together. In this paper, cases of several construction sites with the PC stairways method are analyzed. The elements of the developed method are described for further application and improvement.

  • PDF

Performance Evaluation of the Stair Joints Constructed with Partial Precast Concrete System (프리캐스트 콘크리트 계단 접합부의 접합방식에 따른 성능평가)

  • Chang, Kug-Kwan;Lee, Eun-Jin;Jin, Byung-Chang
    • Journal of the Korea Concrete Institute
    • /
    • v.20 no.6
    • /
    • pp.833-840
    • /
    • 2008
  • The time and cost can be reduced when applying partial precast concrete to the stair system in comparison to the cast-in-place or precast method. Because the performance of staircase which is used for evacuation can be largely different from connection types of precast concrete member, we tried to know structural behavior and performance evaluation according to each type of stair joints by experimental study. In the cast-in-place rigid joint, much reinforcement is needed in the end portion because much stress is concentrated in the middle portion. Also, in the pin joint which is used in the connection point, the maximum stress occurs in the middle point, so not only the amount of re-bar is increased but also the serviceability is largely decreased. The bolt type of semi-rigid joints proposed in this study had been increased strength and serviceability which is similar to the rigid joints. Also, its ductility was shown about 0.7 times in comparison to the rigid type and was about 2.8 times for the pin joint type. According to the classification of joint in Eurocode, it can be considered that it is one of the semi-rigid joints which are in the semi-rigid-full strength, and the structural behavior can be expected by using a model which applied to stiffness value decreased by 40 percent.

Long-Term Performance of Full-Scale Tiered Geogrid Reinforced Wall under Sustained Load (실대형 계단식 보강토 옹벽의 지속 하중하에서의 장기변형 거동 특성)

  • Yoo, Chung-Sik;Jung, Hye-Young;Lee, Bong-Won
    • Journal of the Korean Geosynthetics Society
    • /
    • v.4 no.2
    • /
    • pp.29-38
    • /
    • 2005
  • It is essential to take consideration of long-term deformation characteristics of mechanically stabilized earth wall user sustained and repeated loads for design and construction, especially for use as part of permanent structures. This paper presents the long-term performance of a full-scale geogrid reinforced segmental retaining wall results based on the measured strains in geogrids for three years. The results indicate that the reinforcement tensile strains tend to continuously increase after wall completion with the increase being more pronounced in the reinforcement layers in the lower tier. It can be concluded that the long-term deformation should be taken in account for walls constructed as part of permanent structures for which wall deformation should be controlled.

  • PDF