Browse > Article
http://dx.doi.org/10.4334/JKCI.2008.20.6.833

Performance Evaluation of the Stair Joints Constructed with Partial Precast Concrete System  

Chang, Kug-Kwan (Dept. of Architectural Engineering, Seoul National University of Technology)
Lee, Eun-Jin (Dept. of Architectural Engineering, Seoul National University of Technology)
Jin, Byung-Chang (Dept. of Architectural Engineering, Seoul National University of Technology)
Publication Information
Journal of the Korea Concrete Institute / v.20, no.6, 2008 , pp. 833-840 More about this Journal
Abstract
The time and cost can be reduced when applying partial precast concrete to the stair system in comparison to the cast-in-place or precast method. Because the performance of staircase which is used for evacuation can be largely different from connection types of precast concrete member, we tried to know structural behavior and performance evaluation according to each type of stair joints by experimental study. In the cast-in-place rigid joint, much reinforcement is needed in the end portion because much stress is concentrated in the middle portion. Also, in the pin joint which is used in the connection point, the maximum stress occurs in the middle point, so not only the amount of re-bar is increased but also the serviceability is largely decreased. The bolt type of semi-rigid joints proposed in this study had been increased strength and serviceability which is similar to the rigid joints. Also, its ductility was shown about 0.7 times in comparison to the rigid type and was about 2.8 times for the pin joint type. According to the classification of joint in Eurocode, it can be considered that it is one of the semi-rigid joints which are in the semi-rigid-full strength, and the structural behavior can be expected by using a model which applied to stiffness value decreased by 40 percent.
Keywords
partial precast concrete; stair joint; semi-rigid joint; effective stiffness;
Citations & Related Records
연도 인용수 순위
  • Reference
1 김록배, 김욱종, 이지웅, 이도범, '프리캐스트 계단의 접합방법 개선에 따른 구조 성능 평가,' 대한건축학회논문집 구조계, 21권, 11호, 2005, pp. 27-34
2 이은진, 진병창, 장극관, '선시공 조립식 거푸집 공법을 이용한 계단 접합부의 접합방식에 따른 해석적 연구,' 한국콘크리트학회 봄 학술발표회 논문집, 2008. 5, pp. 301-304
3 대한건축학회, 건설교통부 고시 건축구조설계기준, '최대허용처짐' 2005, 199 pp.
4 Johnson, R. P. and Anderson, D., Designers' Handbook to Eurocode 4, Part 1.1 : Design of Composite Steel and Concrete Structures, pp. 67-71
5 (주)일호, 서울산업대학교, 선사공 조립식 hi-form을 이용한 통합 거푸집시스템공법 개발 및 실용화 연구보고 서, 건설교통부 한국건설교통기술평가원, 2008. 6, 7 pp.
6 Beton-Verlag, Precast Concrete Connection Details-Structural Design Manual, Stupre-Society for Studies on the Use of Precast Concrete, Netherlands, 1982
7 Englekirk, Robert E., 'Development and Testing of a Ductile Connector for Assembling Precast Concrete Beams and Columns,' PCI Journal, March-April 1995., pp. 36-51