• Title/Summary/Keyword: 견적정보

Search Result 81, Processing Time 0.022 seconds

An Index for Measuring the Degree of Completeness of BIM-based Quantity Take-Off (BIM기반 물량산출 완성도 측정을 위한 지수 개발)

  • Lee, Chang-Hee;Kim, Seong-Ah;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.79-92
    • /
    • 2011
  • Quantity take-off is one of the critical tasks that determine the cost of a construction project, and its result should be accurate and reliable. BIM-based quantity take-off is a very attractive process for practitioners since the quantity take-off can be done automatically in a fast and accurate way. However, the result of BIM-based quantity take-off can be varied depending on how BIM was modeled. As a project progresses, more detailed design information is getting available, and it can be expected that the degree of completeness and accuracy for the BIMbased quantity take-off is going to be improved as well. However, when estimation is performed at each stage of a project life-cycle, there is no way to measure or forecast how accurate of the quantity take-off result from the BIM data given at the current stage. Therefore, this research derived factors that affect the BIM-based quantity takeoff and developed a methodology and framework to measure and forecast the completeness of BIM-based quantity take-off. The measurement framework and index that are proposed by this research was verified and validated for their consistency and feasibility through six pilot projects.

Difference Factors Analysis of between Quantity Take-off Using BIM Model and Using 2D Drawings in Reinforced Concrete Building Frame (건물 골조수량 산출 시 BIM모델 기반 수량과 2D도면 기반 수량 차이 요인 분석)

  • Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.5
    • /
    • pp.651-662
    • /
    • 2023
  • Recently, research on the use of Building Information Modeling(BIM) for various construction management activities is being actively conducted, and interest in 3D model-based estimation is increasing because it has the advantage of being able to be automatically performed using the attribute information of the 3D model. Therefore, this study aimed that the difference in the quantities is calculated the quantity based on the 2D drawing of a building and is extracted from the 3D model created by the Revit software was compared and tried to find out the cause. The difference in the quantity calculated by the two methods was the largest in the formwork, followed by the smallest in the order of the quantity of rebar and concrete. The reason for this difference is that there is a part where the quantity extraction in the 3D model is not suitable for the quantity calculation standard, and in particular, in the case of formwork, it was difficult to separate only the quantity of the necessary part. In addition, since the quantity of rebar was not separated by member, it was impossible to accurately compare the quantity and identify the cause of the difference. Therefore, it is considered to be the most reasonable to use application software that imports only the numerical information necessary for quantity calculation from the 3D model and applies a separate calculation formula.

The Development of Productivity Prediction Model for Interior Finishes of Apartment using Deep Learning Techniques (Deep Learning 기반 공동주택 마감공사 단위작업별 생산성 예측모델 개발 - 내장공사를 중심으로 -)

  • Lee, Giryun;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.3-12
    • /
    • 2019
  • Despite the importance and function of productivity information, in the Korean construction industry, the method of collecting and analyzing productivity data has not been organized. Also, in most cases, productivity management is reliant on the experience and intuitions of field managers, and productivity data are rarely being utilized in planning and management. Accordingly, this study intends to develop a prediction model for interior finishes of apartment using deep learning techniques, so as to provide a foundation for analyzing the productivity impacting factors and predicting productivity. The result of the study, productivity prediction model for interior finishes of apartment using deep learning techniques, can be a basic module of apartment project management system by applying deep learning to reliable productivity data and developing as data is accumulated in the future. It can also be used in project engineering processes such as estimating work, calculating work days for process planning, and calculating input labor based on productivity data from similar projects in the past. Further, when productivity diverging from predicted productivity is discovered during construction, it is expected that it will be possible to analyze the cause(s) thereof and implement prompt response and preventive measures.

A Study on the Establishment of Design and Construction Process Standardization through Building BIM Application Case (건축물 BIM 적용사례를 통한 설계 및 시공프로세스 표준화 수립에 대한 연구)

  • Jeong, Hee-woong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.4
    • /
    • pp.347-358
    • /
    • 2022
  • In order to satisfy the extraction and use of information such as estimates and processes required in the design and construction stages of BIM, which is an expectation of overall construction operation for the design and construction stage of domestic buildings, it is insufficient to supply and apply mobile technologies or terminals. In this paper, standardization of BIM-based processes from the design stage to the construction stage is proposed as an efficient construction system method through mobile-based simulation and test-bed case analysis review. The current status and potential of BIM application were identified through theoretical review of BIM and case studies at home and abroad. In addition, the overall flow of the project and the direction of effective process construction were investigated through each process by 3D, 4D, and 5D execution stage and the role of each collaborator. 4D building process BIM simulation system using mobile was implemented by applying a visualization engine that simulates process information, object information connection module, and related object information. Therefore, it was possible to minimize the possibility of re-construction of the BIM design and construction process model through the visualization of 2D drawings based on the 3D model of the building and the review of errors and interferences in the drawings. In addition, in the implementation of simulation for each process of the construction process through mobile devices, it was possible to support construction progress and process management according to the optimal option selected by the user.

Development of an Immersive Virtual Reality-Based Bathroom Self-Remodeling System

  • Mi-Young Song
    • Journal of the Korea Society of Computer and Information
    • /
    • v.29 no.4
    • /
    • pp.63-72
    • /
    • 2024
  • The size of the home interior market is growing rapidly as interest in interiors and self-interiors has increased due to the recent rapid increase in single-person households. Most of the Bathroom remodeling is done by requesting an offline interior contractor and then visually checking it in the final completion stage, so it is not easy to re-construct even if the customer is dissatisfied. Therefore, this study developed an immersive virtual reality-based Bathroom self-remodeling system that can visually check space and design from the design stage to the final stage by incorporating VR technology to feel realistic in virtual reality. The bathroom structure may select the basic structure of the predefined bathroom space or freely set the size of the bathroom space. For furniture items, you can choose the washbasin, toilet, bathtub, shower booth that are essential elements of the bathroom and others(mounting rack, trash bin, handle). The tile texture may change the texture of the selected tile at a desired wall position by selecting various textures. In particular,, the texture of the wall tile can be varied by selecting horizontal, vertical and inclined directions at the desired angle according to the needs of the user and the contractor. As a future research project, this system will enable indoor sharing between users who are physically far away in real-time, allowing direct experience in virtual spaces, connection to purchases, and request estimates.

A Study of Calculating Audit Fee According to the Number of Input Auditors and Audit Input Times: Focusing on the Companies of 100 Billion KRW Assets (회계감사 등급별 투입인원 및 투입시간 산출에 따른 감사보수산정 연구 -자산규모 천억원 기업을 중심으로-)

  • Mun, Tae-Hyoung
    • Management & Information Systems Review
    • /
    • v.35 no.3
    • /
    • pp.231-247
    • /
    • 2016
  • This study, according to the amendment of the Act on External Audit, on the basis of the number of input auditors, the content of auditing, and audit times as additional informations, calculates the average of the samples listed companies with assets of one hundred billion KRW. However, since the actual number of the subject corporations of which asset is 100 billion KRW is small, it is difficult to extract data with reference to this asset size. Therefore, the samples were extended to 50 corporations of which asset is 10% less than 100 billion KRW and other 50 more corporations of which asset is 10% more than 100 billion KRW. As a result, a total of 100 corporations were included as samples. To calculate the average of the audit times, a t-test was performed between the two groups. The result of the t-test showed that there is not a significant difference between the two groups. According to the analytical results of the t-test, the average of the number of input auditors and the average of audit times were calculated with respect to all the 100 samples. A further analysis showed that the average of audit content in the present study was compared with the estimated values in the study of Mun (2016). Although the results of this study may not be the optimal number, they may be used as a fundamental index which may be compared with the audit times and the audit fees in the current audit market where there is not an available reference. In addition, the amendment of the Act on External Audit may enhance the independence of auditors and the transparency of accounting system when compared with the previous system where only the total audit times were disclosed.

  • PDF

Development of BIM-based Work Process Model in Construction Phase (시공단계의 BIM기반 건설사업관리 업무절차 모델 개발)

  • Yu, Yongsin;Jeong, Jiseong;Jung, Insu;Yoon, Hobin;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.133-143
    • /
    • 2013
  • BIM can be utilized variously in construction management(CM) in the respect that it helps to manage comprehensively the construction information and make reliable decisions, but the adoption of BIM is insufficient in the CM area. The purpose of this study is to develop work process models and their guides in order to utilize BIM effectively in CM work at construction stage. This study defined BIM functions as 'BIM converting design', 'Model review', 'Data extraction', 'Automatic estimate', '4D simulation', 'Drawing creation', 'Engineering sector linkage analysis' through literature search, and generated CM works applicable to BIM by analyzing the CM work and process. This study developed BIM-based CM work process models by reconstructing the existing work process in connection with BIM function through an analysis on the relationship between BIM function and CM work, and reconstructing the role of each project participants. In order to improve the usefulness of the developed models, guides that described the BIM works of project participants were prepared through interviews and case studies. To validate the utilization of the models, a comparative analysis on the BIM process of precedent studies was also made and a survey was conducted on experts. This study can contribute to increasing the utilization of BIM in the CM area and can be helpful for CM companies to develop an in-house BIM guide. In the future, it will be necessary to make an assessment on the models from a business perspective through case applications and constantly update BIM-based CM work process model in consideration of the expansion of CM work due to the application of BIM.

A Proposal of BIM Work Process to Support Construct-ability Analysis from Practitioners Viewpoint (현장실무자 관점에서의 시공성 검토 지원을 위한 BIM 업무프로세스 제안)

  • Kim, Dae-Sung;Choi, Hye-Mi;Kim, Ju-Hyung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.6
    • /
    • pp.561-569
    • /
    • 2014
  • In construction site, BIM is used in part of construct-ability review and design mistake checking. However, in a current domestic construction site, except public order project, most of work in private order project has been processing based on 2D work. As an expert resists to certain point in introduction of new technique, it may be shown in the introduction of BIM. For this, We need to analysis construct-ability of introducing BIM, work field of introducing and operational capability about present domestic construction engineers. Therefore, this study solves the problem of existing construct-ability analysis, and it visualizes the various information and objects for an effective job performance. Furthermore, construct-ability analysis by BIM that can use an intergrated management is theoretically examined and practical field-application priority among conclusions is proposed through a survey targeting on the hand-on worker. Therefore, this study suggests a factor supplying for a business-centric introduction plan and support condition.

The Study on the Internet-based Virtual Apartment Remodeling and Auto Estimation Simulator (인터넷 기반의 아파트 리모델링 및 자동 내역산출을 위한 시뮬레이터 디자인 연구)

  • 서재은;김성곤
    • Archives of design research
    • /
    • v.15 no.1
    • /
    • pp.191-202
    • /
    • 2002
  • As family types have been diverse, patterns of living and living space became diverse as much as users are. Therefore, it is needed to provide various remodeled design of living space corresponding to changes of users'living patterns, and to provide these remodeling process to users directly on the web. In this paper, use scenario for the Internet-based Virtual Apartment Remodeling Simulator is researched as an export system to remodel space in accordance with users diverse lifestyle paradigm and the website is developed. The study consists of four parts. First, the general concept of remodeling, including the range and types of remodeling, are defined, and the misleading terms in this field are reviewed and organized by secondary research Second, fixed factors and variable factors are differentiated in the complex building for residence and business that was decided as a basic building type in this study. Third, there needed a database for consulting, final material, pre-estimation real estimation for simulation of remodeling. This database was introduced along with floor plan and elevation. Finally, the remodeling simulator is presented by the case study developed on the web. The system structure and use scenario are also presented. In order to present and inspect design alternatives, prototype was produced. The Final simulator was enhanced by defeating problems regarding interface efficiency and missing information of existing online site.

  • PDF

Benchmarking of US General Contractor's Pre-construction Services for a CM at Risk Project to Improve Contractor's Competitiveness (책임형 CM사 경쟁력 확보 및 선진화를 위한 미국 건설사의 시공이전단계 서비스 벤치마킹 연구)

  • Lee, Chang-Jae;Lee, Sang-Hyo;Ahn, Yong-Han
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.3
    • /
    • pp.9-18
    • /
    • 2017
  • Construction Management at Risk (CMAR) is a project delivery method that enables CM companies to deliver projects at a Guaranteed Maximum Price (GMP). General contractors can apply CMAR from the initial design phase right through the construction phase to reduce risks and improve project performance. One of the major advantages CMAR offers is that it permits a general contractor to provide a comprehensive suite of preconstruction services, including estimating, a constructability review, value engineering, drawings and a specification review, green building, and Building Information Modeling(BIM), among others. However, general contractors in South Korea currently provide only limited preconstruction services using CMAR because few CMAR projects have yet been implemented in Korea and their experience using the method is therefore limited. This benchmark study of how foreign general contractors utilize CMAR in their projects, particularly during the preconstruction process, its purpose, and the roles and responsibilities of each of the different participants in successful implementations thus provides invaluable information and will serve as a useful guide for Korean contractors seeking to incorporate CMAR preconstruction services in their projects and thus improve the competitiveness of their construction businesses.