• Title/Summary/Keyword: 건축 현장

Search Result 1,479, Processing Time 0.026 seconds

Effect of Opponents' Communication Styles on Job Stress of Building Construction Field Managers (상대방의 커뮤니케이션 유형이 건축공사 현장관리자 직무스트레스에 미치는 영향)

  • An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.2
    • /
    • pp.177-183
    • /
    • 2018
  • The communication issue in the building construction site organization effects on the job stress of the field mangers, because the field managers are working with various members in the construction site organization. Therefore, the purpose of this study is to investigate the effect of opponents' communication styles on job stress of the building construction field managers. As a result of this study, it was found that the job stress felt by the building construction field managers was differed according to the opponents' communication styles. In special, when the communication style of the opponents of construction field managers was an emotive style or a director style, job stress was higher. However it was a supportive style or a reflective style, job stress was lower. The results of this study are expected to help to build the site organizational management system to improve the performance of construction work in the building construction projects.

녹색건설기술 - 에너지절감 등 녹색기술 건축현장 적용사례

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.250
    • /
    • pp.44-60
    • /
    • 2011
  • `녹색건설기술 세미나'가 지난 2월 17일 건설회관 2층 중회의실에서 개최됐다. 이날 세미나에서는 ${\Delta}$녹색건설 정책방향 ${\Delta}$태양광 녹색기술 활용사례 ${\Delta}$에너지절감 건축현장 적용사례 ${\Delta}$친환경 하이브리드 발전시스템 적용사례 등이 발표됐다. 본지는 녹색건설기술 정보교류 활성화를 위해 세미나에서 발표됐던 내용 중 이상엽 삼성물산 과장이 발표한 '에너지절감 등 녹색기술 건축현장 적용사례'를 소개한다.

  • PDF

중소기업현장을 가다 - 주식회사 비봉이앤지

  • Choe, Jong-Deok
    • The Safety technology
    • /
    • no.110
    • /
    • pp.48-49
    • /
    • 2007
  • 최근 건축물은 삶의 터전, 생활의 터전에서 벗어나 미를 상징하는 또 하나의 예술품이다. 고급스럽고 아름다움을 지향하는 요즘 건축물에는 유리가 주 소재로 이용되고 있다. 심지어 초고층 대형 건축물에 있어서도 대형 유리는그 고풍스러움을 더해준다. 국내 최고의 유리 가공업체인 비봉이앤지는 8미터가 넘는 대형 유리까지 특수 제작함에있어 안전을 등한시하지 않는다. 오늘 대한산업안전협회 수원지회 박창옥 계장과 함께 현장을 찾았다.

  • PDF

Quantity Management Model for Manufacturing and Assembly of Large-scale Modular Construction Projects during Construction Phase (대규모 모듈러 건축 프로젝트 현장 시공 시 공장 생산량 및 현장 시공량 관리 모델)

  • Choi, Onekyu;Lee, Hyunsoo;Park, Moonseo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.1
    • /
    • pp.43-53
    • /
    • 2018
  • Modular construction can improve construction quality and accuracy through manufacturing process, and it allow massive production and cost savings by repeatedly producing the same unit. In particular, it is possible to reduce the time because the on-site work and the manufacturing process can be carried out at simultaneously. However, according to the modular construction project survey report, there is no significant difference regarding the average construction period between modular construction and conventional construction. This is due to schedule delay problems that occur during construction phase. Therefore, it is necessary to select alternatives to prevent schedule delay during on-site construction progressing. Especially, in case of large-scale modular construction project, on-site module assembly and manufacturing process are performed concurrently. Hence, identification of alternatives should be done at the co-occurrence by taking both manufacturing and on-site work process in to account. In this research, the management factors of large-scale modular construction project were identified through the IDEF0 modeling, and the quantity management model for manufacturing and assembly is developed. This will reduce the schedule delay problem that occurs in the progression on-site work of a large scale modular construction.