• Title/Summary/Keyword: 건축 설계자

Search Result 305, Processing Time 0.03 seconds

Cost Estimating for Public Facilities at Early Stage Using Functional Area Cost - Focusing on Army Barracks - (공공건축물 계획단계에서의 용도별 공사비 예측에 관한 연구 - 육군 병영생활관을 대상으로 -)

  • Lee, Hyun-Soo;Jung, Myung-Jun;Park, Moon-Seo;Son, Bo-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.6
    • /
    • pp.3-13
    • /
    • 2010
  • The purpose of this research is to develop a conceptual model that establishes a new approach for functional area cost estimating in the schematic design phase. A cost estimating model should consider not only the estimate accuracy, but also the flexibility to the design alternatives and user-oriented serviceability. Therefore, this research uses the method that classifies various facilities of a building according to its functions by analyzing historical data. After setting the functional area as cost parameter, a formula which can estimate functional area cost is derived from statistical analysis. Finally, to validate the proposed conceptual model, it is applied to historical data of a military barrack project. It enables customized space planning reflecting client's needs and compares the cost of various design alternatives as well as improves estimate accuracy.

A Study on the Improvement of Engineering and Construction Supervision Guarantee System in Korea (국내 설계.감리 등 용역보증제도 현황 및 개선방안 연구)

  • Lee, Yong-Hee;Choi, Jae-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.53-61
    • /
    • 2011
  • After several collapse accidents of large structures in the early 1990s in Korea, the government enacted a law that architectural, engineering and construction firms are obliged to have insurance for projects over a certain size. Particularly, with regard to insurance in design and construction supervision works (i.e. engineering insurance), although several operation-based problems were pointed out from practitioners, still little research has been done on analyzing current regnlartory and operational state and suggesting policy alternatives. Hence, this study applies Delphi technique to solicit current operational problems and propose a series of improvements on engineering insurance based on interview surveys targeting major market participants: municipalities, engineering firms, and insurance companies. Key findings culminate in adopting guarantee limits based on credit evaluation, abrogating joint surety, covering a loss of life, increasing insurance entrance fee, extending time covered, and etc. Reaching a consensus on the proposed alternatives between the market participants will form the foundation for sound developments of construction design and engineering industry.

Proposal of Hydrologic Performance Evaluation Method for the Improvement of Rainwater Management and Utilization of G-SEED (녹색건축 인증제도의 빗물관리 및 이용 항목의 개선을 위한 수문학적 성능평가 방법 제안)

  • Park, Jin;Han, Mooyoung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.158-158
    • /
    • 2021
  • 도시에 불투수면적이 증가하고, 기후변화가 극심해져감에 따라 홍수 및 열섬현상과 같은 도시의 물 문제가 발생하고 있다. 이를 해결하기 위한 정책의 일환으로 우리나라의 녹색건축인증제도(Green Standard for Energy and Environmental Design, G-SEED)에서는 물순환 관리를 평가하고 있다. 하지만, 현재 G-SEED의 평가방법을 살펴보면 빗물관리시설의 설치 정도로 평가하고 있고, 강우 특성 또한 고려되고 있지 않다. 그러므로 본 연구에서는 G-SEED의 빗물관리 및 이용 항목에 대해 수문 모델을 통해 효과를 정량화함으로써 성능에 따라 평가할 수 있는 방법을 제안하였다. 빗물관리 항목에서는 유출저감률을, 빗물이용 항목에서는 빗물이용률을 평가지표로 선정하였고, 각 평가인자를 산출하기 위하여 개념모델을 적용하였다. 빗물이용시설의 경우 초기우수배제장치 용량과 필터 효율에 따른 빗물유입량의 변화와 급수인원에 따른 수요량 변화를 고려한 수문모델을 개발하였고, 수요량과 빗물저장조 용량에 따른 유출저감률과 빗물이용률을 알아보기 위해 MATLAB을 이용하여 모의해보았다. 또한, 옥상녹화의 경우에는 강우, 저류, 증발산, 유출을 고려한 수문흐름모델을 적용하였고, 토층의 두께와 배수(저장) 층의 용량에 따라 모의하여 평가기준을 선정하였다. 제안된 수문모델의 검증을 위하여 서울대학교 기숙사와 35동 옥상녹화의 실측데이터를 비교하였고, 적용성 평가를 위해 RMSE(Root Mean Square Error)와 NSE(Nash-Sutcliffe Efficiency)를 이용하였다. 본 연구에서 제안된 방법을 통해 빗물관리시설의 수문학적 성능에 따른 평가가 가능해질 것이며 설계자와 건축가들로 하여금 실질적인 효과를 내는 시설을 설치하게끔 유도할 수 있을 것이다.

  • PDF

Distortional Analysis of Multicell Box Girders with a Trapezoidal Cross-Section Using Force-Decomposition Method (하중분해법을 사용한 제형 다실박스거더의 뒤틀림 해석)

  • Kim, Seungjun;Park, Nam Hoi;Kang, Young Jong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.6A
    • /
    • pp.779-788
    • /
    • 2008
  • In this present study, the three dimensional shell elements analysis method for exact distortional behavior of multicell trapezoidal box girders subjected to an eccentric loading is proposed. In order to perform the independent distortional analysis using shell elements, it is necessary to calculate exact distortional forces. In this study, the force-decomposition equation for applied eccentric load acting on multicell trapezoidal box girder is derived and the equation based on static force equilibrium and superposition theory decompose the eccentric load to the loads cause flexture, torsion and distortion. So by using this force-decomposition equation and shell element analysis, each behavior can be easily analysis independently. This independent analysis method is very useful to physically understand each major behavior of multicell box girder, especially distortional phenomenon. Furthermore, it may be also very useful for designer to perform the independent distortional analysis for diaphragm design using simple 3D shell elements model without preliminary complex calculation for distortional constants.

A Study on the Design of Task Planning System for Intelligent Excavating System (IES) (지능형 굴삭을 위한 토공작업계획 시스템의 구조 설계)

  • Lee, Won-Sik;Song, Soon-Ho;Lee, Seung-Soo;Seo, Jong-Won;Kim, Sung-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.921-924
    • /
    • 2007
  • 토목, 건축과 관련된 노동현장은 여느 3D 업종들과 마찬가지로 숙련된 기능공의 부재 및 산업재해 발생으로 인해 어려움을 겪고 있으며 이를 극복하기 위한 노력을 계속하고 있다. 대표적인 토목공사인 토공 작업 역시 위험 혹은 유해한 작업환경으로 인해 토공장비의 안전사고 및 생산성과 품질저하가 발생하며 이를 방지하기 위한 장비의 지능화가 절실하게 요구되고 있다. 이를 위해 최근 지능형 굴삭 시스템 개발을 위한 연구가 진행되고 있으며, 토공작업은 일반적으로 광범위한 작업영역을 가지기 때문에 지능형 굴삭시스템의 개발을 위해서는 효율적인 작업을 수행할 수 있도록 하는 작업계획의 수립이 매우 중요하다. 본 연구에서는 작업계획의 대상을 굴삭로봇과 토사로 구분하였으며, 글로벌 영역에서 단위작업 영역, 로컬 영역으로의 분할을 통해 전체 작업 진행에 대해 효율적으로 작업계획을 수립할 수 있도록 구성하여 계획단계에서부터 토공작업 자동화 및 효율와에 기여하고자한다. 토공작업계획 시스템은 토공 작업자 및 감독자의 작업 특성 및 노하우를 컴퓨터, 즉 두뇌에 부여함으로써 숙련된 장비조종자의 작업 방법 및 특성을 반영하여 토공 작업 프로세스 모델링을 구축하고 실제 작업환경상의 센서에 의해 측정된 데이터를 실제 작업환경과 동일하게 모델링된 컴퓨터내의 가상환경을 바탕으로 영역분할, 최적 플랫폼 위치선정 및 작업 순차생성을 통해 최적의 토공작업계획을 수립할 수 있도록 한다.

  • PDF

Problems and Improvement Directions of Fire Protection Designing and Supervising Jobs (소방 설계·감리업의 문제점 및 개선방향에 관한 연구)

  • Cha, Jong-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.12
    • /
    • pp.8745-8752
    • /
    • 2015
  • Since many accidents have occurred in Korea in these days, many people have lost their health and have been damaged. The damages caused by fires which occur to many buildings where many people always reside takes a substantial share of the total damages. And since the proportions of the domestic fire protection designing/supervising industries are relatively much disregarded compared to other kinds of work, it is in the situation that there are many cases of serious damages because the fire protection equipment didn't exert the proper functions on fire after a building is constructed since the supervision against the poor construction along with the inadequate design. In order to improve such situations, in case of the design industry, the criteria on registration and workforce placement, the scope of operation, the design documents required when requesting the agreement to the construction permits, the responsibilities and authorities about the jobs of the fire protection facility designers must be improved and, in case of supervising industry, the registration criteria, the operation scope and the kinds, methods, targets and criteria of supervision, the criteria on the additional placement of assistant supervisors, the contents and scope of work must be improved, the PQ system and Public Supervision System must be reviewed and the systems for preventing any poor supervision must be improved in order to pursue the security of the people and their properties at the same level as the other kinds of work by preparing for the firm position and foundation of the fire protection design and supervision.

Construction EC Strategy Model and Improving Fields for Global EC Transition (건설 EC화 활성화를 위한 상품별 전략모델 및 개선분야)

  • Jang, Hyoun-Seung;Ock, Jong-Ho;Koo, Bon-Sang
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.2
    • /
    • pp.145-153
    • /
    • 2011
  • Since the early 1990s, Korean construction companies have strived to evolve into global Engineering Construction (EC) companies. However, such efforts have been unsuccessful, partly due to a lack of clear objectives and a misunderstanding of the direction that needed to be taken for such a change. A better understanding is required with respect to the need to transform into an EC company in the context of the rapidly changing global construction environment. This research investigates major EC companies from around the world, and assesses the status of domestic companies' efforts for EC transition. The results of these investigations revealed that domestic firms need to better prioritize their strengths for different markets, i.e., decide whether to implement directly, outsource or limit to process management. In addition, the investigations showed that the global market is shifting from monolithic projects to more complex projects. Such projects require firms with the ability to develop and implement high front-end investment strategies, planning capabilities, and pre-design management skills. Accordingly, we recommend that firms differentiate themselves by developing such a skill set required for specific products.

COBie Document Prototype for supporting BIM based Smart Maintenance of Buildings (BIM 기반 건축물 스마트 유지관리 지원 COBie 문서 프로토타입)

  • Koo, Kyo-Jin;Park, Sang-Hun;Cho, Dong-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.12
    • /
    • pp.60-68
    • /
    • 2019
  • For effective building maintenance, the collection and management of various maintenance date such as work history information and material information is required. Despite the introduction of information management technologies and systems to reduce the amount of maintenance work of buildings, which have become larger and more complex, the maintenance information is not being utilized properly. As an alternative, research on the introduction and utilization of BIM is being conducted continuously. However, the BIM models generated at the design phase are not utilized in practice due to a lack of architectural maintenance information. This study proposed a COBie document prototype to support BIM-based smart maintenance tasks performed by building managers. In order to formalize various types of maintenance work procedures, a BIM-based maintenance process model is presented in two categories: inspection and maintenance. Among the BIM attribute data of the BIM model generated at the design phase, the parameters corresponding to the maintenance necessary information for each basic process are derived. Based on this, we proposed a COBie document prototype consisting of seven spreadsheets. The results of a case study confirmed that the KBIMS library-based BIM model created at the design phase without the maintenance information can be used at the maintenance phase.

An Design of Analyzing Process by Construction Extension of Time (공기연장 분쟁의 공사기간 분석 프로세스 설계에 관한 연구)

  • Kim, Beop-su;Seong, Gi-gang;Bae, In-ho;Bang, Hong-soon;Choi, Hyeong-jin;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.4
    • /
    • pp.104-113
    • /
    • 2019
  • Construction dispute about Extension of Time are complexly intertwined with various issues. The duration delay analysis defines the impact the issue has on the duration variation. And The international court and the arbitrator use the results of the analysis as a basis for reasonable duration judging. However, most of the domestic Construction sites have not established a business process for Extension of Time litigation. Therefore, Analysis data are collected after the occurrence of the dispute, there is not enough basic data of analysis almost. This study sought to improve the management efficiency by organizing information requirement for delay analysis and suggesting a reasonable business process. As a result of applying the proposed process to actual construction duration extension disputes, about 33% of practitioners, 46% of contractors, and 48% of legal advisors were satisfied with the process application site And Matrix validation was 91% identical. This study suggests that it is possible to increase the efficiency of the construction duration analysis work used as a basis in the construction dispute. Finally, the Computer based system design for this process should continue in the future.

A Study on Educational Program and Spatial Characteristics of Mixed-use School Facilities C - Focusing on 'Eumteo' of Hwaseong-si, Gyeonggi-do - (학교시설 복합화의 교육프로그램과 공간특성에 관한 연구 - 경기도 화성시 복합화 이음터를 중심으로 -)

  • Seo, Yu-Jung;Shim, Eun-Ju
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.23 no.1
    • /
    • pp.1-11
    • /
    • 2024
  • Complex school facilities are being considered to meet increased public demands for culture and welfare in Korea, given the decreasing population. In this context, Gyeongi-do Hwaseong City's E-umteo is recognized as a relatively well-operated school complex. Therefore, this study considered seven E-umteo branches as case studies to examine the operations of educational programs and understand the techniques employed in the spatial configuration of E-umteo. To this end, field observations and interviews with facility operators were conducted. The case analysis results revealed that educational programs could be classified into three types: learning sharing , community communication, and lifelong learning. Furthermore, the learning sharing type was classified into education and physical education while the community communication type was classified into the community and convenience types. Meanwhile, lifelong learning was identified as the most actively used type by differentiating specialized programs. With regard to the spatial composition between the school and the "pitcher," only the connection and independent types were observed, and no integral type was discovered. Therefore, integrated future studies are mandated.