• Title/Summary/Keyword: 건축물유지관리

Search Result 502, Processing Time 0.027 seconds

Technical Index for the Maintenance of Watertightness of the Roof of a Large-Span Membrane Structure (대공간 막 구조물 지붕의 수밀성능 확보를 위한 유지관리 지표 연구)

  • Oh, Sang-Keun;Kim, Dong-Bum;Lee, Sun-Gyu
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.1
    • /
    • pp.51-59
    • /
    • 2011
  • With the increased demand for membrane structures in recent years, there have been many studies of their mechanical properties, to the extent that such structures have become recognized as independent structures with a level of safety and durability comparable to those of other general structures. But in reality, the study for the maintenance of membrane structures has not been as active. In particularly, the study of watertightness from the perspective of maintenance has been very limited. Accordingly, a study on securing watertightness performance and the guidelines for maintenance is necessary. In this study, through a case study of water leakage accidents in membrane structures overseas, causes of leakage were selected from the membrane material itself, joint parts and open door of roof part in membrane structure. The water leakage and deterioration elements were analyzed from those leakage causes. The degree of importance of the water leakage and deterioration index was also designated using the AHP (Analytic Hierarchy Process) method. As a result, the basic technical index was suggested for the maintenance of the roofs of large-span membrane structures to prevent water leakage. This index will be used to make a guideline for the long-term maintenance of the roofs of large-span membrane structures.

Integration of 3D Laser Scanner and BIM Process for Visualization of Building Defective Condition (3D 레이저 스캐닝과 BIM 연동을 통한 건축물 노후 상태 정보 시각화 프로세스)

  • Choi, Moonyoung;Kim, Sangyong;Kim, Seungho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.2
    • /
    • pp.171-182
    • /
    • 2022
  • The regular assessment of a building is important to understand structural safety and latent risk in the early stages of building life cycle. However, methods of traditional assessment are subjective, atypical, labor-intensive, and time-consuming and as such the reliability of these results has been questioned. This study proposed a method to bring accurate results using a 3D laser scanner and integrate them in Building Information Modeling (BIM) to visualize defective condition. The specific process for this study was as follows: (1) semi-automated data acquisition using 3D laser scanner and python script, (2) scan-to-BIM process, (3) integrating and visualizing defective conditions data using dynamo. The method proposed in this study improved efficiency and productivity in a building assessment through omitting the additional process of measurement and documentation. The visualized 3D model allows building facility managers to make more effective decisions. Ultimately, this is expected to improve the efficiency of building maintenance works.

An Experimental Study on the Heat Storage Properties of Phase Change Material Using Paraffin Sheets in Building (파라핀을 이용한 건축용 시트형 잠열축열재의 축열특성에 관한 실험적 연구)

  • Ko, Jin-Soo;Kim, Byung-Yun;Park, Sung-Woo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.5
    • /
    • pp.435-441
    • /
    • 2011
  • The life cycle assessment on greenhouse gas emission of reinforced concrete buildings shows that more than 70 percent of greenhouse gas that is discharged by a building is discharged in the building maintenance stage, including cooling and heating. To reduce the greenhouse gas emission, maintenance planning to minimize the energy consumption is necessary in the design stage. In this paper, two heat storage rooms are tested to save the air cooling energy of the buildings. The specimens are essentially identical, except that chamber A contained paraffin sheets as the finishing material, while the other, chamber B, served as a control. The test results show that chamber A with the paraffin sheets exhibited less temperature change than chamber B without the sheets when temperature was increased outside of the specimens. The heating energy was probably consumed in the phase change of the paraffin sheets, which can be useful for reducing energy consumption related to air cooling during the summer.

A Study on the Status and Actual Condition of Suspended Buildings in Gangwon (강원도 공사중단 건축물의 현황 및 실태 조사 연구)

  • Suhr, Myong-Suk
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.7 no.2
    • /
    • pp.138-144
    • /
    • 2019
  • To analyze the present state of buildings suspended in Gangwon and estimate the compressive strength by visual inspection and Schmidt hammer method in order to analyze durability etc.. In this study, we analyzed the problems that existed in the location where construction is suspended and efficient management method. Expected construction restoration of construction will be restarted, and important parts of the construction site should be given the best protection measures so that the quality can be maintained thoroughly. The construction of the suspended construction is exposed to the freezing and thawing damage over time. Therefore, it is necessary to take measures such as maintenance, and take protective measures by establishing a plan to improve the durability of buildings that are under construction.

Evaluation on Fire Available Safe Egress Time of Commercial Buildings based on Artificial Neural Network (인공신경망 기반 상업용 건축물의 화재 피난허용시간 평가)

  • Darkhanbat, Khaliunaa;Heo, Inwook;Choi, Seung-Ho;Kim, Jae-Hyun;Kim, Kang Su
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.25 no.6
    • /
    • pp.111-120
    • /
    • 2021
  • When a fire occurs in a commercial building, the evacuation route is complicated and the direction of smoke and flame is similar to that of the egress route of occupants, resulting in many casualties. Performance-based evacuation design for buildings is essential to minimize human casualties. In order to apply the performance-based evacuation design to buildings, it requires a complex fire simulation for each building, demanding a large amount of time and manpower. In order to supplement this, it would be very useful to develop an Available Safe Egress Time (ASET) prediction model that can rationally derive the ASET without performing a fire simulation. In this study, the correlations between fire temperature with visibility and toxic gas concentration were investigated through a fire simulation on a commercial building, from which databases for the training of artificial neural networks (ANN) were created. Based on this, an ANN model that can predict the available safe egress time was developed. In order to examine whether the proposed ANN model can be applied to other commercial buildings, it was applied to another commercial building, and the proposed model was found to estimate the available safe egress time of the commercial building very accurately.

Evaluation on the Fire Resistance Performance for High-Rise Modular Walls (중·고층형 모듈러 벽체의 내화성능 평가)

  • Yang, Seung-Cho;Lee, Jae-Sung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.4
    • /
    • pp.15-22
    • /
    • 2019
  • The use of modular buildings is increasing because of various advantages of modular buildings. But there are limits to apply modular buildings to medium-rise buildings because the building law provides only the specification criteria of the modular building with respect to the 1 hour fire resistance performance. This study was conducted to investigate 2 hours fire resistance performance of load bearing walls with steel studs in modular buildings by KS F 2257-1 and KS F 2257-4. After full scale tests, load bearing walls ensuring two hours fire resistance performance consist of at least 2 layers of fire resistance plaster boards of 19mm thickness or 3 layer of fire resistance plaster boards of thickness.

Shear Bond Strength of 3D Printed Concrete Layers According to Water Cement Ratio and Printing Time Gap (물시멘트비와 프린팅 시간간격에 따른 3D 프린팅 콘크리트 레이어의 전단부착강도)

  • Kim, Jin-Ho;Lee, Yoon Jung;Jeong, Hoseong;Kim, Kang Su
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.25 no.6
    • /
    • pp.199-208
    • /
    • 2021
  • The extrudability of 3D printed concrete and its member strength can be highly influenced by water cement ratio (W/C) and printing time gap (PTG). In this study, mold cast specimens and 3D printed specimens were fabricated with variables of W/C ratio and PTG, and their shear bond strength and interlayer surface moisture content were measured and analyzed. The test results showed that the shear bond strength is greatly influenced by the amount of interlayer surface moisture. It is thus recommended that proper amount of interlayer surface moisture with respect to PTG needs to be maintained to have a required interlayer shear bond strength. In addition, further research is required to estimate the effect of many environmental factors that can influence the interlayer surface moisture content.

An Analysis on the Structural Deterioration Properties of Timeworn Masonry Buildings in Metropolitan Area (대도시 지역의 노후 조적조 건축물의 구조 성능 열화 특성 분석)

  • Kwon, Ki-Hyuk;Lee, Kyoung-Yong;Yang, Hee-Suk
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.7 no.4
    • /
    • pp.181-189
    • /
    • 2003
  • Because of the gravitation of population toward large cities, a number of masonry buildings have been constructed since 1960. They have been rapidly deteriorated as time passed by. Therefore the purpose of this paper is to present basic data on timeworn masonry buildings which have been managed by metropolitan government and to analyse their deterioration factors. And then, the results of this paper can be used to establish the policy of managing timeworn masonry buildings. According to this study, the crack of masonry wall is the most effective deterioration factor and timeworn masonry buildings have a problem with foundation. The structure grade have an interrelation with occupancy type more than building age. Also, the longer building age becomes, the sooner deterioration speeds. A timeworn masonry building is in urgent need of reinforcement on a thirty-year period of building age.

An Experimental Study on the Physical Property of Lime Mortar in the Building' Masonry (조적조 건축물의 석회 모르타르 특성에 관한 실험적 연구)

  • Kwon, Ki-Hyuk;Yu, Hye-Ran
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.5 s.57
    • /
    • pp.133-141
    • /
    • 2009
  • 50 year-old masonry buildings which had been constructed using lime mortar have caused lots of problems because of using different material, cement mortar, when they repair them. Also, there is little information on structural capacities and details of masonry buildings built using lime mortar. In addition, it is difficult to evaluate the structural capacities of the buildings which were often constructed by untrained labors. To preserve the original masonry construction, the study on their construction materials and methodologies has to be carried out. This paper provides basic information for establishing standard details of masonry works using lime mortar in order to overcome these problems when cultural properties are repaired or retrofitted. To do this, compression tests of lime mortar were preformed with the parameters of mixing ratios, mixing material, curing time and curing conditions etc. Based on the test results, the differences between lime mortar and cement mortar were specified and the structural characteristics of lime mortar were also presented in this paper.

Development Method of Open BIM Data for Facility Space Management (시설물 공간관리를 위한 개방형 BIM 데이터 구축 방안)

  • Cho, Geun-Ha;Ju, Ki-Beom
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2015.07a
    • /
    • pp.321-322
    • /
    • 2015
  • 본 연구는 BIM의 최종 모델(As-built Model)이 BIM기반 유지관리 시스템(Facility Management System)에 활용되는 것을 전제로 하며 유지관리 분야 중 공간관리 분야에서 활용되는 BIM 모델을 구축하기 위한 방안을 제시한다. 연구의 최종 결과물인 BIM 유지관리 가이드라인은 향후 BIM 발주 지침에 반영되어 건설과정에서 구축된 BIM 정보를 유지관리 단계까지 지속적으로 활용하도록 유도할 것이라 기대한다.

  • PDF