Management Method in the Education Facilities of the Construction Process through Value Engineering(VE) Case Study (VE 사례분석을 통한 교육시설 건축공사 단계별 관리방안)

  • Kim, Hag-Joo;Mun, Gwang-Bae;Go, Seong-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.129-132
    • /
    • 2012
  • Value Engineering(VE) process is going to make a series of improvements for the effective construction project management or optimal proposal to improve quality, performance improvement, cost reduction and customer satisfaction. For making the quality model based on better than the architecture that is required in the VE, such a project promoting creative plan, functionality and constructability reflecting the materials and improved construction methods and building life cycle for reviewing the smooth progress of the construction projects may be necessary for management techniques. This study is to establish a management plan in the educational facilities construction process through education institution's recent orders completed by VE case study.

  • PDF

Analysis of the Importance from Detailed Work (Role) of the Construction Manager for G-SEED Certification in the Design Phase (녹색건축인증을 위한 설계단계 건설사업관리자의 세부 업무(역할)별 중요도 분석)

  • Lee, Duhwan;Kang, Seongmi
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.103-112
    • /
    • 2020
  • In this study, based on actual project implementation cases, task management plans for construction management related green building certification were derived in major stages. Accordingly, the importance from details of construction management tasks for the operation and management process of the schematic design phase, design development phase, and construction document phase, focusing on G-SEED certification, was analyzed. In addition, major items were derived based on the weight of additional construction costs and acquisition scores through previous research cases on the analysis of construction costs for G-SEED certification, and the importance from details of construction management tasks on the major items of G-SEED certification was analyzed. As a result, the review and confirmation of the elements of reflection related to G-SEED in the schematic design phase, the adequacy of design documents and the connectivity of design phase in the design development phase were important. And the review and confirmation of the items directly related to the construction phase in the construction document phase were important.

BIM Application for Civil Engineering Project in Planning and Design Phases (토목공사 기획 및 설계단계의 BIM 적용방안 연구)

  • Kang, Leen-Seok;Kim, Seol-Gi;Kim, Hyeon-Seung;Moon, Hyoun-Seok
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.26-31
    • /
    • 2011
  • Due to the characteristics of 3D objects of building construction projects which have regular, vertical and repetitive shapes, the most practical utilization of BIM in the country is focused on building projects. The characteristics of 3D objects of civil engineering project have irregular, horizontal and non-repetitive shapes. Therefore, consisting of a practical BIM model is difficult comparing with building project. This study suggests an application process of BIM for the planning and design phases for civil engineering project. A BIM system is developed based on suggested BIM process and it is verified through a bridge construction project.

Application of Activity-Based Costing(ABC) for Modular Construction Quality Management (활동기준원가계산을 이용한 모듈러 건축 프로젝트의 품질관리방안)

  • Lee, Jeong-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.5
    • /
    • pp.485-496
    • /
    • 2022
  • Modular construction projects offer advantageous over conventional construction projects in the area of quality control through factory production. However, as clear standards and definitions for quality control activities have yet to be not established, it is difficult to judge the appropriateness of the scale of quality control costs, and it is also difficult to classify quality control activities by process stage. Therefore, in this study, a method for classifying quality management activities based on activity standards was presented, in addition to a method for classifying quality costs according to the PAF standards to check how effective the costs and activities are for quality control in the future. The findings of this study can be used to define the quality management activities for each stage of the modular construction project in the future, and to develop a database of evidence to determine the appropriateness of cost distribution accordingly.

A Study on the Actual Construction Database Modeling and Application for Commercial Buildings (상업건축물의 공사칠적 데이터베이스(DB) 모델구축 밑 응용방안)

  • Kim Sun-Kuk;Lee Sung-Ho;Kim Tae-Hui;Joo Jin-Kyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.1 s.9
    • /
    • pp.83-90
    • /
    • 2002
  • Actual construction data are unsystematically handled and uselessly hoarded after completion of the project although actual construction data can be applied to the various works of the future projects. Many researches have been carried out by several engineers and scholars of construction firms and research institutes, but the level of the application is not plausible yet. The objective of this paper is to propose a web-based data model and application system for commercial buildings in order to enhance the usability of the actual construction data on line. The principal factors of commercial building project data and the user$^{\circ}{\phi}s$ requirements in various areas, such as planning, design, procurement and construction and so on are analyzed to implement the database structure of the proposed system. The application of resource Information focused on cost, manpower, equipment is included in the system, which is expected to enhances the usability of actual database application system compared with other researches proposed so far.

The Development of Schedule Risk Management Tools at the Preconstruction Phase in Building Construction - Focused on the Steel Work - (건축공사 착공 전 단계의 공정리스크 관리도구 개발 - 철골공사 중심으로 -)

  • Suh Sang-Wook;Yoon You-Sang;Kim Sun-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.177-185
    • /
    • 2005
  • The purpose of this study is to develop a supporting tool for efficient management, at preconstruction phase, of the schedule risk that is able to generate at construction phase. The main contents of this study to develop a practical tool are as follows. First steel work was selected as a relevant trade and a risk breakdown structure focused on the process of steel work having large effect on total construction process was made. Secondly, the work flow considering schedule risk factor was made and schedule risks that must be managed preferentially through analyzing the grade of importance for risk was selected. Finally, based on above two procedure, the management form for schedule risk was developed It is necessary to accumulate abundant data for schedule risk for other construction process and to develop a manual and a schedule risk management system.

A Study on the Application of Supply Chain Management in Curtain Wall Engineering (커튼월 공사에서의 공급사슬관리 적용에 관한 연구)

  • Park Sang-Woo;Park Sang-Jun;Kwon Won;Kim Chang-Duk;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.301-304
    • /
    • 2004
  • The curtain wall engineering of local high-rise buildings consists of many phases such as design, curtain wail design, manufacture, procurement, construction and facility management, each of which also involves many' actors such as architect, curtain wall consultants, manufacturers, contractors, and facility managers. Moreover, the method for controlling the C/W process of each participant is needed. Eliminating wastes and problems existed in the C/W process can be more effective. What is more, it is necessary to improve the efficiency of the current process and to strengthen the competence through application of SCM to the C/W life-cycle. In addition, it is important that a ]ot of information transfer smoothly and share through information system. Therefore, this study aimed to propose the scope of application and the improvement directions in applying Supply Chain Management concept.

  • PDF

Decision Model of Construction Errors Management Based on Modular Method Construction Process (모듈러 공법의 시공 프로세스 기반 시공 오차 관리 의사 결정 모델)

  • Shin, HyunKyu;Kim, SuYoung;Ahn, YongHan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.6
    • /
    • pp.98-108
    • /
    • 2017
  • Recently, the development of middle and high-rise building technology using modular construction method has emphasized the importance of site construction error management. The modular construction method is very limited to adjust the construction error in the field because of the factory production characteristics. Therefore, in order to prevent the construction error in advance, a management plan reflecting the characteristics of the modular construction method is required, and it is important to make the decision of the construction participant at each stage. This study analyzed the factor of construction error of modular construction and suggested a decision support model for construction error management based on construction process. The result of this study is expected to be a guideline for the modular construction participant to derive the construction error management plan.

The Design and Construction Management of Exposed Concrete Finish Work through the Construction Process Analysis (노출콘크리트 마감공법의 시공 프로세스 분석을 통한 설계 시공관리 방안)

  • Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.160-170
    • /
    • 2005
  • Because designers want to express various elevation, architectural concrete has recently paid attention to finish material and has increasingly used in the construction. architectural concrete needs more careful and professional supervision works such as controling quality of color, texture, construction plan, and design plan. none the less, It is not clear to define process and manage methods for the construction life-cycle, which causes the expense to increase and the quality to be poor. this study will analyze concrete finish method by dividing three parts which are common, exposed and architectural concrete finish method. definition and the limit of application in architectural concrete finish method will be present by comparing three methods. Throughout an interview with a staff in charge and a case study, this paper shows the requirement and the keynote of management which are divided by three steps; the design, construction and maintenance. finally, this research provides management methods of individual steps for effective construction.

Application of Supply Chain Management Concept to the Various Types of Curtain Wall Construction (커튼월의 공법 및 조달 유형에 따른 SCM 적용방안)

  • Moon Woo-Kyoung;Yun Soo-Won;Kim Yea-Sang;Chin Sangyoon;Park Ji-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.612-615
    • /
    • 2004
  • Today, the curtain wall is used in many construction projects because of excellent economical efficiency and constructability. The life-cycle process of curtain wall construction consists of the architectural design, curtain wall design, manufacturing, const겨ction, and maintenance phase which has become one of the most important objects that have to be managed. Since the general management method focused on each separated phase, it has accompanied many problems such as increases of the cost and duration, and loss of productivity. To solve these problems, it is necessa교 to have a new management method based on supply chain management. Thus this research analysed the processes of stick system, semi-unit system, unit system, and panel system classified by the type of the curtain wall, and suggested proper methods of application of SCM concept to each type of curtain wall construction.

  • PDF