• Title/Summary/Keyword: 건축계획 및 설계

Search Result 234, Processing Time 0.03 seconds

Availability Evaluation System for Remodeling of Existing Apartment Houses (기존 공동주택의 리모델링 용이성 평가 체계)

  • Cha, Woo-Cul;Lim, Byung-Wook;Shin, Chang-Hyun;Shin, Byung-Hyun;Lee, Jea-Sauk;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.204-213
    • /
    • 2008
  • Apartments production without a previous example is existed by suddenly rapid growth of population and city. So this mass producted aged Apartments have many problems that is aged and staleness. Confrontation of obsolete and staleness is Build&Scrap and Remodeling. But Remodeling is much better than Build&Scrap Because Remodeling has Social, Economical, Environmental merits. This Research is Feasibility Evaluation System on an object of Remodeling. Feasibility Evaluation means Possibility on Objective action on aiming action in other words. It means degree of difficulty about purpose to act. Remodeling is based on existing apartment, to improve ability and performance of existed aged Apartment and by engineering technique and method. A point of view, development of Remodeling technique and popularization is necessary as well as Remodeling Plan and Construction technique of applied Existing building logical Approach is that. The purpose of this paper is handling allowance range of Remodeling Plan and Achievement accomplishment Feasibility Evaluation of purpose and objective and Understanding. Remodeling Feasibility is evaluated by two aspects. The first is Macro Level Approach of Remodeling Feasibility Evaluation on a Apartment Complex, and The second is Micro Level Approach of Remodeling Feasibility on each housing part is evaluated about removal and dismantlement.

Exploring the Theoretical Trends of an Integrated Environmental Design (통합적 환경설계 이론 기초 연구)

  • Ahn, Myung-June;Pae, Jeong-Hann
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.37 no.2
    • /
    • pp.14-25
    • /
    • 2009
  • We live in an age which is exponentially growing as the knowledge paradigm is changing. New sites are subject to contemporary landscape architecture function as "fields" in which this hybrid aspect is both actively practiced and becoming a catalyst for change in the area of landscape architecture. With this as its background, this study attempts to deal with how the aspect of integration in environmental design is manifested. For this purpose, the tendencies for the discussion of integration in various fields of practice were examined: planning theories, urban theories, architecture, public environment, engineering, and landscape architecture. As yet, the discussions of interdisciplinary integration, which occur in practice in these respective fields, mainly tend to be oriented toward the effective implementation of the merits of other related fields. Seen from these examples of practice, integrated design approaches can be found in the following three aspects: design objects, respective professional areas, and methodologies of approaches and design. In terms of design objects, the positions of individual design subjects present themselves as most obvious, and integration or combination of the physical targets that come to exist through design can be easily seen. Most examples of integration turn out to be this, in almost every case of which the theme and the target of expression are integrated via a small number of certain methods. In terms of professional areas, what can be mainly evidenced is how the individual subject acts when the subject designs. The strong points of professionals from each field seem to create synergy, achieving through integration optimum results. In terms of methodologies of approaches and design, there are attempts to create integrated approaches as ways of effective decision-making, in which case the integration of all of the interest parties is of primary concern. As yet, few instances have been found in which integrated design has had enough strength to be seen as a concrete design methodology based on practical examples. However, it is encouraging that theoretical approaches and the necessity for integrated design have been identified from multiple perspectives, and that a practical movement such as landscape urbanism has come into active being. The authors of this study find this point in time to be ripe for discussions on integrated practices in terms of environmental design, on the basis of the synthetic approaches mentioned above.

건설산업경쟁력 강화와 부실방지대책(안)

  • 한국주택협회
    • 주택과사람들
    • /
    • no.54 s.71
    • /
    • pp.185-206
    • /
    • 1996
  • 1.건설제도의 국제화와 경쟁기반 구축 $\bullet$건설산업을 기획$\cdot$설계$\cdot$시공$\cdot$감리$\cdot$사후관리 등 전 분야에 걸쳐 경쟁력 있는 산업으로 육성-기획$\cdot$설계$\cdot$시공$\cdot$감리$\cdot$유지관리 등 건설산업 전반에 관한 기본사항을 법제화-대규모 공사의 경우 발주자를 대신하여 건설공사의 기획$\cdot$설계$\cdot$발주$\cdot$감리$\cdot$시공관리 등 업무의 전부 또는 일부를 종합적으로 조정$\cdot$관리하는 $\lceil$건설사업관리$\rfloor$제도를 도입 $bullet$건설공사 $\lceil$현장실명제$\rfloor$도입을 통한 하도급제도의 정비-전문건설업자로부터 하도급, 위탁, 고용 등의 형태로 공사에 참여하는 현장근로자를 신고 받아 권익을 보호하고 시공책임도 부과하는 $\lceil$현장실명제$\rfloor$도입 $\bullet$공사완성보증제, 손해배상보증제도를 도입하고, 신용상태 $\cdot$시공능력에 따라 보증 요율 등을 차등화 하여 부실업체를 배제 $\bullet$건설공사관련 각종 계약서와 시방서 등 제기준을 정비하여 발주자$\cdot$시공자 등 건설주체간의 역할과 책임을 명확화$\bullet$건설분쟁을 신속하고 객관적으로 조정$\cdot$중재하기 위하여 $\lceil$건설분쟁중재원$\rfloor$으로 확대 개편 2. 건설인력의 육성과 고용안정$\bullet$경쟁력 제고의 관건인 우수인력 확보를 위하여 대학교육 제도의 개선을 포함한 건설 인력 수급대책을 추진 - 대학의 건설관련 학과 정원을 2000년까지 매년 일정규모로 증원하여 고급기술 인력을 배출 현재 50$\%$에 불과한 건설관련 국가기술자격자를 2000년에 70$\%$까지 제고 - 감리 등 전문인력을 양성하고, 선진외국 감리 회사를 활용하여 국내 업계와의 경쟁을 유도 $\bullet$건설현장의 최일선에서 품질을 담당하고 있는 건설기능공의 고용안정과 복지향상을 위한 획기적인 대책을 마련 - 건설기능공의 자긍심과 사회적 책임의식을 고취하기 위해 기능공이 여러 현장을 전전하여 근무하더라도 경력관리, 공제금 등의 합산 관리가 가능하도록 $\lceil$건설 근로자 복지카드$\rfloor$제도를 도입 *$\lceil$건실시연구단$\rfloor$을 구성$\cdot$구체적인 운영방안을 수립 - 건설 업체 실정에 맞는 현장위주의 기능검정제도 도입 $\cdot$자격증이 현장에서 요구되는 기능수준과 숙련도를 제대로 반영할 수 있도록 검정방법을 현장 실기위주로 개선하고 자격검정업무도 건설협회 등의 자격 검정능력을 향상시켜 위탁$\cdot$시행하는 방안을 검토 3. 공사시행기관의 전문성과 책임성 제고 $\bullet$시장이 개방되어 건설공사가 국제적인 관행에 따라 이루어질 것에 대비하여 시행기관에 계약$\cdot$공사관리 등 전문직공무원을 집중 교육하여 양성 $\bullet$ 조달청이 대행하여 공사계약을 하는 경우라도 설계변경은 발주기관이 자체적으로 할 수 있도록 허용 $\bullet$ 기술직 공무원의 기술향상을 위하여 관련 공무원의 확충, 해외연수, 현장교육 강화 등을 지속적으로 추진 $\bullet$ 충분한 사전조사를 거쳐 사업계획을 수립하도록 $\lceil$건설공사 시행절차$\rfloor$를 규정 $\bullet$ 공사기간 3년 이상의 공사에 대하여는 최대한 계속비사업으로 편성토록 계속비제도의 운영을 활성화 4. 건설현장의 품질관리체제 구축 $\bullet$ 현장배쳐플랜트 설치를 확대하여 레미콘의 품질관리를 일원화하고 현장에서 레이콘을 배합하는 건식공법을 채택 - 현장레미콘생산시설(B/P)설치 확대로 콘크리트 하자에 대한 책임한계 일원화 유도 - 레미콘 재료인 골재$\cdot$시멘트$\cdot$물을 공장에서 혼합하여 공급하는 현행 습식배합 대신에 물만을 현장에서 혼합하는 건식 배합방식을 도입 $\bullet$철강재$\cdot$철구조물의 품질을 보증하기 위하여 일정기술을 갖춘 공장에서만 제작토록 하는$\lceil$공장인증제$\rfloor$를 도입 - 제작시설과 품질관리 등을 심사하여 제작공장을 등급화하고 등급에 따라 철강재 등의 제작업무 범위를 차등화 $\bullet$시설물에 대하여도 시공업체가 제작공장을 등급화하고 등급에 따라 철강재 등의 제작업무 범위를 차등화 $\bullet$시설물에 대하여도 시공업체가 사후관리를 일괄 책임질 수 있도록 $\lceil$시공 및 유지관리 일괄계약제도$\rfloor$를 도입 - 대형교량$\cdot$소각로$\cdot$하수처리장 등 유지관리에 전문성이 요구되는 분야부터 시범적으로 도입 $\bullet$건설자재의 표준화$\cdot$정보화사업을 조속히 추진 5. 건설업체에 대한 지원 강화 $\bullet$일부 공공사업자의 경우 관행화되어 있는 대금일부의 어음 또는 채권지급방법을 단계적으로 축소 $\bullet$매월 감독이나 감리원의 기성확인에 의하여 시공자에게 공사대금을 직접 지급토록 하는 등 대금 지급절차를 간소화 6. 민간 건축물에 대한 안전확보 $\bullet$충실한 설계가 이루어지도록 제도를 개선 - 설계도서 작성기준을 제정하고 다중이용시설에 대하여는 건축심의단계에서 구조검토 등 설계심의를 의무화 $\bullet$대형다중이용시설에 대한 감리 강화 - 감리전문회사 수준의 감리체제로 전환하고 감리대가도 공공수준으로 인상하고 적용요율대로 지도$\cdot$감독 강화

  • PDF

Implementation of a Legal Information Service System for Land Usage Regulations (토지이용규제 법률정보서비스 시스템의 구현)

  • Lee, Bum-Suk;Moon, Kyung-Won;Hong, Sung-Han;Kim, Eui-Chan;Hwang, Byung-Yeon
    • Journal of Korea Spatial Information System Society
    • /
    • v.8 no.3
    • /
    • pp.39-50
    • /
    • 2006
  • Rapid growth of the domestic economy caused a lot of the demand of land information. The land information system has to keep the records of the various data about land that includes its owner and usages. Also the system must present adequate results that have been accumulated upon a user's request. Since Korean Government enforces 'Law of National Land Usage and Management', the land in rural area was also tightly regulated as much as that in the urban area. In fact, when people wants to develop their land, then they realize that their land has many restrictions and regulations to use. Sometimes, they find many regulations and restrictions even in a parcel. Thus, many people quite often want to know all the laws, rules, regulations, and restrictions etc., whatever applicable on the land they are interested in. to use. The purpose of this paper is to show a legal service system that precisely presents all the related laws, regulations, and restrictions. for a piece of the land. It summarizes the search results on users' requests. It uses a knowledge-based expert system to figure out the users requests. In this paper, we designed the system architecture of the software, and implemented its prototype. The results on this system show more concise and user friendlier than those of the existing systems.

  • PDF

A Study on Automatic Solar Tracking Design of Rooftop Solar Power Generation System and Linkage with Education Curriculum (지붕 설치형 태양광 발전 시스템의 태양 위치 추적 구조물 설계 및 설치 실증 기법의 교육과정 연계)

  • Woo, Deok Gun;Seo, Choon Won;Lee, Hyo-Jai
    • Journal of Practical Engineering Education
    • /
    • v.14 no.2
    • /
    • pp.387-392
    • /
    • 2022
  • To participate in global carbon neutrality, the Korean government is also planning to carry out zero-energy building certification for all buildings by 2030 through the enforcement decree of the 'Green Building Support Act'. Accordingly, the government is providing various projects related to solar power generation, which are relatively close to life. In particular, roof-mounted photovoltaic power generation systems are attracting attention in terms of using unused space to produce energy without destroying the environment, but low power generation efficiency compared to other photovoltaic power generation facilities is pointed out as a disadvantage. Therefore, in this paper, to solve this problem, we propose an efficient solar panel angle variable system through research on the solar panel structure for single-axial solar tracking, and also consider the application environment of the roof-mounted solar power generation system. Suggests measures to prevent damage and secondary damage. In addition, it is judged that it is possible to control the solar panel based on ICT convergence and configure the accident prediction safety system to link the project-based education program.

Problems and Solutions of LCC Analysis in BTL Project for Education Facilities (교육시설 BTL 사업에서 LCC 분석의 문제점도출 및 해결방안)

  • Kim, Chung-Yung;Hong, Tae-Hoon;Hyun, Chang-Taek;Lee, Hyun-Jong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.182-192
    • /
    • 2008
  • The purpose of this research is to identify problems and solutions of domestic Life Cycle Cost analysis in BTL(Build-Transfer-Lease), a PFI(Private Finance Initiatives) project. It is expected BTL would be quite effective delivery method for public construction introducing the private's major capital investments and technologies, and obviously LCC analysis is becoming more important factor for success of BTL projects. Nevertheless, there are still some complicated issues in LCC analysis, a technique for selecting the optimal VE(Value Engineering) proposals and estimating OM&R (Operation, Maintenance, & Repair) cost of the buildings, and has been applied limitedly. This research mainly focuses on educational facility, as most frequently delivered by BTL currently, especially with two levels (Alternative LCC and Building LCC) , which is occupied main potion in BTL project. In addition, it identifies four main problems and suggests their solutions through case studies focusing six major factors (WBS, Repair Information, Life Cycle, Time value of money, Repair Information Database, LCC Model) from three projects. Advanced development of this research requires closer partnership between the private / public sectors, and their long term strategies.

Quantification of uncertainty in hydrogeological characteristics using parameter estimation method (매개변수 보정법을 활용한 수리지질특성의 불확실성 정량화)

  • Tae Beom Kim;Chaeryung Oh;Dongwon Park;Chihyung Lee
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.401-401
    • /
    • 2023
  • 터널이나 폐기물저장소와 같은 지하 구조물 또는 지표에서부터 상당한 깊이로 설계되거나 건설되는 구조물을 계획하거나 건축할 때 구조물의 안전성에 영향을 주는 수많은 요인 중에 간과할 수 없는 것이 바로 지하수이다. 뿐만 아니라 지상 혹은 지하에서 오염이 발생하여 오염물질이 지중환경으로 유입되는 경우, 지하수 거동은 오염물의 이송·확산에 지대한 요인으로 작용한다. 최근에는 지구온난화와 같은 유례없는 기후변화를 경험하고 있고, 따라서 수자원으로써 지하수의 역할이 더욱 중요해지고 있다. 지하수의 저류와 거동은 지하매질의 특성에 지배되고 있지만, 지표 아래 자리잡고 있는 매질의 특성을 정확히 파악하기란 매우 힘들고, 따라서 지하수 거동을 해석함에 항상 불확실성이 존재한다. 전통적으로 지하매질의 특성을 이해하기 위해 다양한 지구물리탐사를 수행하여 왔고, 더욱 직접적인 관찰을 위해 시추를 수행하여, 시료를 수집·관찰하고, 시추공에서의 다양한 현장수리실험을 통해 수리특성을 알고자 하였다. 하지만 그동안의 다양한 노력에도 불구하고, 지하매질 및 지하수 거동에 대한 불확실성은 여전히 줄어들지 않고, 오히려 증가하고 있다. 따라서, 본 연구에서는 지하수 거동을 결정짓는 지하매질의 수리특성에 대한 불확실성을 정량화하기 위한 도구로써, 매개변수 보정법의 하나인 Pilot Point Method(PPM)을 소개하고자 한다. 우물 또는 관측정을 통해 관측되는 지하수의 수위는 지하매질의 특성을 반영하고 있으며, 인간이 가장 쉽게 취득할 수 있는 지하 정보에 해당한다. 지하수 수위를 이용하여 수치모형의 매개변수를 보정하게 되며, 이 때 PPM이 적용된다. Pilot points의 공간적인 분포에 따라 다양한 보정 결과가 산출될 수 있으며, 다양한 결과들을 통해 변동계수를 산정한 후 수리특성의 불확실성이 높은 지역을 나타낼 수 있다. 본 연구를 통해 얻은 결과는 물리탐사 또는 시추 작업을 위한 위치 선정의 기초자료로 활용될 수 있다.

  • PDF

Present Status of Hydrogen Refueling Station in KIER (KIER 수소충전소 구축 현황)

  • Seo, Dong-Joo;Seo, Yu-Taek;Seo, Yong-Seog;Park, Sang-Ho;Roh, Hyun-Seog;Jeong, Jin-Hyeok;Yoon, Wang-Lai
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2006.06a
    • /
    • pp.21-24
    • /
    • 2006
  • 수소의 소규모 분산 생산 기술은 본격 적 인 수소 인프라가 도입되기 전에 연료전지 자동차의 수소 충전용이나 분산 발전형 연료전지의 수소 공급을 위해 필요하다. 생산 용량은 수소 기준으로 $20{\sim}100 Nm^3/hr$ 정도로 현재로선 천연가스의 수증기 개 질법이 가장 경제적인 공정으로 알려져 있다. 소규모 생산에 따른 열효율 저하를 줄이 기 위해 단위 공정들이 통합된 컴팩트 개질 시스템의 개발이 필요하다. 연료전지 자동차용 수소 인프라 조기 구축을 위하여 수소충전소 구축과 국산화 천연가스 수증기 개질기 개발을 병행하여 진행하였다. 수소 충전소 구축 부분은 충전소 부지 확보, 건물 건축, 각종 유틸리 티 설치의 토목 부분과 천연가스 개질형 수소 제조 유닛 설치, 수소 압축, 저장, 디스펜싱 시스템 설치를 포함하고 있으며 고압 설비에 대한 인허가 대응 및 안전대책 작업도 진행하였다. 구축된 수소충전소는 향후 연료전지 자동차 연계 실증 프로그램에 활용할 수 있다. 국산화 핵심 기술 개발을 위하여 열 및 시스템 통합 설계에 의 해 천연가스 수증기 개질기를 제작하고 내부 열교환 구조에 따른 개질기의 성능을 평가하였다. 개발된 개질기는 개질온도 $720^{\circ}C$, 수증기 대 카본 비 2.7의 운전조건에서 $23Nm^3/h$ 이상의 수소 생산이 가능하였으며 73% 이상의 개질 효율을 나타내었다. 개발된 천연가스 수증기 개질기는 향후 수소 정제용 PSA(Pressure Swing Adsorption) 시스템과 연계하여 수소충전소 국산화 엔지니어링 설계 패키지 개발의 핵심 기 술로 사용할 계획이다.시간 정도 운전한 후 시스템을 정지하였다 메탄 전환율과 일산화 탄소 농도, 열효율을 모니터링 하고 있으며, 현재까지 초기 성능을 그대로 유지하고 있다. 앞으로 일일시동-정지 운전 시험을 지속하면서 초기 시동 특성 및 부하 변동에 따른 응답 특성 개선, 그리고 연료전지와의 연계 운전을 실시할 예정이다 한다. 단위 전지 운전 온도 $130^{\circ}C$, 상대습도 37%의 운전 조건에서도 상당히 우수한 전지 성능을 보임에 따라 고온/저가습 조건에서 상용 Nafion 112 막보다 우수한 막 특성을 나타냄을 확인하였다.소/배후방사능비는 각각 $2.18{\pm}0.03,\;2.56{\pm}0.11,\;3.08{\pm}0.18,\;3.77{\pm}0.17,\;4.70{\pm}0.45$ 그리고 $5.59{\pm}0.40$이었고, $^{67}Ga$-citrate의 경우 2시간, 24시간, 48시간에 $3.06{\pm}0.84,\;4.12{\pm}0.54\;4.55{\pm}0.74 $이었다. 결론 : Transferrin에 $^{99m}Tc$을 이용한 방사성표지가 성공적으로 이루어졌고, $^{99m}Tc$-transferrin의 표지효율은 8시간까지 95% 이상의 안정된 방사성표지효율을 보였다. $^{99m}Tc$-transferrin을 이용한 감염영상을 성공적으로 얻을 수 있었으며, $^{67}Ga$-citrate 영상과 비교하여 더 빠른 시간 안에 우수한 영상을 얻을 수 있었다. 그러므로 $^{

  • PDF

Analysis of Thermal Environment Impact by Layout Type of Apartment Complexes for Carbon Neutrality Net-Zero: Based on CFD Simulation (공동주택단지 배치유형별 열환경 영향성 분석: 유체역학 시뮬레이션을 기반으로)

  • Gunwon Lee;Youngtae Cho
    • Land and Housing Review
    • /
    • v.14 no.3
    • /
    • pp.93-106
    • /
    • 2023
  • This study attempted to simulate changes in the thermal environment according to the type of apartment complex in Korea using CFD techniques and evaluate the thermal environment by type of apartment. First, apartment complex types in the 2000s and 2010s were referred from previous studies and four types of apartment complex were extracted from. Second, the layout of the apartment complex and temperature changes were analyzed by the direction of wind inflow. Third, a standardized model was created from each type using tower type, plate type, and mixed driving. Last, CFD simulations were performed by setting up the inflow of wind from a total of eight directions. The temperature was relatively low in the type consisting of only the tower type and the type of placing the tower type in the center of the complex, regardless of the direction of the wind. It was due to the good inflow of wind from these types to the inside of the complex. It can be interpreted because wind flows easily into the complex in these types. The findings showed that wind flow and resulting temperature distribution patterns differed depending on the building type and complex layout type, confirming the need for careful consideration of the complex layout in the early design stage. The results are expected to be used as basic data for creating a sustainable residential environment in the early design stage of apartment complexes in the future.

An Empirical Analysis on the Presumption of Public Apartment's Construction Cost in Housing Land Development Project (택지개발사업의 공공주택건설공사비 추정의 실증적 분석)

  • Kim, Seong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.81-88
    • /
    • 2011
  • Providers haven't recently had a flexible construction cost estimation system to meet various needs of consumers about public housing. So the subject of this study is to estimate construction cost reasonably in early project stage of public housing and then develop reliable means which is able to support construction cost management and establish a adequate funding investment plan as a provider. In this study, Regression analysis was performed by the case on 20 public apartment complex which were designed from the first half of 2007 to the first half of 2008. A total construction cost of construction, civil engineering, machinery, elevator, land scape, electricity and communication work was used as one sample for increasing explanation and representativeness of the case. In addition, The total construction cost which is devided into design, contract and completion cost was variously analysed for increasing relevance of model and actual utilization. The result of estimation model based on a total construction cost set up completion and design cost showed that error rate is within 2%, which is a excellent result. The estimation model of the construction cost developed by this study is expected to estimate approximate construction cost which is adjacent real construction cost in early stage of the project by using some data.