• Title/Summary/Keyword: 건설 프로세스

Search Result 710, Processing Time 0.025 seconds

An Improvement Scheme of Process Quality in The Korean Building Projects (건축프로젝트에 있어서 프로세스 질 관리의 개선에 관한연구)

  • Lee, Ho
    • Journal of Korean Association for Spatial Structures
    • /
    • v.6 no.3 s.21
    • /
    • pp.51-57
    • /
    • 2006
  • The object of this study is to examine the managerial characteristics of the Korean building projects. The study in this paperproposes to investigate the factors that affect process quality not only in the construction phase but also in all three phases (design, construction, and operation) of the whole life cycle of a building project. A questionnaire survey is conducted to investigate the differences in the perceptions of graduate students, professors, designers and practitioners with regard to process quality in building projects. Analyzing these factors helps in revising and improving the Korean existing quality control system and programs. The findings indicate that cooperation of designer's professionals, level of management leadership in promoting quality, ability to operate the facility within design limits are important factors. Theparticipation percentage of "quality" treated in any course/seminar shows only 45%. It is recommended that college programs include courses that treat the administrative aspects involved in the building project and that continuing education programs rover quality training.

  • PDF

A Study of the evaluating and improving methods on PMIS for performing strategy of construction company. (전략수행을 위한 PMIS 진단 및 개선방안)

  • Lim, Hyoung-Chul
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.83-89
    • /
    • 2007
  • This study started with many experiences about maturity evaluation and efficiency improvement of Project Management information system, and need for IT systems for performing of strategy. The objective of this study is 1)to evaluate processes and IT systems based on CSF in strategy perform phase, 2)to propose method of sustainable evaluation and improvement, and 3)with KPI and CSF, to evaluate and improve PMIS. Moreover, we suggested IT architecture framework for basement of improving process and resources.

  • PDF

A Basic Study on the Development of the BIM Service Level Assessment Process (BIM 서비스 수준 평가 프로세스 개발을 위한 기초연구)

  • An, Ji-Won;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.1
    • /
    • pp.87-93
    • /
    • 2019
  • In recent years, BIM services have been used in many construction projects. However, they are raising the question that there are many differences between what was initially proposed and what was actually done. In the IT sector, a method called as SLA is used to perform an assessment of the services delivered to the IT service project. In this respect, this study intends to introduce this method into building construction projects to use BIM in order to propose evaluation criteria and the evaluation process for SLA-based BIM service. The BIM service assessment process and criteria presented are judged to help introduce consistent and systematic BIM services in construction projects.

Cost Management System for Mechanical, Electrical, and Plumbing(MEP) Coordination Using Building Information Modeling(BIM) - A Case Study (BIM 기반 MEP 설계 조율 프로세스 분석을 통한 비용 관리 시스템 개발 사례 연구)

  • Won, Jongsung;Ham, Sungil;Jang, Sejun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.2
    • /
    • pp.195-205
    • /
    • 2022
  • This paper aims to propose a cost-based mechanical, electrical, and plumbing(MEP) coordination process using building information modeling(BIM). The proposed process can help project participants eliminate identified clashes between the MEP elements, analyze trends relating to MEP costs during the coordination process, and share their findings. MEP quantity-related information extracted through BIM was integrated with the cost database and schedule information. To check the applicability of the proposed process, it was applied to a construction project in South Korea. Through the application of the proposed process, MEP-related cost was reduced.

Design of Information Model for an Integrated Management System of Civil Projects (토목 프로젝트 통합 관리 시스템 구축을 위한 정보 모델 설계)

  • Jeong, Seon-Hwa;Kang, Hyoung-Seok;Noh, Sang-Do;Lee, Chang-Woo;Lee, Kwang-Myong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.365-368
    • /
    • 2010
  • 건설 프로젝트 단계별로 생산되는 다양하고 방대한 정보에 대한 효율적인 관리와 정보의 상호 교환 및 공유는 건설 산업의 생산성을 좌우하는 중요한 요소이다. 최근 건설 정보 통합에 대한 관심이 높아짐에 따라, 기획, 설계, 시공, 유지보수 등의 프로세스 및 엔지니어링 어플리케이션 간의 정보 통합에 대한 연구가 수행되고 있다. 하지만 BIM(Building Information Model)과 같은 정보 모델을 활용하여 정보를 통합 관리하는 것에 대한 연구는 상대적으로 건축 분야에 집중적으로 이루어지고 있다. 따라서 토목 분야에서 프로젝트 정보의 통합적인 관리와 업무 프로세스 별 엔지니어링 어플리케이션 간의 교환 및 공유를 위한 통합관리 시스템이 필요하다. 본 연구에서는 토목 프로젝트 통합 관리 시스템 구축을 위하여 토목 프로젝트 정보를 담을 수 있는 정보 모델을 설계하고, 토목 구조물 가운데 교량을 대상으로 하는 토목 프로젝트를 정보 모델에 적용해 보았다.

  • PDF

Derivation of the Construction Process for Precast Concrete System based on Off-Site Construction (OSC(Off-Site Construction)기반 PC공법의 시공 프로세스 도출)

  • Jun, Young-Hun;Bae, Byung-Yun;Yun, Won-Gun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.289-290
    • /
    • 2021
  • The PC system has advantages in terms of project management, such as shortening the construction period and reducing costs. However, it is difficult to activate the technology due to insufficient application of the technology. Therefore, there is a need for a strategy to expand and activate the PC system. This study is a basic research for PC construction project management, and its purpose is to derive the entire construction process from factory production of PC components to on-site construction. In this study, the construction process of the PC system was derived through literature review, and the main matters for the construction process management of PC system were confirmed in the analysis process. In the future, the results of this study are expected to be used as basic data for research for PC project management, such as deriving construction classification and calculating construction periods.

  • PDF

Understanding Collaborative Working Processes within Construction Project Teams Using Agent-Based Modeling and Simulation (에이전트기반 시뮬레이션을 활용한 건설프로젝트 조직 내 협업과정의 이해)

  • Son, JeongWook;Shin, Seung-Woo;Yi, June-Seong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.70-77
    • /
    • 2014
  • Collaborative processes among team members including communication, coordination, and information-handling processes either during pre-construction or project execution are required in order to accomplish the objectives of construction projects. However, current construction management practice does not explicitly take the effect of organizational aspects on project performance into account. This paper introduces a method to understand collaborative processes in an explicit and systematic fashion. An agent-based simulation of collaborative working processes within construction project teams was designed from game theory perspective and implemented. The simulation produced both individual behavior and network dynamics. Individuals represented as agents made efforts to improve performance by communication and coordinating with other members, and overall team network was emerged as a result of interactions among members. Interestingly, it was found that the tendency of forming cohesive subgroups increased when sustaining relations with between-group partners incurs higher cost. The primary contribution of this paper is that it presented an explicit approach to examining collaborative working processes in construction project teams and it extended existing computational organization and network studies by integrating individual behavior models and network models.

An Integrated Cost and Schedule Control Process Model Using Earned Value Management System (EVMS를 활용한 공정-공사비 통합관리 프로세스모델)

  • Baek Seung-ho;Kim kyung-rai;Lee Yu-Seb;Lee yong-gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.89-97
    • /
    • 2000
  • This research has been Initiated to provide an effective management tool for budget control of the public projects using EVMS. Barriers to implementing the tool for the domestic public projects are identified : no PMB (Performance Measurement Baseline) for budget control, management by BOQ(bill of quantity), no systematic planning and control. To eliminate these barriers, an integrated cost and schedule management process model using EVMS is proposed. This model is composed of six sub processes : organizing, scheduling, budget allocating, establishing PMB, managerial analysis, change incorporation.

  • PDF

Process Model for Construction Project Life-cycle Management System (CPLM 구축을 위한 프로세스 모델 구축)

  • Song, Jae-Hong;Yoon, Su-Won;Shin, Tae-Hong;Chin, Sang-Yoon;Choi, Cheol-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.277-282
    • /
    • 2007
  • Construction process works in sequence order and there are many different software for managing project and activity. So, there are many limitations such as in the stage of activity data loss can occur, in each stage concurrent cannot operate in construction industry. In order to solve these problem, agents have to cooperate each other and they need to share of data. Therefore, the purpose of this paper is to develop a process model and the process model will be use in the future to make Construction Project Life-Cycle Management based on concept of PLM(Product Life cycle Management) in the manufacturing industry, CE(Concurrent Engineering) and BlM(Building Information Modeling)

  • PDF

Construction Process based Schedule Risk Management System (공사프로세스기반 공정리스크 관리지원 시스템)

  • Yoon, You-Sang;Suh, Sang-Wook;Park, Moon-Seo;Jang, Myung-Houn
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.101-110
    • /
    • 2008
  • In order to achieve the best performance of a project, uncertainties involved in the building construction process need to be identified in the planning phase of the project. Risk management plays a significant role in construction to minimize risk occurred due to uncertainties of a project. Although the importance of the risk management has been known to the construction industry, a more effective system should be developed to meet the demands of the industry. The purpose of this study is to develop the effective risk management system for scheduling the construction processes. The study provides a tool that can optimize the management system which would assist managers to identify schedule risks in the planning phase of the project.