• Title/Summary/Keyword: 건설프로그램

Search Result 726, Processing Time 0.031 seconds

Multi-dimensional Quality Model for Value Engineering in Planning Phase of Public Construction Program (공공 건설 프로그램의 기획단계 VE를 위한 다차원 품질모델)

  • Hyun, Chang-Taek;Kim, Jong-Hyeob;Son, Myung-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.61-69
    • /
    • 2013
  • In the mixed-use development program, several conflicts occur due to the characteristics of construction program, such as large-scale, variety of stakeholders, long periods of time, etc. In particular, since the characteristics of the construction program having various complex projects lead to different requirements depending on stakeholders, it is crucial to plan the appropriate type and size of facilities. Therefore, it is necessary to derive solutions suitable for the needs of owner by conducting VE in the planning phase. In this study, a multi-dimensional quality model is developed to present proper facilities necessary for the construction program by clearly identifying the owner's requirements in performing VE in the planning phase. Through the development of the multi-dimensional quality model, the characteristics distribution of 15 major facilities by 12 performance indicators for mixed-use development programs is presented. The deduction method of appropriate facilities based on the requirements of owner and the multi-dimensional synthesis method among the performance indicators are also suggested. This study is significant as a basic research for the application of VE in the planning phase of construction program. It is expected that the multi-dimensional quality model proposed in this study could facilitate presentation and review of appropriate facilities based on the analysis of requirements of various stakeholders in the early stage of the construction program.

A Development of 3D Computer-Aided Design(CAD) Add-on Program for a Quantity Take-off through the User Needs Analysis (사용자 요구 사항 분석에 따른 물량산출 연동 프로그램 개발)

  • Kim, Seong-Ah;Lee, Jea-Jun;Shin, Tea-Hong;Chin, Sang-Yoon;Kim, Yea-Sang;Choi, Cheol-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.297-300
    • /
    • 2008
  • Since the Three Dimensional Computer Aided Design(3D CAD) appeared in 1990s, Building Information Modeling(BIM) has got the great issue in the construction project nowadays. BIM is the process of managing and generating building information during life cycle of a construction project. And information can be moved to 3D modeling flexibly in BIM. As a result, a field of estimating has also been doing researches in the calculation of the amount of building materials from 3D modeling. And the Construction Cost Estimating Software which is generally used over the world has been trying to be applied to the Construction project in Korea. But, when we consider the productivity, it is less efficient than the existing way in Korea which use the 2D Drawings when they take off the Quantity. Also, there are lots of difference how to estimate the construction cost. between Korea and the others. Because it is a bit hard to apply the software used in the other countries to the construction project in Korea, people couldn't use it well in the construction project actually. In this study, for developing the appropriate construction cost estimating software rooted in 3D in Korea, we suggest 3D CAD Add-on Program for a Quantity Take-off which can move quantitative information to 3D CAD.

  • PDF

Development of Wireless Communication System and Application Program for Realtime Schedule Management at Construction Site (건설현장 실시간 공정관리를 위한 무선통신시스템 구축 및 응용프로그램 개발)

  • 진교홍;이혜원;김지홍
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.8 no.1
    • /
    • pp.192-199
    • /
    • 2004
  • As the construction site becomes larger, more complex and more special, the information of construction is expanded in quantity and specialized in quality. Therefore the computing system is necessary to effectively manage the construction schedule management. At present, main office at construction site bring in the computing system to perform the schedule management, so the data input and access for schedule management is performed by engineer on foot between construction site and main office. Therefore in this paper, we arrange wireless communication system between construction site and main of office and develop application program for data input and access of schedule management immediately using PDA at construction site. Through the our system we can improve the schedule management at construction site, and we can look forward to reduction of manpower, equipments, time, and money in whole construction.

Improvement of Global Construction Engineer Training Program : An Importance-Satisfaction Analysis (글로벌 건설 엔지니어링 고급인력 양성사업의 교육프로그램 개선방안)

  • Park, Hyeon;Park, In-Seok;Cha, Yongwoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.6
    • /
    • pp.31-39
    • /
    • 2016
  • This study aims to give suggestions based on survey to improve the quality of Global Construction Engineer Training Program in line with the government goals. The domestic construction industry in Korea has kept shrinking, whereas the global construction market is forecasted to keep expanding in the future. It has become an urgent task to be taken up for construction contractors and engineering firms so as to improve their capacity, in particular, in the fields of planning, management, finance as well as engineering. To deal with the lack of capacity of the domestic engineers and to help them emerge as global players in the competitive overseas construction market, the Ministry of Land, Infrastructure and Transport of the Korean government has designed a program called 'Global Construction Engineer Training Program.' The eligible target of the training program is mid-career professionals who are working for the construction contractors or engineering firms. To draw suggestions for this program, an importance-satisfaction analysis is conducted to evaluate the effectiveness of the training program implemented by the S University. The S University, along with C University, was selected as an implementation organization of the program in 2014 by the government. Through an email survey, the participating students in the program were asked questions on the importance and satisfaction against 17 indicators classified into 5 categories: instruction method, professional knowledge of instructors, contents of program, curriculum, and facility and environment. The survey results show that students are satisfied with the overall quality of the program, but it was also found that they want the program opens more coursework on practical application of knowledge, case studies, and global networking.

Development of a Scheduling Assistant Program for Usability Improvement of Construction Scheduling Solutions (건설 공정관리 솔루션의 활용성 증대를 위한 공정표 작성 지원 프로그램 개발)

  • Park, Sung Hwan;Lee, Si Wook;Woo, Sungkwon;Shin, Do Hyoung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.4D
    • /
    • pp.413-421
    • /
    • 2010
  • Scheduling management is one of the most important factors for the efficient performance of construction projects. Various computer-aided solutions for schedule management have been developed, but they are not commonly used in practice. This study conducted surveys on scheduling management methods and the related solutions to identify their status and problems in practice. Based on the results of the surveys, this study also developed a scheduling assistant program to improve the usability of scheduling management solutions. Through the developed program, the usability of scheduling management solutions will be improved in practice, thus enabling efficient scheduling management.

Construction Progress Measurement System by tracking the Work-done Performance (내역물량 측정에 의한 건설공사진도율 산정시스템)

  • Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.137-145
    • /
    • 2003
  • The project control system based on the actual values of three objects shall be operated continuously in a timely manner. For collecting/tracking accurate actual performance data, a reasonable basis of measuring work performance and its related measuring methods are needed. Therefore, this research proposes a method of developing and operating the construction progress measurement system. The problem of the conventional method is the difficulty to construct control accounts and to define the basis of measuring the performance of each control account. Therefore, this research proposes the preferable, formal methodology that produces the progress value of the smallest work unit by surveying the installed quantities and estimates percent complete of groups of works or entire project by earned value concept. This research in connection with the hereafter research of the weight value of control accounts will contribute to apply in practice and to develop the scientific construction management technique in the construction industry. Further researches how to trend and forecast the project using the measured progress value are recommended for putting the prosed system of this research to practical use.

Operating Strategies for Education and Training Programs for Nurturing North Korean Construction Workers (북한 건설기능인력 양성을 위한 교육·훈련 프로그램 운영 전략)

  • Jung, In-Su;Lee, Giu;Park, Hyeong-Geun;Lee, Young-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.9
    • /
    • pp.262-269
    • /
    • 2019
  • This study was conducted to pave the way for the development and operation of education and training programs to nurture skilled North Korean construction workers. Such programs would help to meet the expanded demand for setting up infrastructure, which is the backbone of the two Koreas' economic cooperation and mutual development. To achieve this initiative, the targets and scopes of education and training were determined by classifying business types for education and training purposes by construction sector. Furthermore, each education and training course and their allocated time frames were analyzed. Issues related to inter-Korean economic cooperation in the border area were also analyzed to determine regional characteristics. Education and training programs were thus classified into three types of infrastructure units: society, industry, and life infrastructure units. Social infrastructure units are the common demand of the whole border area, including construction of roads, railways, and harbors, as well as inspection and maintenance. Industrial infrastructure units are programs for industrial facilities centering on the designated special economic zone in the western part of the border area. Life infrastructure units are programs for infrastructure facilities such as large, complex facilities and residential facilities for the eastern tourist belt side.

The Improvement of Point Cloud Data Processing Program For Efficient Earthwork BIM Design (토공 BIM 설계 효율화를 위한 포인트 클라우드 데이터 처리 프로그램 개선에 관한 연구)

  • Kim, Heeyeon;Kim, Jeonghwan;Seo, Jongwon;Shim, Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.5
    • /
    • pp.55-63
    • /
    • 2020
  • Earthwork automation has emerged as a promising technology in the construction industry, and the application of earthwork automation technology is starting from the acquisition and processing of point cloud data of the site. Point cloud data has more than a million data due to vast extent of the construction site, and the processing time of the original point cloud data is critical because it takes tens or hundreds of hours to generate a Digital Terrain Model (DTM), and enhancement of the processing time can largely impact on the efficiency of the modeling. Currently, a benchmark program (BP) is actively used for the purpose of both point cloud data processing and BIM design as an integrated program in Korea, however, there are some aspects to be modified and refined. This study modified the BP, and developed an updated program by adopting a compile-based development environment, newly designed UI/UX, and OpenGL while maintaining existing PCD processing functions, and expended compatibility of the PCD file formats. We conducted a comparative test in terms of loading speed with different number of point cloud data, and the results showed that 92 to 99% performance increase was found in the developed program. This program can be used as a foundation for the development of a program that reduces the gap between design and construction by integrating PCD and earthwork BIM functions in the future.

Algorithm for Simulation Program to Revitalization Site-Recycling (건설폐기물 재활용 활성화를 위한 시뮬레이션 프로그램 알고리즘 개발)

  • An, Yang-Jin;Lee, Jae-Sung;Lee, Kyoung-Hee;Bae, Kee-Sun;Jung, Jong-Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.712-715
    • /
    • 2008
  • The construction wastes rapidly increase because of redevelopment, the development of new urbanization of large-scale land development, the expansion of social infrastructure. As one of the ways to recycle construction waste to be recycled directly. This case, recycling of materials uses up most of recycled aggregate can be secured reliably. As a result, a decrease in the amount of materials brought in or taken out of the site, the cost of transportation, carbon dioxide emission, and traffic can be reduced. Economic, social and environmental effects can be expected. Therefore, this study of the construction waste "Site-Recycling" to enable the construction waste from the occurrence of "site-recycling" that can be processed in batches to apply the "Site-Recycling Simulation Program" is to develop the algorithms.

  • PDF