  • The remaining Joongjaesil(中齋室)-type pavilions in the eastern part of the Jirisan Mountain area showed more complex characteristics than those in the western part. The front number of kan(間) had two, three, and four kan (間) types, but the number of kan on the side was consistent with two regardless of the number of kan on the front. The pavillion is classified into 'central type', 'towards the backward type', and 'expanded by backwards type' according to the location of Joongjaesil. Joongjaesil's size, which characterizes the characteristics of Joongjaesil-type Pavilion, is related to the building's front number of kan. Front number of kan. When this space was increased by one space to four spaces, Joongjaesil must have two spaces. The pavilion with four bays in front showed the characteristics of being concentrated in Sancheong and Jinju, the eastern part of the Jirisan Mountain area. In the eastern region, many high pavilions remain, and the upper structure of the pavilion was insignificant, but the flat shape and public construction showed strong locality.

Studies on Post Contract Schedule Analysis (준공현장의 분쟁해결방안으로서의 사후적 공정분석에 관한 연구)

  • KIHYUK, KO;SUNGPIL, PARK;YONGKIL, KIM
    • Journal of Arbitration Studies
    • /
    • v.32 no.4
    • /
    • pp.103-141
    • /
    • 2022
  • Traditionally, schedule analysis in Korea has been used, mainly through the Critical Path Method, to evaluate the claim for extension of time and/or the amount of liquidated damages for delay. Critical path method, however, cannot identify the delay event and its impact occurred in non-critical path especially in multi facility projects. In multi facility projects that comprise several independent but related facilities or structures, each facility has its own facility critical path the duration of which will be impacted by facility specific critical delays. Thus, only through the non-critical delay analysis along with the critical delay analysis damages not attributable to contractors may be remedied in full. Because all the records and pictures can reveal what has actually happened in post contract review, only the retrospective analysis rather than the prospective analysis based on the assumptions can establish the cause and allocate the each parties' responsibilities appropriately.

Archaeological Heritage Management and the Nam River Dam Project (국제적 관점에서 조망한 한국 문화재 관리에 대한 일고찰 - 남강댐수몰지구 유적지 조사를 중심으로 -)

  • Bale Martin T.
    • KOMUNHWA
    • /
    • no.58
    • /
    • pp.137-152
    • /
    • 2001
  • In this paper I examine archaeological heritage management in South Korea as seen through the 32 year Nam River Dam project. Excavations resulting from this project revealed important archaeological remains spanning a 22,000-year period. Yet much of this

  • PDF

A Suggestion of Claims Preparation Procedure in the Public Sector (공공건설사업에서 업무단계별 클레임준비 절차)

  • Cho Young-Jun;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.54-62
    • /
    • 2001
  • Although claims and disputes may be never avoided in construction industry, until 1998, there are no systematic claims in the public sector in Korea. But, because of IMF, Contractors have been recognized that cost management is essential factor and contractual right can be demanded against the Public Orderer. Many affirmative effect such as, appearance of new professional service, prevention of lower quality construction, restrain of unnecessary budget expenditure, arrangement of duplicated or triplicated liability and revision of unnecessary administrative control may be anticipated through alleging claims, but in site representative manager and construction company may have ambiguous fear, somebody tried to allege claims. Therefore, to activate systematic construction claims, 32 public construction project claims alleged by contractors from 1998 to 2001 were analyzed, inactivated reasons of claims were examined and contractor's action plan to allege claims was suggested in this paper.

  • PDF

A Study of the Introduction and Application of Partnering to the Alternative Dispute Resolution(ADR) (재판 외 분쟁해결제도로서의 파트너링 도입에 관한 연구)

  • Lee Tai Sik;Jeong Hyun Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.329-332
    • /
    • 2001
  • Alternative dispute resolution(ADR) techniques, like negotiation, arbitration, meditation, have been used to resolve dispute in Korea construction industry with litigation. Nowadays, in construction, there are growing numbers of disputing cases, because of the different viewpoint of the owner and the constructor, great demand of opening market, and bad construction business situation. As the name implies, ADR plays an important roles after disputes have already arisen. This paper suggests the one of the solutions that prevents disputes befor they have been occurred. There are some proves that the partnering has a substantial effect on reducing disputes and time reduction and improving communication among the parties. This paper proposes the partnering model for the one of preventive methods to solve disputes.

  • PDF

A Study of the New Approaches to the Disputes Resolution Processes in Construction Projects (건설공사 분규해결 절차의 새로운 정립에 관한 고찰)

  • Shin Kyoo-Chul
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.40-45
    • /
    • 2001
  • Arbitration is adopted recently as dispute resolution vehicle for major construction projects in Korea. These arbitration cases show that complex construction disputes are resolved reasonably by newly-introduced arbitration process and this trend will continue. This paper reviews the expanded concept of dispute resolution for the new approaches to the disputes resolution processes in construction projects. The expanded concept includes that disputes need to be assessed reactively and proactively in construction project and need to be managed effectively in advance. In this paper, dispute resolution methods used in Korea are reviewed and analyzed against ADR methods available in US construction industry The new approaches to the dispute resolution Processes are based on the concept of 'Disputability' which means dispute management through prevention, avoidance and predictability of dispute issues and characteristics.

  • PDF

A Study on the Validity of the Selective Arbitration Clause on Construction Arbitration (건설중재에 있어서 선택적중재합의의 유효성에 관한 연구)

  • Suh, Jeong-Il
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.25
    • /
    • pp.165-187
    • /
    • 2005
  • Arbitration is a creature of contract. The parties agree that selective dispute resolution clause provides them with a choice to litigate or arbitrate certain disputes. Under the agreements, the parties had the option in the action. In the event any dispute arises between the parties concerning our representation or payment of our fees and disbursements which cannot be promptly resolved to our mutual satisfaction, you agree that dispute will be submitted to arbitration. Arbitration is a matter of contract and a party cannot be required to submit to arbitration any dispute which he has not agreed so to submit. The selective arbitration agreement has become an accepted method of dispute resolution. However, the trend of dispute settlement has changed. The selective arbitrations clauses are to be construed as broadly as possible, and arbitration will be compelled unless it may be said with positive assurance that arbitration clause is not susceptible of an interpretation that covers the asserted dispute.

  • PDF

A Study on the Validity of the Selective Arbitration Clause on Construction Arbitration on Construction Arbitration (건설중재에 있어서 선택적중재합의의 유효성에 관한 연구)

  • Suh, Jeong-Il
    • 한국무역상무학회:학술대회논문집
    • /
    • 2004.12a
    • /
    • pp.149-170
    • /
    • 2004
  • Arbitration is a creature of contract. The parties agree that selective dispute resolution clause provides them with a choice to litigate or arbitrate certain disputes. Under the agreements, the parties had the option in the action. In the event any dispute arises between the parties concerning our representation or payment of our fees and disbursements which cannot be promptly resolved to our mutual satisfaction, you agree that dispute will be submitted to arbitration. Arbitration is a matter of contract and a party cannot be required to submit to arbitration any dispute which he has not agreed so to submit. The selective arbitrations clauses are to be construed as broadly as possible, and arbitration will be compelled unless it may be said with positive assurance that arbitration clause is not susceptible of an interpretation that covers the asserted dispute.

  • PDF

A Study on Differentiation and Improvement in Arbitration Systems in Construction Disputes (건설분쟁 중재제도의 차별화 및 개선방안에 관한 연구)

  • Lee, Sun-Jae
    • Journal of Arbitration Studies
    • /
    • v.29 no.2
    • /
    • pp.239-282
    • /
    • 2019
  • The importance of ADR(Alternative Dispute Resolution), which has the advantage of expertise, speed and neutrality due to the increase of arbitration cases due to domestic and foreign construction disputes, has emerged. Therefore, in order for the nation's arbitration system and the arbitration Organization to jump into the ranks of advanced international mediators, it is necessary to research the characteristics and advantages of these arbitration Organization through a study of prior domestic and foreign research and operation of international arbitration Organization. As a problem, First, education for the efficient promotion of arbitrators (compulsory education, maintenance education, specialized education, seminars, etc.). second, The effectiveness of arbitration in resolving construction disputes (hearing methods, composition of the tribunal, and speed). third, The issue of flexibility and diversity of arbitration solutions (the real problem of methodologies such as mediation and arbitration) needs to be drawn on the Arbitration laws and practical problems, such as laws, rules and guidelines. Therefore, Identify the problems presented in the preceding literature and diagnosis of the defects and problems of the KCAB by drawing features and benefits from the arbitration system operated by the international arbitration Institution. As an improvement, the results of an empirical analysis are derived for "arbitrator" simultaneously through a recognition survey. As a method of improvement, First, as an optimal combination of arbitration hearing and judgment in the settlement of construction disputes,(to improve speed). (1) A plan to improve the composition of the audit department according to the complexity, specificity, and magnification of the arbitration cases - (1)Methods to cope with the increased role of the non-lawyer(Specialist, technical expert). (2)Securing technical mediators for each specialized expert according to the large and special corporation arbitration cases. (2) Improving the method of writing by area of the arbitration guidelines, second, Introduction of the intensive hearing system for psychological efficiency and the institutional improvement plan (1) Problems of optimizing the arbitration decision hearing procedure and resolution of arbitration, and (2) Problems of the management of technical arbitrators of arbitration tribunals. (1)A plan to expand hearing work of technical arbitrator(Review on the introduction of the Assistant System as a member of the arbitration tribunals). (2)Improved use of alternative appraisers by tribunals(cost analysis and utilization of the specialized institution for calculating construction costs), Direct management of technical arbitrators : A Study on the Improvement of the Assessment Reliability of the Appraisal and the Appraisal Period. third, Improvement of expert committee system and new method, (1) Creating a non-executive technical committee : Special technology affairs, etc.(Major, supports pre-qualification of special events and coordinating work between parties). (2) Expanding the standing committee.(Added expert technicians : important, special, large affairs / pre-consultations, pre-coordination and mediation-arbitration). This has been shown to be an improvement. In addition, institutional differentiation to enhance the flexibility and diversity of arbitration. In addition, as an institutional differentiation to enhance the flexibility and diversity of arbitration, First, The options for "Med-Arb", "Arb-Med" and "Arb-Med-Arb" are selected. second, By revising the Agreement Act [Article 28, 2 (Agreement on Dispute Resolution)], which is to be amended by the National Parties, the revision of the arbitration settlement clause under the Act, to expand the method to resolve arbitration. third, 2017.6.28. Measures to strengthen the status role and activities of expert technical arbitrators under enforcement, such as the Act on Promotion of Interestments Industry and the Information of Enforcement Decree. Fourth, a measure to increase the role of expert technical Arbitrators by enacting laws on the promotion of the arbitration industry is needed. Especially, the establishment of the Act on Promotion of Intermediation Industry should be established as an international arbitration agency for the arbitration system. Therefore, it proposes a study of improvement and differentiation measures in the details and a policy, legal and institutional improvement and legislation.

Dispute Settlement in Construction Contracts Under FIDIC (FIDIC에 의한 건설계약 분쟁 해결방안에 관한 연구)

  • Kim, Seong-Chirl;Jung, Byeong-Hwa
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.4
    • /
    • pp.21-29
    • /
    • 2010
  • International construction contractors are often faced with the situation of working in an unfamiliar construction environment. Under FIDIC rules, the contractor has the right to make a claim requesting the consulting engineer for an adjustment to the contract price or the time for completion when a part or parts of the works have changed, or in the event of unforeseeable conditions. Contractors generally have more access to the costs and time implications of such a change or unforeseeable conditions than the consulting engineer or outside neutrals. Due to such an asymmetry of information, the contractor may be motivated to dispute frivolous claims of less merit, expecting erroneous judgments by the consulting engineer or the neutrals. In this paper, a claiming behavior model is presented by using game theory and experience data to study the manner in which frivolous claims develop into disputes. The model also analyzes the impacts of DAB/DRB upon the frivolous claims.