• Title/Summary/Keyword: 건설정보 분류체계

Search Result 171, Processing Time 0.039 seconds

A Design of Computerizing System for Record Management of ULJIN Nuclear Power Plant (울진원자력발전소(原子力發電所) 자료관리업무(資料管理業務) 전산화(電算化) 연구(硏究)(II))

  • Park, Yong-Boo
    • Journal of the Korean Society for information Management
    • /
    • v.4 no.2
    • /
    • pp.139-151
    • /
    • 1987
  • The Computerizing Record Management System(RMS) has been developed for ULJIN Nuclear Power Plant in Korean on the basis of the Manual System. By means of review and analysis of processing flow & project requirements, system, logies such as Receiving system, Logging system, Distribution system, Filing system, Indexing & Retrieval system and Output system of statistic and various reports, have been established for computerizing. Structure of Masterfile has been designed so as to include Bibliographic data, Transmittal data, Distribution data, Area, data, RMS data for operation of Plant. The RMS data have been designed for construction and operation of the plant by adding index parameters for operation such as System code, KEPCO No., Component link code and Retention period on the point of receiving. The RMS has turned out an easy access to cross-reference between RMS and Material Control System.

  • PDF

Safety Management Framework for Information Handover Effectiveness in the Construction Industry (건설 안전관리 개념적 틀 및 정보이양 효율성 분석)

  • JIN, Zhenhui;JUNG, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.4
    • /
    • pp.50-61
    • /
    • 2020
  • Safety management has been one of the most critical issues in the construction industry for a long time. Despite continuous efforts, it still shows a higher accident rate than other sectors. To reduce the accident rate, a lot of studies have been performed, mostly focused on contractors or construction phase. Although the initial stage of the construction project has the most significant impact on construction safety and decision-makers at the initial stage play an important role, the safety management system throughout the project entire life-cycle is still insufficient. In addition, although a great deal of information is generated in the construction project and the value is increasing, while it shows an inefficient aspect. This is believed to be due to insufficient information exchange and a lack of standards. In this context, this study aims to analyze the efficiency of information handover in construction safety. For this purpose, a safety management framework for systematically and efficiently managing and utilizing for construction safety information is referred to as 'safety business functions', 'project life-cycle', and 'industrial hierarchy'. The 'safety business functions' are classified into three levels. And then, in order to analyze the efficiency of safety information handover, 'importance of safety business function' and 'efficiency of safety information handover' were evaluated by interviewing with experts. This study can be used as reference data for implementing systematical and efficient safety management, and can also increase construction safety competency.

Development of BIM for a Maintenance System of Subway Infrastructures (지하철 구조물 유지관리 시스템을 위한 BIM 개발)

  • Shim, Chang-Su;Kim, Seong-Wook;Song, Hyun-Hye;Yun, Nu-Ri
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.6-12
    • /
    • 2011
  • BIM(Building Information Modeling) technologies are the most effective for the maintenance of infrastructures because they provide information sharing througout the life-cycle of structures and support close communication between different project stages. Systematic and well-organized data play a fundamental role for the effective maintenance of subway tunnel. In this paper, 3D information models for maintenance of BIM-based subway tunnel structures are developed. Standard classifications for the maintenance and construction information classification system were adopted. A classification system based on construction information classification system was built considering procedures of maintenance work. It provides optimization and standardization of the work flow for the maintenance of subway structures by applying information modeling processes instead of the current maintenance practices. It can effectively reduces the life cycle cost and time for the maintenance. The proposed system can be utilized for the maintenance history management to enhance current maintenance system.

A Study on the Automated Estimating System using BIM based Library (BIM 기반 토목 라이브러리를 통한 견적자동화시스템에 관한 연구)

  • Han, Jung-Hoon;Nam, Sang-Hyeok
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.12-18
    • /
    • 2011
  • The BIM techniques which manages information over the life cycle of construction project based on the 3-dimensional model are developing in the direction of integrated construction management including planning, design, analysis, estimation, 3D simulation and so on. The estimation model based on the BIM has different detail level and model information. In this study, the LOD of estimation model is catched for the bridge structures. The library classes are defined with construction information classification system, and the quantities of resources are calculated by class parameter using Microstation API. Finally, the automated estimation system using BIM based library is verified by the integrated model for adjustments of level of detail.

Knowledge Structure for Cost Estimates Based on Standardized Cost Database (원가산정을 위한 표준분류체계 활용한 지식체계 개발)

  • Im, Haekyung;Kang, Namhee;Choi, Jaehyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.235-236
    • /
    • 2016
  • The importance of construction management has been increasing due to the fact that complex construction projects blend several different industries depending on the traits of the construction. This research was conducted to search for a method to enhance efficiency in cost management of construction project and meet the need for reusability of accumulated construction information. The process of detailed estimation and methodology for using standard unit price information has been developed to strengthen the interoperability in cost information by utilizing a standard classification system. The concept of ontology is proposed as a method of connecting construction information based on a standard breakdown structure to increasing the connectivity of the cost information in the construction project. Therefore, construction information knowledge framework is developed in order to improve the efficiency of the detailed estimation work process.

  • PDF

BIM based Integration Method of Cost and Schedule Information (BIM기반 비용.일정 통합관리 방안에 관한 연구)

  • Baek, Young-In
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.695-699
    • /
    • 2009
  • 3D and BIM technology are presumed to be used more and more in the construction industry. The scope of this paper arose from a general wondering of how the constructor in general can benefit from the use of 3D models. Presented herewith is the first application of BIM in Korea to a actual bridge construction site located in Cheongpoong in Chooncheongbook-Do. This paper tries to integrate design, cost and schedule under location-based conditions with industry-specific solution for 3D modeling. 292 activities constitute the cable-stayed bridge of 442m long with a main span of 327m long. Integration of 3D model, cost and schedule is shown by comparing the measurements of works at a specific time by use of 2 different construction sequencing scenarios and cost breakdown structures.

  • PDF

A Research on how to turn informationization Database of construction materials to practical use (건설 자재정보 DataBase의 실용화 방안 연구)

  • Kwon, Oh-Yong;Han, Chung-Han;Lee, Hwa-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.747-750
    • /
    • 2007
  • Information of construction material is served through internet to user but it is poor to use information of construction material because of lack of information which is accumulated and insufficience of standardization. So informationization of civil materials are closely connected with works and then it is promoted to be used through works like design, construction etc. Informationization for management of information of construction material which reflects questionnaires about opinion of workers presents promotion by stage considering first, continuous renewal of information of construction material and increase in quantity, second classification system and standardization of terms in order to share and connect information of construction material third, developing inquiry method of material information needed in construction stage fourth, connecting material information DB and application through design and construction.

  • PDF

건설IT융합기술 : 스마트빌딩 기술 개발 사례

  • Baek, Yun-Cheol;Kim, Hyeong-Seok
    • Information and Communications Magazine
    • /
    • v.30 no.10
    • /
    • pp.25-31
    • /
    • 2013
  • 본고에서는 건설기술과 IT기술이 융합된 건설IT융합기술에서 스마트 빌딩과 관련하여 안전, 건강, 편의, 에너지를 위한 기술들로 분류하여 사례와 함께 서술한다. 고층 빌딩의 안전성을 위한 건축 구조물 건전도 모니터링 기술, 빌딩 실내 또는 지하 주차장에서 쾌적한 공기 환경을 유지하기 위한 스마트 환기제어 시스템 기술, 빌딩 정보의 체계적인 데이터 관리를 위한 빌딩정보모델링 기반의 센서와 영상 인터페이스, 스마트 빌딩 네트워크 관리 시스템에 관하여 소개한다. 또한, 에너지 절감을 위한 빌딩 에너지 관리 시스템에 관하여 냉난방, 조명, 환기설비, 전력모니터링 관련 기술에 대하여 설명한다. 이러한 기술들을 적용한 스마트 빌딩은 유무선통신, 스마트디바이스와 같은 IT기술을 건축공학 및 빌딩자동제어, 설비 기술에 적용하여 빌딩 사용자에게는 안전 및 최적 환경을 제공하고 빌딩 소유주나 관리자에게는 관리비용 절감, 관리 편의, 빌딩가치 상승 등을 제공할 수 있다.

A Study on the Necessity and Applicability of Interactive Electronic Technical Manual(IETM) for Construction Projects (건설분야 전자매뉴얼의 필요성 및 특성분석을 통한 실무적용성 연구)

  • Kang, Leen-Seok;Jung, Won-Myung;Kwak, Joong-Min
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.99-108
    • /
    • 2005
  • Interactive electronic technical manual(IETM) for construction projects means an electronic tool that regulations and specifications related to construction method or maintenance process ale described by electronic book type. It has a meaning of integrated information system that includes virtual reality(VR), 3D animation and image contents for representing real construction information so that user can easily understand the construction situation and maintenance process. The basic information and technical manuals of construction facilities are being written as paper documents in our construction industry. As the result, the information management in the maintenance phase of construction projects is inefficient, and maintenance cost is being increased. This study attempts to improve the lack of understanding about construction IETM through the analysis of necessity and unique function of construction IETM comparing with the IETMS in other industry, Finally, this study shows a scenario of construction IErM for mitigating natural disaster of construction facilities to verify applicability of IETM.

Analysis on the Factors Influencing Construction Productivity for Management of Construction Productivity Information (건설 생산성 정보 관리를 위한 생산성 영향요인 분석)

  • Moon, Woo-Kyoung;Han, Sung-Hun;Kim, Yea-Sang;Kim, Young-Suk;Kim, Sang-Bum
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.422-426
    • /
    • 2006
  • Productivity is one of the very important index that measures efficiency of production activities in industry, enterprises and the building industry as well. None the less, the concept of construction productivity is not so clear that productivity management in the building industry have been performed by experience or intuition, productivity related data have not been analyzed through effective productivity management, because structured definition and classification of factors influencing construction productivity did not exist so that it has not been known what information explain each of them. In order to solve this problem, at first construction productivity and factors influencing construction productivity are defined and classified into three groups; (1)Project factors influencing construction productivity (2)Management factors influencing construction productivity (3)Activity factors influencing construction productivity. To find out relation between construction productivity and factors influencing construction productivity, a questionnaire survey for construction managers in the building industry has been conducted.

  • PDF