• Title/Summary/Keyword: 건설실패

Search Result 97, Processing Time 0.021 seconds

Development of Collision Risk Evaluation Model Between Passing Vessel and Mokpo Harbour Bridge (통항 선박과 목포 대교의 충돌 위기 평가 모델 개발)

  • Yim, Jeong-Bin
    • Journal of Navigation and Port Research
    • /
    • v.34 no.6
    • /
    • pp.405-415
    • /
    • 2010
  • To assess the possible collision risk between Mokpo Harbour Bridge, which is under construction, and passing vessels, we proposed Real-Time Bridge-Vessel Collision Model (RT-BVCM) in this paper. The mathematical model of RT-BVCM consists of the causation probability by the vessel aberrancy due to navigation environments, the geometric probability by the structural feature of a bridge relative to a ship size and, the failure probability by the ship collision track and the stopping distance which is not to come to a stop before hitting the obstacles. Then, the probabilistic mathematical model represented as risk index with the risk level from 1 to 5. The merit of the proposed model to the collision model proposed by AASHTO (American Association of State Highway and Transportation Officials) is that it can provide enough time to take adequate collision avoiding action. Through the simulation tests to the two kinds of test ships, 3,000 GT and 10,000 GT, it is cleary found that the proposed model can be used as a collision evaluation model to the passing vessel and Mokpo Harbour Bridge.

A Study on the Regression Models of Success and Failure of Tenders for Plant and Construction Exports (플랜트 및 건설수출 입찰의 성공 및 실패모델에 관한 연구)

  • You, Kyou-Yeol
    • Journal of the military operations research society of Korea
    • /
    • v.29 no.1
    • /
    • pp.88-111
    • /
    • 2003
  • This paper is to suggest strategic options for improving the export performance of the plant and construction industry. The overall objective of this study is to explore the feasibility of a sustained export performance in the plant and overseas construction industry by an analysis of its international competitiveness and technological competence. The empirical work of this study relates to a chosen sample of Korean and non-Korean firms in the plant and construction industry sector. Primary data was collected through a comprehensive questionnaire survey administered to plant and construction firms in twelve countries, including Korea. The actual number of firms for which full information at a sufficient level of disaggregation was obtained was 62, a response rate of 44.6%. Of these, 42 firms were drawn from Korean plant and construction firms and the remaining 20 firms from 11 other countries. The structure of responding firms by industry shows a total of 29 plant exporters and 33 construction firms. Data analysis was carried out using SPSS statistical technique such as Multiple Regression in order to examine the linear relationship among variables. The findings of the study indicate that export success and failure in plant and construction export markets is determined by firm size and by various qualitative variables. The high export volume (export success) of Plant and construction exporters is more strongly influenced by mutual economic cooperation and number of employees than by sales volume and competent knowledge of the plant and construction markets. It was also found that weak political and diplomatic relation between countries, low sales volume and lack of bid experience have an adverse effect and represent serious barriers to exports.

Analysis of Risk Factors for the Importance in Vietnam's Public-Private Partnership Project Using SOM(Self-organizing map) (SOM(Self-organizing map)을 활용한 베트남 민관협력사업 리스크 요인 중요도 분석)

  • Yun, Geehyei;Kim, Seungho;Kim, Sangyong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.4
    • /
    • pp.347-355
    • /
    • 2020
  • The economic growth rate and the urban population of the Vietnam are steadily increasing. As a result, the size of the Vietnam's construction market for infrastructure development is expected to increase. However, Vietnam is adopting PPP(Public-Private Partnership) to solve this problem because the government lacks the financial and administrative capacity for infrastructure development. PPP is a business that lasts more than 10 years, so risk management is very important because it can be a long term damage in case of business failure. This study proposes a self-organization map (SOM) for analyzing the impact of risk factors and determining the priority of them. SOM is a visualization analysis method that analyzes the inherent correlation through the color pattern of each factor.

A Study on Application for Super Speed Maglev Railway of System Engineering Technology (시스템 엔지니어링 기법의 초고속 자기부상철도 적용에 관한 연구)

  • Han, Young-Jae;Jo, Jung-Min;Lee, Jin-Ho;Kim, Dong-Hyun;Lee, Chul-Ung
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.4
    • /
    • pp.317-324
    • /
    • 2015
  • A super speed maglev is a complicated system integrating electric, electronic, mechanic, civil and construction engineering. So, there must be an integrative system to monitor and manage operation requirements and standard features of each subsystem and the interfaces between each technology. As an indispensable part that can ensure whole system performance, a secure interface for each individual subsystem is an important management item of system engineering. By securing the interface performance of each individual subsystem, system failure can be effectively prevented in advance. Based on system engineering techniques, improvement of security and reliability for a super speed maglev is described in this research.

Development of Service Evaluation Criteria in Tramway Operation (트램 운영 서비스 평가 기준 개발)

  • Chung, Sung Bong;Kim, Dong Sun;Choi, Ji Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.4
    • /
    • pp.551-559
    • /
    • 2019
  • Since 2000, many local governments have been trying to introduce trams because of the government's failure to adopt environment-friendly policies and light rail. However, there is no service evaluation system that can maintain and enhance tram users' convenience, safety, and comfort during operation. In addition, the tram characteristics are not reflected in the application of the evaluation system of "management and service evaluation for public transportation operators" which is being implemented to railway operators or bus transportation operators. The purpose of this study is to develop the evaluation criteria of operating service according to tram operation model. First, we reviewed cases related to the evaluation of operating services in roads, buses, railways, and airways. And the evaluation criteria and the evaluation items are presented. This study is expected to help to secure and improve operational service in the operation phase of the tram that will be introduced in the future.

Indonesia 2017: Return of Pancasila on the Eve of the Presidential Election (인도네시아 2017: 빤짜실라의 귀환과 대선 국면의 도래)

  • SUH, Jiwon;KIM, Hyung-Jun
    • The Southeast Asian review
    • /
    • v.28 no.2
    • /
    • pp.147-179
    • /
    • 2018
  • Basuki Tjahaja Purnama, Jakarta's Ex-Governor, lost his re-election bid in 2017 and then was jailed on a charge of blasphemy. After his defeat, the rhetorics of Indonesian politics was divided into two opposing sides: anti-Communism and 'pribumi' of the radical Islamic movements and Pancasila of the Jokowi administration. Although Islamic political parties are now preoccupied with their own coalitional politics and survivals, rather than solidarity of Islamic forces, the rising Islamic sentiments confirmed by the Jakarta election indicate that religion will continue to be a key variable in Indonesian politics. Meanwhile, ex-military generals who declared themselves as candidates in the 2018 regional election and the 2019 presidential election, as well as a few measures used by the Jokowi administration against extra-parliamentary political opponents, remind us of Suharto's New Order. Steady growth continues in economy. The raise of minimum wage enlarged middle classes and led to a decline of the poverty rate. Jokowi's commitment to building infrastructure has made tangible achievements. Under these circumstances, enhanced cooperation between Indonesia and South Korea is laudable, though any such cooperation must fully incorporate local sociocultural contexts, such as the strengthened halal certification system.

An Exploratory Research on Quantitative Risk Assessment Methodology Throughout Success Factor Analysis in Project Financing (PF 개발사업의 성공요인 분석을 통한 리스크 평가체계 구축을 위한 기초연구)

  • Lee, Dong-Gun;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.92-102
    • /
    • 2013
  • A Project Financing (PF) is a form of project delivery system that is carried out for the purpose of trying to give help to the development of national economy and the construction industry in order attract private investment. However, in the case of Korea, many PF projects are only taking into account the aspect of maximizing development benefits, and the proliferation of PF results in project failure. In addition, the interruption of business has been one after another in the aftermath of the recent financial crisis. These major cause is the result of efforts to block the potential risk of objectively quantifying operations. Nowadays, PF risk analysis in terms of various factors is insufficient. The purpose of this study is to identify and quantify the extensive risk elements to classify the cause of affecting the success of the project PF study prior to propose a methodology for evaluating the integrity of the project PF based on this and to provide a quantitative system that can evaluate the business risk. This study identified the factors that affect the PF business success and failure and establish the metrics that can be quantified through existing research and expert interviews. Factors influencing the success of the PF obtained as a result of surveys and interviews in assessing the soundness of the PF development conditions in the future be able to take advantage of, as well as an objective assessment tool to be able to take advantage of the development is expected.

Effect of Office Building Remodeling Project Characteristics on the Occurrence of Schedule Delay Risk Factors (오피스 리모델링 프로젝트 특성에 따른 공기지연 리스크 발생 영향도)

  • Cho, Kyuman;Kim, Taehoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.22-31
    • /
    • 2018
  • Due to the inherent risk factors of the remodeling projects, the remodeling project is failing frequently, and schedule delay are occurring in most remodeling projects. The risk factors that cause the delays in these remodeling projects are not common to all remodeling projects, and the likelihood of risk factors will be affected by the various characteristics of the project. In this context, based on the results of a reliable survey conducted on 29 construction managers who have performed remodeling projects, this research analyzes (1) "importance of each characteristic", which means how frequently the characteristics of the remodeling project affect the occurrence of risk factors, (2) "the likelihood of delay risk factors for remodeling projects", which assesses which risk factors are most likely to occur, and 3) "the level of effect of project characteristics that affects the occurrence of each risk factor." Through this study, the relationship between various characteristics of the office building remodeling projects and the delay risk factors was analyzed in various aspects, in further, it is expected that the owner planning the remodeling will be able to grasp the delay risk that is likely to occur according to the characteristics of the project in advance.

Development of Robust-SDP for improving dam operation to cope with non-stationarity of climate change (기후변화의 비정상성 대비 댐 운영 개선을 위한 Robust-SDP의 개발)

  • Yoon, Hae Na;Seo, Seung Beom;Kim, Young-Oh
    • Journal of Korea Water Resources Association
    • /
    • v.51 no.spc
    • /
    • pp.1135-1148
    • /
    • 2018
  • Previous studies on reservoir operation have been assumed that the climate in the future would be similar to that in the past. However, in the presence of climate non-stationarity, Robust Optimization (RO) which finds the feasible solutions under broader uncertainty is necessary. RO improves the existing optimization method by adding a robust term to the objective function that controls the uncertainty inherent due to input data instability. This study proposed Robust-SDP that combines Stochastic Dynamic Programming (SDP) and RO to estimate dam operation rules while coping with climate non-stationarity. The future inflow series that reflect climate non-stationarity were synthetically generated. We then evaluated the capacity of the dam operation rules obtained from the past inflow series based on six evaluation indicators and two decision support schemes. Although Robust-SDP was successful in reducing the incidence of extreme water scarcity events under climate non-stationarity, there was a trade-off between the number of extreme water scarcity events and the water scarcity ratio. Thus, it is proposed that decision-makers choose their optimal rules in reference to the evaluation results and decision support illustrations.

Numerical Analysis of Collapse Behavior in Industrial Stack Explosive Demolition (산업용 연돌 발파해체에서 붕괴거동에 관한 수치해석적 연구)

  • Pu-Reun Jeon;Gyeong-Jo Min;Daisuke Fukuda;Hoon Park;Chul-Gi Suk;Tae-Hyeob Song;Kyong-Pil Jang;Sang-Ho Cho
    • Explosives and Blasting
    • /
    • v.41 no.3
    • /
    • pp.62-72
    • /
    • 2023
  • The aging of plant structures due to industrialization in the 1970s has increased the demand for blast demolition. While blasting can reduce exposure to environmental pollution by shortening the demolition period, improper blasting design and construction plans pose significant safety risks. Thus, it is vital to consider optimal blasting demolition conditions and other factors through collapse behavior simulation. This study utilizes a 3-D combined finite-discrete element method (FDEM) code-based 3-D DFPA to simulate the collapse of a chimney structure in a thermal power plant in Seocheon, South Korea. The collapse behavior from the numerical simulation is compared to the actual structure collapse, and the numerical simulation result presents good agreement with the actual building demolition. Additionally, various numerical simulations have been conducted on the chimney models to analyze the impact of the duct size in the pre-weakening area. The no-duct, duct, and double-area duct models were compared in terms of crack pattern and history of Z-axis displacement. The findings show that the elapse-time for demolition decreases as the area of the duct increases, causing collapse to occur quickly by increasing the load-bearing area.