Journal of Korean Society for Geospatial Information Science
/
v.4
no.2
s.8
/
pp.55-61
/
1996
The objective of this paper is to show an optimal design model for branched water supply system which also can find the optimal location of pumping stations using linear programming. GIS is utilized in this model to better handle the data and the results front the optimization. The developed model considers hydraulic influences of some appurtenances such as supply tunnels and a filtration plant The model also considers tunnel construction cost which should be treated differently from pipe construction cost Different from other models presently available, the model guarantees a nonnegative pressure at every junction node in the system. The objective function includes annual operation cost (electricity rate) ill addition to initial construction cost, thus producing a more reasonable decision. The model selects the optimal diameter not in the form of continuous number but in the form of commercial discrete diameter (pipe size) using the pipe lengths as decision variables instead of pipe diameters. The model not only determines the optimal pumping head for each pumping station but also finds the optimal location and number of pumping stations. GIS is used to handle hydraulic and budgetary data automatically and to visualize the results for the of optimal design of the system. The model has been applied to an existing water supply system. 'The results show that the optimization model with the aid of GIS is helpful in the decision-nulling process for the design of more economical systems, and can be dot into practice successfully.
Journal of the Korea Academia-Industrial cooperation Society
/
v.18
no.12
/
pp.140-149
/
2017
Recently, it has become necessary to consider climate change when managing multi-purpose river functions. However, in terms of domestic rivers, the management of national and local rivers is separated and the river information cannot be integratedly handled. Especially, it is not sufficient to collect and update information by recycling reports for design and construction. In addition, the basic information of the rivers is dependent on the GIS-based RIMGIS system, but the reliability of the information is deteriorating due to the construction of spatial information using the river basement planning results. The purpose of this study is to investigate the current status of the information system with regard to the maintenance and operation of the river facilities. Through the verification of actual cases, the optimal solution was suggested from the point of view of practical information. As a result, we constructed an information system for the reliable maintenance of river facilities and examined the integrated information management plan. The results of this study can be used to improve the existing information and technical and institutional procedures for the integrated maintenance and operation of river facilities. It will be helpful to introduce the BIM as well as solve to the information gap with other fields through the establishment of an information framework to improve the information construction of river areas.
At present, environmental monitoring of linear infrastructure is based mainly on field sampling. The 'integrated mapping' approach has received only limited attention from field scientists. The increased environmental regulation of corridor targets has required remote sensing research to develop a sensor or technique for targets ranging from 15 m to 100 m in swath width. In an attempt to identify the optimal remote sensing system for linear targets, an overview is provided of the application requirements and the technology currently available. The relative limitation of traditional remote sensing systems in such a linear application is briefly discussed. It is noted that airborne video could provide, in a cost-effective manner, information required for a very narrow and long strip target utilising the narrow view angle and dynamic stereo coverage. The value of this paper is warranted in proposing a new concept of video infrastructure monitoring as a future research direction in the recognition of sensor characteristics and limitations.
Interest in smart cities is growing; information and communication technology, urban planning, urban economy development, health, and many other areas are intertwined within smart city research and practice. The definition of smart city is evolving, and its vagueness is sometimes confusing. This review of the smart city literature tries to capture the big picture of this big idea. This review places into context work done since 2016, as earlier work is well reviewed in Albino (2015) and Cochia (2014). First is a review of the various smart city definitions. Second, an inventory of terms related to or subsumed by the smart city label are presented. Third, outcomes of indexes created to measure a city's smartness are presented. Fourth, the taxonomies used to organize the disparate content that falls under the smart city umbrella are discussed. Fifth, the most recent literature associated with six commonly recognized subgenres, namely smart economy, smart governance, smart living, smart people, smart environment, and smart mobility are reviewed. Sixth, important critiques of the smart city idea are presented.
KSCE Journal of Civil and Environmental Engineering Research
/
v.39
no.1
/
pp.239-246
/
2019
The drone photogrammetry is actively utilized for obtaining highly accurate spatial information and other various monitoring purposes. It is general to plan the drone photogrammetry by referring to previous experiences or cases in order to obtain the required accuracy, but the drone photogrammetry is often carried out again due to poor accuracy. Since the required spatial accuracy of the drone photogrammetry process result becomes the means of objective evaluation regardless of the type of result, it should be determined carefully. Therefore, it is necessary to determine flight height, overlap, number and arrangement of ground control point, and exterior orientation factor acquisition method in order to meet the required 3D positional accuracy for the design of drone photogrammetry project. In this study, previous study cases for the analysis of drone photogrammetry accuracy were carefully analyzed and verified by applying such cases to testing area, and design guideline of drone photogrammetry project for a small area was prepared based on the analysis result. The presented project design guideline is expected to be a great help to business practice although it is not perfect, and if the design guideline is prepared through comprehensive analysis in future, it would be possible to provide a perfect manual.
Purpose: Suggests measures to improve the construction company's safety management system according to the enforcement of the Severe Accident Punishment Act. Method: The effectiveness of practice-oriented disaster prevention activities was analyzed through safety and health diagnosis of the level of safety and health management system for the countermeasures against the Severe Accident Punishment Act implemented at the construction site and headquarters. Result: The effect of reducing the accident rate and the advancement of the safety and health management system were analyzed by linking the Severe Accident Punishment Act with the safety and health management system, and a plan to improve the safety and health management system was presented through the analysis of the comprehensive results of safety activities before and after the implementation of the Severe Accident Punishment Act. Conclusion: The effect of practical performance measurement was manifested through the improvement of business owners' awareness, the expansion of investment for disaster prevention, and the quantification of disaster prevention activities according to the enforcement of the Severe Accident Punishment Act.
Korean Journal of Construction Engineering and Management
/
v.16
no.4
/
pp.98-106
/
2015
VE aims at reduction in a budget, improvement of function, structural safety and quality security for public construction projects. However, there is possibility for the structural safety and quality security review to be insufficient because related regulations are mostly composed of analysis on economic efficiency of design. In addition, due to the misconception about VE as a cost saving methodology, an alternative is being presented which still focuses mainly on cost saving, but with no objective evaluation of function related to cost. In order to improve this, the government adopted the reduction of life cycle cost and proposal of value improvement, and let people specify the cost and function of the original plan versus the alternative plan, and the value changes between them. However, it is written mainly into practical convenience rather than theoretical basis since a specific way is not suggested. The current method sets a different starting point by applying the attributional difference of function and cost. Furthermore, an evaluation standard for correlating is an important element in rational decision making for assessing and choosing an alternative. This paper analyzes the process and method of function & cost scoring when performing VE and suggests a mathematical normalization model in order to support rational decision making when selecting an optimum plan.
Journal of the Korean Institute of Landscape Architecture
/
v.39
no.5
/
pp.76-90
/
2011
As most landscape drawings tend to be recorded in electronic format, the need for layer standards is growing. While the categorization system of planting drawings has been progressing, landscape facility drawings are being delayed. So, the purpose of this study was to establish the categorization system of computerized landscape facility drawing documents. In the beginning of this study, it found that the layer categorization system of "The Standards of Construction CALS/EC computerized drawings v1. 1" and "The submit instructions of electronic design documents" are not suitable for the landscape facility drawings. 1,154 drawings drawn by 10 landscape architect offices were used to analyze the current layer categorization status. As a result, it found that "The Standards of Construction CALS/EC computerized drawings v1. 1" were not introduced in landscape facility drawings and 46% of layers were produced indefinitely. The new layer categorization system consisting of 15 facility items was drawn by applying the ISO construction information categorization system. The new layer categorization system is set on the basis of the legal code, landscape design standards, and design guidelines of public institutions. This new layer categorization system is expected to propagate at the landscape architect offices in the early.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.373-378
/
2001
In order to analyze the problems and improvement methods in the quality management of domestic apartment construction projects, this study derived the four barrier factors through relevant literature survey and interviews with construction practitioners. Among these four factors, which are 1) policies and regulations, 2) technologies, 3) human and organization, and 4) other miscellaneous aspects, the human and organization factor is the main focus of this survey and it was decomposed into perception, management system, education, and system on quality management according to the Taguchi's S/N theory to survey existing problems and suggest improvement methods for them. The survey on the quality perception showed that all the members need to cooperate actively, and CEO and chief construction managers should recognize the quality as the highest priority and act by themselves accordingly. The survey on the quality management showed that they need to reform their business process to reduce redundant tasks and miscommunications among participants. Quality education should be provided in a way that people at different management level can be educated differently with close relation to their practices. Quality systems should help corrective actions against quality problems at construction fields. Also with clear quality management implantation polices and objectives, the quality system should be established in order to support better communication among project stakeholders.
Korean Journal of Construction Engineering and Management
/
v.19
no.3
/
pp.43-51
/
2018
Facility Management (FM) phase in building lifecycle management is the most crucial phase concerning building value and life cycle cost management. Nevertheless, systematic and rational FM process is not yet constructed, leading to failure of facility value and cost management from accurate and proactive FM. This is because there has been minimal approach regarding construction of optimal FM process based on rational FM data analysis. The purpose of this study is to provide optimal FM process with quantitative FM data analysis method using spatial data. This study investigated existing FM data structure and derive the limitation of it from both expert interview and practical FM material analysis. As a solution for this limitation, this study provided optimal FM process with MTBF (Mean Time Between Failure), which is quantitative FM data analysis method. The effect of the provided process was validated with a case study. It is expected that this process allows rational and objective FM data analysis, resulting in accurate and proactive FM. And it is expected that it can be used as a useful basic data for developing an effective system for the FM process.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.