• 제목/요약/키워드: 건설시뮬레이션

Search Result 582, Processing Time 0.03 seconds

Construction Process Analysis of Han-Ok for BIM Based Modern Han-Ok Construction Simulation (BIM 기반의 현대식 한옥 시공시뮬레이션 구현을 위한 한옥 공정분석 연구)

  • Yun, Seok-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.3-10
    • /
    • 2011
  • Currently, technologies for industrialization and dissemination for Han-Ok are developed actively. Also BIM technologies are actively developed. However, it is difficult to find the research and study cases for construction method and process for Han-Ok. BIM is the technology for managing information with element as a unit for building design, construction and management, and it is closely related to Han-Ok using assembling method for building construction. We analyzed the basic construction processes for IK-Gong and MinDoRi house, typical types of Han-Ok. Also we developed the Work Breakdown Structure of construction process for Han-Ok and suggested the method for construction simulation using BIM. Simple BIM model of Han-Ok which is Ik-Gong type is used for case study. It was possible to link automatically between 3D elements objects and construction activities about 95% in the case study. More studies of construction method for various type of Han-Ok and rules for link between elements and construction activities are required for Industrialization and dissemination of Han-Ok.

Evaluation of the Coverage Assessment of Rainfall-Runoff Model for Data Length (데이터 길이에 대한 강우-유출 모델 적용범위 평가)

  • Jeon Seong Jae;Shin Mun Ju;Jung Yong
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.383-383
    • /
    • 2023
  • 오늘날 수문학 분야에서는 유역에 대한 강우-유출 시뮬레이션을 머신 러닝(ML: Machine Learning)을 활용하여 다양한 연구를 실행하고 있다. 본 연구에서는 시간별 강우-유출 예측 모델인 GR4H(Génie Rural à 4 paramètres Horaires)를 사용하여 충주댐 유역을 대상으로 연구를 수행하였다. 유역의 속성에 따라서 모델의 성능이 어떻게 달라지는지 비교하여 특성에 맞는 모델을 알아내고. 또한 이 과정에서 기상 및 유출 데이터의 보정 길이를 가지고 어느 정도의 데이터 기간이 모델에서 좋은 성능을 보이는지 파악하였다. 뿐만 아니라 모델에 필요한 선행기간의 데이터가 있는 경우와 없는 경우를 비교하여 어떠한 차이를 보이는지, 그리고 선행기간은 얼마나 필요한지 연구를 통하여 알아냈다. 본 연구를 통하여 충주댐 유역에 대한 모델의 적용성 및 성능을 파악하고 수문 모형 구축에 제한이 있는 유역에 대해서도 사용이 가능한지 판단한다. 실험 유역의 관측 값을 모델에 입력한 후 각 모델에 해당하는 매개변수의 최적값을 찾아내는 과정을 거쳐 시뮬레이션을실 행했다. 본 연구에서 사용한 강우-유출 모델인 GR4H는 프랑스의 INRAE-Antony(Institut National de la recherche agronomique-Antony)에서 만들어진 airGR의 일종으로, 시간별 강우-유출 예측을 위해 개발된 공정 기반(process-based)의 집중적, 개념적 수문학 모델이다. 4개의 매개변수(parameter)가 있으며 이는 유역의 특정 속성을 나타낸다. GR4H를 시뮬레이션 하는 과정에서 매개변수의 최적화를 위해 적절한 보정 길이를 파악하여야 한다. 이러한 과정은 4년, 5년, 6년 등 1년씩 데이터의 양을 늘려가며 매개변수를 최적화한다. 이 과정에서 기상 및 유출 데이터의 적절한 보정 길이를 찾아낸다. 시뮬레이션을 통해 얻은 데이터를 관측 값과 비교하여 모델의 성능을 평가하고 다른 관측 값을 통해 시뮬레이션을 실행하여 검증을 거친다.

  • PDF

A methodology for an effective utilization of construction equipment for highway construction projects (도로공사 공정계획을 위한 공정 로직 및 건설장비 효율화 방안)

  • Song, Hojeong;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.26-34
    • /
    • 2014
  • Highway construction is a combination of linear, repetitive, and highly equipment intensive operations. Various types of construction equipment are deployed to ensure undisrupted performance of construction, and thus productivity improvement and cost-saving can be achieved through well-thought-out planning. The selection of construction equipment is dependent upon construction sequence, site conditions, and construction methods. In the process of planning, management should consider various types of construction methods per each type of construction operation. Also, management should map out proper construction equipment operation plan that takes the construction duration and cost measures into consideration. However, limited availability of historic data from the similar types of operations has been a stumbling block to proper construction planning, making the operations performed based upon experience and intuition guided by rules-of-thumb. As a consequence, the planing phase rarely provided an adequate validity in the implementation phase. The researchers developed a process logic for each construction type that management can utilize from early phase of highway construction planning process. Moreover, derived the construction equipment combination optimized for efficiency by using the process simulation technique. The developed method is expected to be useful for the decision-making process that aims to evaluate efficiency of various process plans and to ensure optimal selection of construction equipment for highway construction projects.

The Development of Noise Management Model using Active Noise Control Technique on Construction Site (능동소음제어를 이용한 건설현장의 소음관리모델 개발 - 도심지 공사현장을 중심으로 -)

  • Kwon, Nahyun;Park, Moonseo;Lee, Hyun-Soo;Ahn, Joseph;Kim, Sunwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.12-22
    • /
    • 2014
  • Recently, many people have been damaged seriously by construction noise. Accordingly, there have been increased the complaints and disputes. These complaints should be controlled strictly. Otherwise there could be delays or stops of project and losses of time and money. For this reasons, the Korean government is trying to convert from depending on the soundproof wall to noise control system focusing on noise sources. However, it is difficult to control the noise which is generated from construction site because construction equipment has very high noise level and construction noise generates temporarily and irregularly. Also, people do not know how much low frequency affect human body adversely because they cannot perceive low frequency noise easily. Hence, recently developed countries have conducted the research on the low frequency noise which damages on human physically and mentally. However, passive noise control is insufficient to reduce the low frequency noise, but only efficient to lower the high frequency noise. Thus, an approach which can complement limitations of passive noise control is needed. Therefore, the purpose of this research is to suggest the noise management model using active noise control on construction site. Also, ANC simulation has been conducted to examine its applicability on construction equipment. As a result, it is expected that there will be a reduction of construction noise and demages, as well as both mental and physical damages.

A Study of the Tower Crane Hoisting Time Estimation Simulation Model with Climate Element for the High-Rise Building Construction (기후요소를 고려한 초고층 건설공사의 타워크레인 양중시간 예측 시뮬레이션 모델)

  • Yang, Kanghyeok;Lee, Hyun-Soo;Park, Moonseo;Jung, Minhyeok;Hwang, Sungjoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.96-107
    • /
    • 2013
  • Tower crane hoisting plan is one of the key element for the success of entire High-Rise Building construction. Hoisting time is the basic factor to appropriate hoisting plan which need to the hoisting load estimate and tower crane selection. With this reason, accurate hoisting time is needed to the proper hoisting plan. The current hoisting time estimation for High-Rise Building focus on the hoisting cycle time estimation with historical data. However, this method underestimated the external influences like environmental factor. Thus, this paper aims to develop the hoisting time estimation model with discrete event simulation which include the wind influences with certain height. According to the simulation result, the hoisting time which applied wind influence is increasing with height growth. Because of the high speed wind, the upper area of building has more operation delay time than the mechanical operation time. Seoul, the research area, has the most fastest wind speed on April and the least on October. Due to these differences of wind speed, the hoisting time is estimated with significant differences between April and October. This hosting time estimation model would be used for estimating the influence of wind. Moreover, this could apply to make the realistic hoisting plan.

Quantification Model Development of Human Accidents based on the Insurance Claim Payout on Construction Site (건설공사보험 사례를 활용한 건설현장 인명사고 정량화 모델 개발)

  • Ha, Sun-Geun;Kim, Tae-Hui;Son, Ki-Young;Kim, Ji-Myong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.2
    • /
    • pp.151-159
    • /
    • 2018
  • Accident rate in the construction industry of South Korea is increasing every year, and it represents the highest percentage among industries. This shows that activities performed to prevent safety accidents in the country are not efficient when it comes to reduce the accident rate. In order to resolve this issue, a model for the prediction of human accidents should be established. In addition, it is required a quantification study based on pattern of human accidents. Therefore, the objective of this study is to quantify uncertainty of human accidents risk and predict how to change in various circumstances by using Monte Carlo Simulation. To achieve the objective, first, pattern of human accidents was defined. Second, insurance claim payout and information of human accidents during 14 years in construction site were collected. Third, descriptive analysis is conducted to determine the characteristics of the accident pattern. Fourth, to quantitatively analyze the pattern of the human accidents, the population of each accident occurrence and payout were estimated. Finally, estimated populations was analyzed according to characteristics of distribution by using Monte carlo simulation. In the future, this study can be used as a reference for developing the safety management checklist in construction site and development of prediction models of human accident.