• Title/Summary/Keyword: 건설사업 관리

Search Result 1,827, Processing Time 0.036 seconds

A Case Study on Construction Management in Nuritkum Square Project (누리꿈스퀘어 프로젝트의 건설사업관리 사례)

  • Lim, Hyun-Yong;Yoo, Seung-Kon;Seo, Joon-Oh
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.25-31
    • /
    • 2007
  • Nuritkum Square Project is a IT Complex which is being constructed in Digital Media City. The project consists of several buildings and is a Design-build, so that the systematic construction management from design to construction stage is more important for a successful project. This study introduces the practical tasks of construction management during the project and analyze some of main tasks to increase understanding construction management in the design-build project. Based on experience of construction management in this project, we examine managerial problems which frequently occur in this kind of project, and suggest how to improve construction management in Korea.

  • PDF

Characteristics of the Duty of care of a Good Manager according to the Construction Manager's Task (건설사업관리자의 수행업무에 따른 선관주의의무 특성)

  • Chung, Young-Ho;Lee, Sang-Beom;Park, Hyun-Jung;Cho, Hyeong-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.36-43
    • /
    • 2012
  • When the construction management method was introduced, there were arguments regarding the contractual responsibility of the construction manager. Accordingly, the provisions on damage compensation in the Construction Technology Management Act were revised in 2002, and the obligatory duty of care of a good manager is now required by the Framework Act on the Construction Industry. Even though the construction manager has a responsibility of a consultant in the CM-for-fee contract, however, the Korean construction environment does not clearly specify the consultant's scope of responsibility. In this study, the theory about the duty of care, which is a consultant's responsibility among the expert's responsibilities, was arranged. Based on the responsibilities of experts such as lawyers, the duties of care of a good manager of the construction manager were presented to provide the foundation for establishing the construction manager's responsibilities. To verify the resulting items, interviews with experts were performed to assess their importance levels.

A Study on CM Process Model for Reconstuction Project (주택 재건축 정비사업의 건설사업관리(CM) 적용 모델 구축)

  • Ahn, Kyung-Hwan;Cha, Woo-Chul;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.295-298
    • /
    • 2007
  • Recently, various problems have been occurred in Apartment reconstruction process. Such as, delaying schedule, additional cost increasing, etc. Those were caused by decision making which is lack of professionality in early phase of reconstruction process. Therefore, in this study proposed improvement plan by application of project management and construction management process in Apartment reconstruction project.

  • PDF

The Analysis of the Major Cost-increasing Risk Factors from the Perspective of Construction Management -Focusing on Pre-construction Phases- (건설사업관리자 관점에서의 주요 사업비 초과 리스크 요인 분석 -시공 전(前)단계를 중심으로-)

  • Kim, Byung-Yong;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.147-155
    • /
    • 2012
  • Recently, various construction projects are invested with plenty capital, manpower and resources. The advanced methods of the construction management is introduced to Korea. However, the cases which get involved in excessive cost frequently occur. We can explain it means that the cost management in the entire phases and the risk factors in its works has not been done yet as expected. Thus, it is necessary to unearth risk factors relative to cost management and analyse them for preventing cost-increasing and the success of projects. In this point of view, this study aims to identify the risk factors of the cost management focused on pre-construction stages from the perspective of construction management which is possible to take part in the whole phases and works in cost management. Also, the impact priority and grade of risk factors to cost-increasing are evaluated by using FMEA.

The Case of CM Type Supervision Apartment House Construction Work - Focused on the Case of Baekseok-Cheonan 2BL Construction Work - (공동주택건설공사의 CM형 책임감리 사례 - 천안백석 2BL 아파트건설공사 사례를 중심으로 -)

  • Lee, Kab-Weon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.41-48
    • /
    • 2004
  • The objective of the CM model projects is to achieve gradually the development of Domestic Construction, Industry with function, effects, problems and improvement which are the results after assessing tills finished project on the basis of CM Plan. The result is very useful of being activated CM and giving good orders continuously. Therefore this study describes work scope, organization, performance and management process for Baekseok-Cheonan 2BL project and picks out practical problems about CM and then suggests CM technical development directions and institutional improvements.

  • PDF

Introduction to CM Experience from Incheon International Airport (IIA) Construction Project (인천국제공항건설 사업관리 경험)

  • Park, Dae-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.20-25
    • /
    • 2004
  • On July $18^{th}$, 2003, Incheon International Airport Corporation(lIAC) signed the Construction Management Service Contract with KIDS consortium (composed of Kun-Won Eng., ITM Corp, Do-Hwa Eng, Space Croup) for the $2^{nd}$ phase construction protect consists of landfill, $\#3$ runway, remote Concourse, IAT, BHS, cargo terminal, etc scheduled to be finished by the end of 2008. KIDS dispatched qualified engineers to the Construction Management Division of IIAC for providing technical assistance to IIAC members to pursue project goals in tulle. within budget with appropriate quality level to build one of leading hul] airports for the Northeast Asia legion in the $21^{st}$ century. The work scope covers upgrading various project procedures and related computer programs, cost and schedule control, design supervision for building design including support systerns such as HVAC, fire protection, elevators and escalators, boarding bridges, electrical and communication systems, and technical support for IAT/BHS, QA/QC, field test and inspection, start-up and commissioning, etc. The purpose of this paper is to introduce the major activities of the Construction Management Services performing at the IIA project for your reference.

  • PDF

A Study on the Proper Methodology for Selecting Domestic Public Sector Construction Management Contracts (국내 공공부문 CM의 평가 및 낙찰자 선정방법 개선안 연구)

  • Lee Yong-Jun;Lee Hak-ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.296-299
    • /
    • 2002
  • Construction Management tends to create a formal procurement resulted from recent legislative procedures system in domestic construction industry. However, the fact that construction Manager(CMr) has been chosen, in practice, under a poor circumstance in selecting and discriminating specialty requires the more optimal procedures. Therefore, in this research, we analyze the existing shortcomings. the various procedures, influence factors, and the criteria to be considered in selecting and evaluating CMr. Also. this study suggests the improved method based on the facts above. To accomplish the construction project successfully, it is one of the advanced schemes to choose an adequate CMr needed to the project through the precision in the formation and application of the procedure as well as the suggested criterion in selecting CM.

  • PDF

Wiki-based Interactive Electronic Technical Manuals (IETM) for Construction Project Management : Through a Case Study of Urban Regeneration Projects (Wiki기반 건설 사업관리 전자매뉴얼 : 도시환경정비사업 사례연구를 통해)

  • Park, Moon-Seo;Kang, Sung-Hoon;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.3-12
    • /
    • 2010
  • Recently, workers on construction sites can hardly understand their tasks and the process of the tasks because the construction projects are becoming large and complex. Due to the complexity, workers need a tool that can help them understand their works and some paper-based manuals exist to support them. However, the existing paperbased manuals are not actively used by workers due to the low credibility of information on the manual. In particular, paper-based manual can not be updated frequently because those manuals have to be manually updated by experts. Thus, the credibility of information is decreased and the decrease let the users distrust information of the paper-based manual. Therefore, this research analyzed the feature of wiki-based system and suggested an wiki-based IETM(Interactive Electronic Technical Manual) system model that can be modified by users, and then conducted a survey through a prototype based on urban regeneration project. The result of the survey indicated that wikibased IETM can improve the stakeholder communication by reinforcing the process of creating knowledge as well as knowledge itself.