• Title/Summary/Keyword: 건설사업 계획단계

Search Result 206, Processing Time 0.029 seconds

An Intensification Plan of Technical Competitive strength in Domestic Construction Engineering Company (건설엔지니어링업체의 기술경쟁력 강화방안)

  • Park Hwan Pyo;Lee Kyo Sun;Ji Sang Wuk;Park Sang Hun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.3 s.11
    • /
    • pp.66-74
    • /
    • 2002
  • The Cost of Engineering is composed of the $3{\~}5{\%}$ of total cost of construction. It is important the role of engineering in the first stage of the business. But, it was not more the technical level of domestic design stage than advanced state. Expecially, it was because of the cognition lack and unreliable results about technical development. The result of that, it was lacking to the draw results of foreign countries. And it was to waste national budget through overlapped adopting of similar technologies from abroad that few projects are performed as their original plan. Therefore, the research is proposed to the intensification plan of technical competitive strength in domestic construction engineering company to cope with the change of economic environment.

Development of Pre-workshop Phase for the VE application at the Early Planning Stage of the Mega Project (메가프로젝트 기획/계획단계 VE적용을 위한 준비단계 수행방안)

  • Ha, Seung-Ryong;Hyun, Chang-Taek;Son, Myung-Jin;Kim, Yun-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.4
    • /
    • pp.29-39
    • /
    • 2011
  • In Korea, many mixed-used development projects(MXD) in mega project size are currently active. As these mega projects require long-term construction and execution and involve by different subjects in different fields, their completion breeds various problems, such as conflicts among project participants due to their complicated interest relationships and inaccuracy in predicting the economic performance of the projects due to inappropriate facility capacity planning. To solve these problems, it is essential to apply value engineering (VE) at the planning phase of the project, which can result in the best possible cost reduction and improvement of project performance. However, not many projects are actually implementing VE because of the lack of available information, as well as the limitations due to uncertainty in the early period of project execution. Therefore, this study aimed at proposing VE Team Building, Quality Model Performance Indexes, Space Model so as to resolve common mega project problems and overcome VE application limitations at planning stage. The result of this study is expected that the data can be utilized as basic data to apply VE at the planning phase of the large complex projects.

An Analysis of Housing Price Affected by the Implementation Stage of Redevelopment Project (재개발사업 특성 및 시행단계에 따른 사업구역 내 주택가격영향에 관한 연구)

  • Lee, Jaewon;Bae, Sangyoung;Lee, Sangyoub
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.23-33
    • /
    • 2019
  • The purpose of this study is to analyze the housing price variation within the redevelopment project district, affected by the characteristics of project and implementation stage. This study implemented the hedonic price model employing the actual transaction price with 24 dependent variables from 2006 to 2016 inside 19 redevelopment districts in Seoul. Research finding indicates that the larger ratio of the number of tenants and general distribution, the smaller ratio of rented households and the more positive effect of housing price. It is noteworthy that this study demonstrated the actual transaction price of houses located within the project districts by implementation stage. This study is expected to help the policy makers, the developers and the investors make more reliable decisions on the feasibility study related to the redevelopment project.

토목계의 어제와 오늘과 내일

  • Choe, Yeong-Park
    • The Science & Technology
    • /
    • v.10 no.9 s.100
    • /
    • pp.33-39
    • /
    • 1977
  • 토목기술이란 토목사업을 지탱하는 기술로서 여기서 토목기술이란 토목을 주로 하여 건축구조의 공학적인 것을 포함한 기술이라고 할 수 있다. 토목사업은 오늘날 국토의 보전ㆍ수자원개발ㆍ교통로정비(항만포함)ㆍ도시와 지방계획 및 상하수도를 포함한 도시건설 등이며, 어느 것이나 국민의 생산과 생활환경개선 등 우리 인간의 앙적한 생활과 복지편익을 추진시키는 기간산업이 아닌 것이 없다. 그래서, 인간사회가 발전을 갈망한다면 토목건설사업이 선행되어야하고, 토목사업으로 확립된 기반아래 국민들의 건전한 생활이 영위되는 것은 물론이다. 토목이라하면 주로 우리나라에서는 국토건설로서 지역, 또는 국가사회의 경제발전에 크게 영향을 미치는 토목건설사업을 말한다. 이것은 토목기술의 발전이 그때 그때의 건설사업으로서 구상화되는 까닭이라 하겠다. 한편, 인간의 가치관에 변화가 생기고 자원문제ㆍ공공문제ㆍ생활환경문제 등이 크게 변화하는 단계에 있어서도 그 방향을 탐색하고 우리 인간 및 국가사회가 의도하는 건설공간구상을 계획하고 사업화 하는데 매우 중요한 것은 토목건설인 까닭에서이다. 이런 의미에서 최근 100년간의 경이적인 서구의 근대화 과정에서의 토목기술 발전, 즉 이 기술이 매우 오늘날 세계를 변혁시킨 사실에서 출발한데 대비하여 우리 나라 개항 100년 이후의 안타까운 우리의 기술수용과정을 볼 때 1986년 강화도조약 이후 한반도는 일본 및 청국을 위시한 구미열강외세의 각축장으로서 혼미된 서구근대기술의 도입요람기로 시작하여 1810년 한일합방에서 8.15해방까지 일본통치하에서 타율적인 토목ㆍ건축기술의 도입으로 한마디로 말해서, 거의 70년간의 진통기가 있음을 엿볼 수 있다. 하지만 최근 30년 사이에 그야말로 우리 토목기술터전은 급격하게 성장 발전하고 있다.

  • PDF

Development and Application of TACT Management System (TACT 공정관리 시스템 개발 및 적용 사례)

  • Suh Sang-Wook;Kim Jae-Ho;Kim Sun-Kuk;Kim Chang-Duk;Lee Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.145-154
    • /
    • 2003
  • The change in environment of construction industry and the advancement of information technology require the improvement of construction project efficiency. However, construction industry still lacks performance-measuring tools that are the requirements of efficient project management system. In case of the schedule management system, schedule is usually being managed by result-oriented measurements such as completion time, spent cost, and progress rate, which are not good enough to control the overall continuity of work-flow. This research aimed to systemize the overall construction process and to develop the indicators for measuring performance of TACT activities during finishing work period that can contribute to the systemization of TACT management.

Development and Application of TACT Management System (TACT 공정관리 시스템 개발 및 적용 사례)

  • Kim Jea-Ho;Suh Sang-Wook;Kim Sun-Kuk;Kim Chang-Duk;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.126-134
    • /
    • 2003
  • The change in environment of construction industry and the advancement of information technology require the improvement of construction project efficiency. However, construction industry still lacks performance-measuring tools that are the requirements of efficient project management system. In case of the schedule management system, schedule is usually being managed by result-oriented measurements such as completion time, spent cost, and progress rate, which are not good enough to control the overall continuity of work-flow. This research aimed to systemize the overall construction process and to develop the indicators for measuring performance of TACT activities during finishing work period that can contribute to the systemization of TACT management.

  • PDF

Strategic Environmental Assessment and Integration of Development and Environmental Planning in Korea (전략환경평가와 개발계획 및 환경계획의 통합)

  • Lee, Jong Ho;Cho, Jae Heon
    • Journal of Environmental Impact Assessment
    • /
    • v.16 no.6
    • /
    • pp.433-446
    • /
    • 2007
  • 환경영향평가는 대규모 개발사업을 대상으로, 계획 확정후 사업 실시단계에서 개발사업 시행에 따른 환경영향 저감방안을 중점 검토하는 제도인데, 사전환경성검토는 행정계획과 환경상 민감지역의 소규모 개발사업을 대상으로, 계획 확정 이전단계에서 환경적 측면에서 입지나 개발의 적정성 타당성을 사전에 검토하는 제도이다. 사전환경성검토는 2006년 6월부터 대상 행정계획을 구체적 개발사업의 상위 행정계획으로 확대하고, 계획의 적정성, 입지의 타당성을 미리 검토할 수 있도록 하고, 검토과정에서 주민, 전문가, 시민단체 등 이해관계자의 의견수렴을 거치도록 하는 전략환경평가 체제로 개편됨으로써, 환경갈등이나 사회 경제적 문제를 예방할 수 있는 기반을 보다 강화하였다. 환경부 주관의 사전환경성검토가 전략환경평가를 강화하는 동안 건설교통부가 중장기기본계획에 대한 전략환경평가를 시행하기 시작하였다. 우리나라의 전략환경평가는 건설교통부와 환경부가 전략환경평가를 별도로 운영하는 데 따른 비효율성, 국토계획과 환경계획의 연계성 부족, 선거공약으로 제안된 대규모 개발계획 등에 대한 객관적 환경평가의 어려움 등의 문제를 가지고 있다. 따라서 본 연구는 전략환경평가제도의 정립을 위해, 환경정책패러다임의 변천, 환경영향평가와 사전환경성검토의 발전, 전략환경평가의 현황과 선거공약으로 제안된 대규모 개발계획에 대한 전략환경평가의 한계 등을 고찰한 후, 전략환경평가제도의 발전방향과 개발계획과 환경계획의 연계통합방안을 모색하고자 한다.

A Study on the Process Improvement of Budgeted Cost of Earned Value Management in Multiple Apartment Project (공정-공사비 통합 프로세스 개선을 통한 대단지 아파트 건설공사의 계획기성 산출 및 관리)

  • Yang Yong-Cheol;Kim Sang-Hee;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.123-136
    • /
    • 2003
  • In multiple apartment construction project, BCWS is a critical management factor and has a great influence on the success of the project. Due to the many apartment buildings & facilities which produce numerous activities, there are several problems in making out a time schedule of work as well as production and management of precise BCWS from the allocation of resources. In this study, actual condition survey was executed in terms of the calculation and the management of BCWS. This study propose better solutions for efficient calculation of BCWS through the analysis of the problems and standard schedule & progress curves.

A study on the Processor of City construction and u-City business (도시건설사업과 u-City 사업 프로세스)

  • Yoo, Jae-Duck;Shin, Hyun-Sik
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.4 no.4
    • /
    • pp.287-292
    • /
    • 2009
  • u-City business is IT projects and City development processor which be coupled to the city development in the planning stages, and u-City planning and design reflecting at that stages can be built efficiently, and cost savings can be. This paper study on how to link between City construction processor and u-City business processor, especially u-City business for success, the key step of the USP (u -City Strategic Planning) be studied.

  • PDF

현장탐방 - (주)성아테크 가락시장 시설현대화사업 제1단계 신축공사

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.292
    • /
    • pp.70-78
    • /
    • 2014
  • 가락동 농수산물도매시장은 지난 1985년 개설된 국내 최초 공영도매시장이자 연간 230만톤 거래 규모의 세계 최대 도매시장으로 서울시민 농수산 먹거리의 약 50%를 담당하고 있으며 전국 공영도매시장 물량의 약 33%를 처리하는 등 전국 농수산물 유통의 중추 기능을 담당하고 있다. 가락시장은 5,000여개 유통업체가 영업 중이며 하루 이용객은 13만명, 출입차량은 6만7,000대에 달할 정도로 과부하를 겪고 있다. 또한 도시 주거환경을 저해하는 혐오시설로 치부돼 이전 압박을 받아왔으며 전반적인 시설 노후화와 유통 수요에 부적합한 물류구조, 주변 교통정체 야기 등의 문제로 시설현대화 필요성도 제기되어 왔다. 이에 따라 서울시농수산식품공사가 지난 2009년 재건축을 통한 시설현대화 사업을 발표하고 기존의 시장 기능을 유지하면서 재건축을 하는 순환식 시설현대화 사업을 3단계(당초 계획은 2009년~2018년까지 10년 예상했으나 가락시장 계획변경 타당성 검토용역 결과에 따라 2025년까지 지연될 것으로 예상됨)에 걸쳐 추진키로 했다. 이에 따라 1단계 사업은 지난 2011년 6월부터 진행되어 2015년 2월 준공 예정이다. 본지는 가락시장 시설현대화 1단계 공사에서 기계설비 및 소방공사를 담당한 (주)성아테크(대표 정해돈) 이완식 현장소장과 시공사인 대림산업(주) 박승재 현장소장을 만나 현장 이야기를 들어 보았다.

  • PDF