Korean Journal of Construction Engineering and Management
/
v.24
no.1
/
pp.3-11
/
2023
According to the post evaluation scheme in Korea of a public construction project which is more than 30 Billion KRW, project performance is evaluated by investigating outcomes and effects of the construction after the completion of the project. The current post evaluation results can be used for planning and estimating a construction project in the future. However, it is not easy to utilized for an on-going project because the system does not provide the phase-based performance of a project. Although project planning performance is important for project initiation, few attempt has been made to evaluate planning performance in Korea. The purpose of this study is to provide a conceptual performance evaluation of planning performance using preliminary feasibility study conducted by Korea Development Institute. This study developed a planning performance database using data extracted from preliminary feasibility study reports of the completed 354 road construction projects. This study analyzed the performance of the planning stage of road projects by developing absolute metrics such as standard construction cost and standard construction schedule based on a Lane-Km. Using the standard construction cost and schedule metrics, the planning performance was analyzed by project characteristics. The results of this study can be used for phase-based performance evaluation from planning phase to construction phase.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.418-421
/
2006
오늘날의 건설사업 환경은 차별화 ${\cdot}$ 정보화 ${\cdot}$ 특성화 ${\cdot}$ R&D등 지식과 기술 및 창의성을 바탕으로 한 창조적 결과물 생산으로의 요구를 확대하고 있다. 이러한 환경은 건설 사업을 수행하는 기술자 집단에게 사업수행의 미래 가치적 최적화를 위해 기획과 계획에서부터 시공과 유지관리 및 장기 지속가능성까지 보장하는 생애주기차원의 사업수행을 요구하는 것이기 때문에 사업의 타당성 분석에서부터 실시간 정보처리와 가치창조를 위한 사업수행 계획이 절대적이라 할 수 있다. 본 연구에서는 그동안 국내 사업일정계획에서 적용하고 있거나 적용할 필요성이 있는 사업단계와 단계별 업무영역을 구분하고, 정보화 운영관리 방안을 분석함으로서 국내 건설 환경에 적합하고 신뢰성을 보장 할 수 있는 일정계획을 수립할 수 있는 방향을 제시하고자 한다.
Park, Jong-Soon;Shin, Chang-Joon;Yoo, Byeong-Gi;Chun, Jae-Youl
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.5-12
/
2008
The construction of Pusan National University Yangsan Hospital is a new construction of a medical town in Yangsan. It is a case that CMr participated in the project from planning to post-completion. It shows an actual proof of Construction Management business applied CM by each phase. In this case, CMr selected the design-build contractor in the planning phase and technically performed CM businesses in every single phase such as design and construction schedule management regarding application of Fast Track technique, procurement management and contract administration in phases based on the Fast-tract; technique, design review, VE in the design phase, change order management in the construction phase and operating and maintenance in the post-construction phase. This study would go far toward applying CM to Mega Turnkey projects by analyzing the problems of CMr's practical application to the project and providing guidelines for effective and efficient CM business implementation especially in the Turnkey projects.
Korean Journal of Construction Engineering and Management
/
v.9
no.3
/
pp.65-74
/
2008
Public institutions recognize the importance of cost management from the planning stage but they do not have an organized construction cost estimation and management system. Thus, at the stage of planning a new public construction project and estimating the cost, those in charge of budgeting estimate construction cost based on existing data and experiences, compare construction cost estimated after the basic design stage and the execution design stage with budgets, and then decide whether to continue the project or change the design according to the budgets. Therefore, we would develop the cost prediction model through regression analysis that can predict construction cost in Schematic Design Phase of the Public Multi-Family housing. Accordingly, if public institutions have a construction cost prediction model and management system that can estimate the optimum construction cost, they can make and execute budgets in a more efficient way than they do at present.
Korean Journal of Construction Engineering and Management
/
v.12
no.4
/
pp.139-148
/
2011
u-City projects are different with the existing urban development projects progress via convergence with IT technology. Therefore, it inheres many risk factors more than the existing development projects as including more complexity and variety. The risk management system to systematically manage those risks which get identified and quantified is required. Especially, the planning phase that is appeared the various forms has a large effect on the success of the business. However, the management of risk factors remains in the passive form. So the problems on u-City project in the planning phase and risk factors of existing development business were analyzed for the continuous growth and the successful performance of u-City project, and those risk factors was identified and quantified by using statistical technique. In the results of it, the core risk factors were obtained through which way and the basis for the effective risk management in u-City business is provided.
Korean Journal of Construction Engineering and Management
/
v.12
no.3
/
pp.22-30
/
2011
In the planning phase of domestic urban environment maintenance and improvement projects, a particular problem is the increase in service expenses and project cost with the establishment of plans under circumstances that exclude the residents or have incomplete consent from them and the public organization. This delays the promotion of the project. This study aims to resolve such problems by proposing a measure to introduce a privatepublic consultative body for residents and the relevant departments of the public sector, to encourage them to participate and establish plans together from the beginning. This is expected to contribute to the smooth promotion of the project, as it would remove the conflicting factors that are expected to be generated in the project implementation phase before they could emerge.
서울특별시는 지난 5월 16일 "서울특별시 지역건설산업 활성화에 관한 조례"를 개정 공포했다. 서울특별시는 사업의 기본계획 단계에서 분할발주 여부를 검토 시행하고, 활성화 추진 목표 달성 현황을 매 반기별로 건설위원회에 보고토록 제도화함으로써 지역중소건설업체의 분할발주 활성화에 물꼬를 텄다. 주요 개정내용으로는 지역 중소건설업자의 공사참여 기회를 보장하기 위하여 분할 발주 가능 여부를 판단함에 있어 예산편성과 기본설계 등 사업의 계획단계부터 검토 시행토록(제6조제2항, 신설) 했으며, 매년 반기별로 활성화계획의 추진 목표 달성 현황을 보고하되 정성적인 부분과 정량적인 부분을 모두 보고토록(제4조제6항, 신설) 한 것이다. 이번 조례 개정으로 서울특별시는 "공사의 성격상 공종을 분리하여도 하자책임 구분이 용이하고 품질 및 안전관리에 지장이 없는 기계설비공사 등에 대해 분리발주를 적극 적용함으로써 지역 중소전문건설업체의 권익을 도모하는 한편 타 시 도의 표본이 될 수 있을 것으로 기대한다"고 밝혔다.
Park Jang-Seob;Song Jong-Seok;Shin Soo-Am;Kim Chang-Duk
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.481-484
/
2003
Recently, the importance of Pre-construction is gradually increasing in construction business. In addition to increasing greatness, Pre-construction affect to success or failure of projects. However, current domestic construction business doesn't constitute exact concepts and systems, and there are a lot of problems such as disorganize management of construction because most of Pre-construction depends on supervisors' experiences. Therefore, according as doing this study, We are going to analyze the tendency of Pre-construction step and bring up designed operation systems between departments in construction company. So we can expect to develop efficiency by excluding unnecessary operation and formulating more improved operation process.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.295-298
/
2007
Recently, various problems have been occurred in Apartment reconstruction process. Such as, delaying schedule, additional cost increasing, etc. Those were caused by decision making which is lack of professionality in early phase of reconstruction process. Therefore, in this study proposed improvement plan by application of project management and construction management process in Apartment reconstruction project.
Korean Journal of Construction Engineering and Management
/
v.9
no.2
/
pp.117-124
/
2008
Environment-indifferent developments have brought about a great deal of environmental pollution and a destruction of the ecosystem. The global interest in environmental pollution has emerged in accordance with the environmental regulations becoming ever stricter in the international society. Various attempts are being pitched in Korea such as the PERS (Prior Environmental Review System) and EIA (Environmental Impact Assessment) and they practice a significant impact on the construction industry. Recently, there have been cases where large-scale national development businesses are delayed and terminated or re-examined for their feasibility for not having reflected and analyzed the environmental factors of the natural and ecological environment. We must sustain the ecological functions and balance and minimize environmental pollution issues that can be caused by land developments and preserve the natural environment so to induce environmentally-friendly development businesses. Thus, this research paper proposes environmental review categories of the natural ecosystem sector that can be applied to all stages of construction businesses including master planning stages, basic planning and execution designing stage, construction stage, and maintenance stage. The environmental review categories proposed in this paper are expected to offer a great deal of support in terms of inducing environment-sustainable development to decision makers in the master plan stage, designers in the basic planning and execution designing stage, and construction managers in the construction and maintenance stages.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.