• Title/Summary/Keyword: 건설사업관리(CM)

Search Result 226, Processing Time 0.024 seconds

Diagnostic Analysis and Influential Factors of CM Fee Estimation (CM 대가 산정방식의 문제점 분석에 대한 연구 -문화예술회관 사례를 중심으로-)

  • Yoo, Byeong-Gi;Jung, Chan-Young;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.132-140
    • /
    • 2006
  • On December, 1996, Construction Management(CM) was introduced in Korean construction industry due to its managerial efficiency proven in the international construction industries. However, It have had serious problems with many regulations, standards, manuals and details of practices considering its constituents and industry conditions. Especially, there were controversial points in the CM fee estimate; difference between the fee on the owner's view point and that from contractor's that impedes appropriate CM services. Therefore, this paper is to analyze public construction projects into Cm fee calculation such as fee as a percent of construction cost, cost plus fixed fee and contract price, and analyzed what is irrationality and why irrationality is made. So it makes a contribution to a study on standards for paper CM fee calculation.

Management Structure Improvement by Construction Management in The Project Financing Development Projects (프로젝트파이낸싱 기반 수익형개발사업에 CM적용을 통한 관리구조 개선방안)

  • Lee Eun-Suk;Kim Yang-Hyun;Jung Yong-Chan;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.250-253
    • /
    • 2003
  • Many construction companies have been trying to extend their businesses to the development projects after IMF. Project financing was introduced to the construction market and has been popular with construction companies which can not furnish funds for project by themselves. But, there are so many problems that project financing has not been activated in the construction field. One of the main factors that disturb activation of project financing is distrust about construction management among participants. This distrust is caused by the lack of speciality, objectivity, clearness about CM. So, to process business successfully, they need specialty and objectivity for the construction management. In this research, I analyzed the role and duty of the main participants about CM in the development project ana suggested an advanced management structure in order to activate project financing in the development projects.

  • PDF

A Review of the Improvement of Construction Management (CM) System and the CM Policy for the Public Construction Works (공공사업의 CM제도 개선 및 정책방향)

  • Jang Kie-Chang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.207-212
    • /
    • 2002
  • The Construction Management(CM) System in Korea is systematized both in name and reality by being prescribed in Construction Industry Act('97) and Construction Management Act('01) through various discussions considering reformation of construction industry structure and enhancement of construction technology competitiveness. Specially in the public construction works, CM Pilot Project is promoted by central government for the activation of CM system introduced for efficiency of public construction project. The promotion of Pilot Project is not only the settlement and activation of CM system but also the process to embody and diversify the CM system. Now we should develop various CM application type such as Owner type, PM type and type for private capital project in doing so. And with this efforts, we could expect that CM system should play an important role to enhance the efficiency of public construction works and should affect private construction sector.

  • PDF

A Study on the status and improvement of construction management in Susung Culture & Art Center (수성문화예술회관의 건설사업관리 적용 현황과 향후 발전 방향에 관한 연구)

  • Park, Byung-Hak;Yoo, Byung-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.45-52
    • /
    • 2006
  • Recently The public project ordering in local autonumous entities is a tendency increasing of CM service because of the visible and affirmative effect in the CM which is advanced meanwhile. And, the CM services of project all phase excepts a planning business are performed. To develop CM must be prepared the system plans concerned with the CM application from planning phase, actuality maintenance of CM fee-estimation standard, understanding conversion of participation subjects, the specialization through certification of CM qualification, etc. But, unexpected actuality the problems occurs when the CM business is performing. The purpose of this study are to present the solution to the problems concerned with the design management, design phase VE, additional business by owner, schedule control and establish the plan to perform CM services efficiently in the public sector through analyzing the case of CM application in Susung Culture & Art Center.

  • PDF

The Study of Improvements for CM Delivery System by the Analysis of Current CM Regulations and Status (CM 발주제도 및 현황분석에 따른 개선방안에 관한 연구)

  • Kim, Chan-Kyu
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.4
    • /
    • pp.1962-1967
    • /
    • 2011
  • Construction Management service has been consistently growing in both sales and diversified services. On the other hand the market has been solidified owing to monopoly of major companies and considerations of the services have not been sufficient so that construction management could not play a appropriate role of the construction industry. This research is to suggest the improvements of construction management delivery system based on the analysis of the current market. The method conducted was to analyze market survey, literature and statistical review, regulations, considerations and evaluation system. Through the analysis and research, the delivery system of construction management was proven rooms for improvements in regulation, consideration, and evaluation system. and this study presented those as fair as possible. It is hopefully expected that the expansion of CM market, impartial competition, and justifiable services are implemented in the construction industry.

A Study on Proposal to improve Domestic Construction Management Service Guide (국내 건설사업관리 업무지침의 개선(안)에 관한 연구)

  • Na, Kwang-Tae;Ryoo, Boong-Yeol;Kang, Byeung-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.3
    • /
    • pp.147-154
    • /
    • 2002
  • The Korean government makes an effort to raise the competitive power of nation through CM activation in the construction industry. Since the first CM service was applied to the atomic power plant project in 1986, the number of CM contracts are continuously being increased and will be up to 20% by 2002 in public sector. However, the public projects had been executed without any procedure manual or standard guideline of CM services. Meanwhile the Ministry of Construction and Transportation issued $\ulcorner$CM Service Guide$\lrcorner$, but the guide shows an indefinite description in the responsibility, authority and scope of activity for the project participants. Therefore, it is required the procedures be improved and scope of activities be established for the project participants. This study was generated from the comparative analysis of $\ulcorner$Standard CM Services and Practice$\lrcorner$ Published by CMAA and domestic $\ulcorner$CM Service Guide$\lrcorner$ and the case of Incheon International Airport construction. The purpose of this study is to provide the fundamental data for an improvement in the procedures of project execution and the construction manager's activities/rolls shown on $\ulcorner$CM Service Guide$\lrcorner$

Application of Selective Construction Management Services to Private Small-Medium Construction Projects (${\cdot}$ 소규모 건축공사의 선택적 건설사업관리 적용 방안)

  • Kim, Seong-Hwan;Mun, Kyung-Jick;Woo, Yu-Mi;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.305-309
    • /
    • 2006
  • Construction management system has been needed to be anchored and revitalize in these days, since it was entered into a domestic market. We could consider application of CM services as a challenge of construction project system and a way to get to an advanced nation in construction field. Application of CM services could be possible in public projects by a regime. However, in case of private construction projects, it is hard to apply it without understanding of substantial necessity and propriety. so in this study, we find a application method of CM services to private small-midium construction projects, and make CM services item table of CM services for revitalization by examining the cases that applied to in private small-medium construction projects.

  • PDF

A Study on the Investigation into Obstacles in Overseas CM Projects (해외 CM사업의 애로요인 분석에 관한 연구)

  • Kim, Jae-Hee;Kim, Han Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.113-121
    • /
    • 2013
  • An expansion into the global market increasingly becomes a buzz world among Construction Management(CM) firms in Korea. The objective of this study is to identify potential obstacles and investigate their nature and implications to CM firms in Korea. The study identified 25 obstacles under 5 categories. Base on a questionnaire survey and interviews with CM experts who have global CM projects experience, the study discusses that while there exist various types of obstacles, a more attention needs to be paid for a small number of major obstacles to minimine risks in overseas CM projects. It also suggests that improving pre-construction management competency through securing CM experts should be listed as a top agenda for Korean CM firms.